← Back
BuildNYC
Multi-story retail building (2+)
1890 EASTCHESTER ROAD
BRONX · BIN 2046946
💬 Discuss this project
1925Year Built
2Stories
K2Building Class
C4-4Zoning
11,600 sfGross Floor Area
13Units
0 Active Violations
Multi-story retail building (2+) · Owner of record: PJSM Realty · 10,000 sf lot · 1.16 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofLegalization of existing HVAC units on commercial building3p · 1 filing · 5 docs
Floor 1Kitty Liquor Store5p · 1 filing · 19 docs
Site & exteriorErect new illuminated sign2p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PJSM Realty803/21/2026
Healthy Fresh704/09/2026
PJSM703/21/2026
Coals303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KDV Designs Architects505/20/2025
Alpha Home Design103/26/2024
RS Design Associates102/21/2022
Max Disla Architect112/30/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
TBC & Associates1003/21/2026
RS Design Associates203/21/2026
LWL Associates203/21/2026
Indesign Studio203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Cape PlumbingPlumbing406/28/2026
R & T ElectricalElectrical103/21/2026
National MaintenanceElectrical103/21/2026
RS Design AssociatesGeneral Contractor107/08/2026
Neptune Signs & AwningsSign hanger107/08/2026
Panos ManagementGeneral Contractor107/08/2026
Triple Crown ElectricElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NS Engineering & Consulting3652205/20/2025
Yan Gao6619103/26/2024
Brian Ill Development1402112/30/2019
Building Lifecycle
All (50)Filed (8)Permit Issued (4)Signed Off (2)Violation (7)Inspection (2)Objection (16)Special Inspection (11)
07/07/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/07/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/21/2025
Special inspection requirement — Mechanical Systems
NARI MOTWANI
05/21/2025
Special inspection requirement — Final
DAVIDSON CHRISTMAS
05/20/2025
Filed — Alteration
INSTALLING NEW BUSINESS WALL SIGN AS PER PLANS SUBMITTED HEREWITH. WORDING ON SIGN IS " HEALTHY FRESH ". NO OTHER WORK PROPOSED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00675423-P1
05/20/2025
Filed — Alteration
INSTALLING NEW BUSINESS WALL SIGN AS PER PLANS SUBMITTED HEREWITH. WORDING ON SIGN IS " HEALTHY FRESH ". NO OTHER WORK PROPOSED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00675423-P2
05/20/2025
Filed — Alteration
INSTALLING NEW BUSINESS WALL SIGN AS PER PLANS SUBMITTED HEREWITH. WORDING ON SIGN IS " HEALTHY FRESH ". NO OTHER WORK PROPOSED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00675423-S3
05/20/2025
Special inspection requirement — Final
DAVIDSON CHRISTMAS
05/07/2025
Special inspection requirement — Mechanical Systems
NARI MOTWANI
05/07/2025
Special inspection requirement — Final
DAVIDSON CHRISTMAS
04/01/2025
Permit issued — Plumbing
X00675423-S2-PL
02/05/2025
Filed — Alteration
INSTALLING NEW BUSINESS WALL SIGN AS PER PLANS SUBMITTED HEREWITH. WORDING ON SIGN IS " HEALTHY FRESH ". NO OTHER WORK PROPOSED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00675423-S2
02/05/2025
Filed — Alteration
INSTALLING NEW BUSINESS WALL SIGN AS PER PLANS SUBMITTED HEREWITH. WORDING ON SIGN IS " HEALTHY FRESH ". NO OTHER WORK PROPOSED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00675423-S1
09/23/2024
Signed off — Alteration
INSTALL AN ILLUMINATED, NON-ADVERTISING, NON-FLASHING, STATIONARY ACCESSORY BUSINESS SIGN. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
X01025275-I1
05/28/2024
Permit issued — Sign
X01025275-I1-SG
04/11/2024
Objection resolved — Addressed
04/11/2024
Objection resolved — Addressed
04/02/2024
Objection resolved — Addressed
04/02/2024
Objection resolved — Addressed
04/02/2024
Objection resolved — Addressed
03/28/2024
Objection raised — Zoning
03/28/2024
Objection raised — Admin
03/28/2024
Objection raised — Zoning
03/28/2024
Objection raised — Zoning
03/28/2024
Objection raised — Zoning
03/26/2024
Filed — Alteration
INSTALL AN ILLUMINATED, NON-ADVERTISING, NON-FLASHING, STATIONARY ACCESSORY BUSINESS SIGN. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
X01025275-I1
03/25/2024
Special inspection requirement — Final
YAN GAO
03/25/2024
Special inspection requirement — Post-installed Anchors
YAN GAO
03/25/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
YAN GAO
02/05/2024
Violation issued (ECB, closed)
Construction
04/28/2022
Violation issued (ECB, closed)
Construction
03/02/2022
Permit issued — General Construction
X00675423-I1-GC
02/21/2022
Filed — Alteration
INSTALLING NEW BUSINESS WALL SIGN AS PER PLANS SUBMITTED HEREWITH. WORDING ON SIGN IS " HEALTHY FRESH ". NO OTHER WORK PROPOSED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00675423-I1
02/09/2022
Special inspection requirement — Interior lighting power
ERROL CRAWFORD
08/20/2020
Signed off — Alteration
X00274988-I1
05/18/2020
Permit issued — Mechanical Systems
X00274988-I1-MS
12/31/2019
Objection raised — Inspections
12/31/2019
Objection resolved — Addressed
12/31/2019
Objection raised — Other
12/31/2019
Objection resolved — Addressed
12/31/2019
Objection raised — Admin
12/31/2019
Objection resolved — Addressed
12/30/2019
Filed — Alteration
X00274988-I1
12/03/2019
Special inspection requirement — Final
BRIAN ILL
12/03/2019
Special inspection requirement — Mechanical Systems
BRIAN ILL
07/31/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/03/2013
Violation issued (ECB, closed)
Construction
05/02/2013
Violation issued (ECB, closed)
Construction
05/02/2013
Violation issued (ECB, closed)
Unknown
10/28/1993
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedCape Plumbing04/01/2025
DOB NOWSignSigned-offDesthers, Joseph05/28/2024
DOB NOWGeneral ConstructionPermit IssuedRS Design Associates03/02/2022
DOB NOWMechanical SystemsSigned-offPanos Management05/18/2020
BISOTISSUEDPanos Management02/24/2020
BISMHISSUEDAqel Sheet Metal09/26/2018
BIS—ISSUEDNational Maintenance12/23/2015
BIS—ISSUEDNational Maintenance12/23/2015
BISOTISSUEDNational Maintenance12/23/2015
BIS—ISSUEDNational Maintenance12/23/2015
BIS—ISSUEDNeptune Signs & Awnings08/10/2015
BIS—ISSUEDNeptune Signs & Awnings08/10/2015
BISPLISSUEDTop Plumbing Group07/09/2015
BISMHISSUED177 TS Group06/26/2015
BISEQISSUED177 TS Group06/26/2015
BISFPISSUEDNY Fire11/30/2011
BISPLISSUEDBarmor Rehab11/21/2011
BISEQISSUEDTriple 8 Construction10/11/2011
BISOTISSUEDTriple 8 Construction10/11/2011
BISFPISSUEDChief Fire Prevention & Mechanical04/08/2005
BISPLISSUEDCasa Mechanical Co03/31/2005
BISPLISSUEDMainland PLG & Heating08/31/1998
BISFPISSUEDIdeal Fire Control08/14/1998
BISPLISSUEDMainland Plumbing & Heating07/06/1998
BISOTISSUEDD.G. Construction06/23/1998
BIS—ISSUEDInterboro Sign & Maintenance Co11/14/1997
BISFPISSUEDMaster Fire Systems10/03/1997
BISPLISSUEDNew Plumbing & Heating08/14/1997
BISOTISSUEDEastchester Road Management10/25/1996
BISOTISSUEDEastchester Road Management11/14/1995
BISOTISSUEDEastchester Road Management08/24/1995
BISOTISSUEDTell Service11/10/1994
BISFPISSUEDLund Fire Products Co10/10/1991
1 project · most recent 05/20/2025
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/20/2025Permit IssuedRS Design AssociatesVentilation Systems
Ventilation
Captiveaire MODEL # USB124DD-RM 5,700 CFM · Kitchen Exhaust ×6
1 project · most recent 05/20/2025
Gas Water/Sanitary
FiledStatusContractorScope
05/20/2025Permit IssuedCape PlumbingGas, Water/Sanitary
2 projects · most recent 03/26/2025
General Wiring
FiledStatusContractorScope
03/26/2025Permit IssuedTriple Crown ElectricGeneral Wiring
10/23/2024CompleteAsko Electric Construction & Maintenance—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
07/07/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/07/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
05/21/2025Mechanical SystemsNARI MOTWANIspecial
05/21/2025FinalDAVIDSON CHRISTMASprogress
05/20/2025FinalDAVIDSON CHRISTMASprogress
05/07/2025Mechanical SystemsNARI MOTWANIspecial
05/07/2025FinalDAVIDSON CHRISTMASprogress
03/25/2024FinalYAN GAOprogress
03/25/2024Post-installed AnchorsYAN GAOspecial
03/25/2024Structural Stability – Alterations of existing buildingsYAN GAOspecial
02/09/2022Interior lighting powerERROL CRAWFORDenergy_progress
12/03/2019FinalBRIAN ILLprogress
12/03/2019Mechanical SystemsBRIAN ILLspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Kitty Liquor StoreRetailFloor 1, Roof
Project X00675423 Alteration · Permit Entire · 02/21/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 181 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch7
08/21/2026X01025275-I1Request digital key ↗
08/20/2026X00675423-S3Request digital key ↗
08/20/2026X00675423-P2Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/15/2026X00274988-I1Request digital key ↗
▸Applications & Permits35
▸BISWORK PERMIT APPLICATION18
02/25/2020220725909Open ↗
10/04/2018220661889Open ↗
12/24/2015220478365Open ↗
Showing 3 of 18 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION17
02/11/2020220725909Open ↗
08/07/2018220661889Open ↗
02/26/2016220478347Open ↗
Showing 3 of 17 on file for this type
▸Seals & Professional Certifications56
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION14
02/11/2020220725909Open ↗
08/07/2018220661889Open ↗
04/12/2016240099282Open ↗
Showing 3 of 14 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST12
02/11/2020220725909Open ↗
08/07/2018220661889Open ↗
12/24/2015220478347Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT11
02/11/2020220725909Open ↗
08/07/2018220661889Open ↗
12/24/2015220478347Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/26/2026X00274988-I1Open ↗
08/13/2026X00675423-P1Open ↗
08/13/2026X00675423-S1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/01/2026X00675423-I1Open ↗
09/01/2026X00274988-I1Open ↗
08/31/2026X00675423-S1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
10/11/2011220144813Open ↗
04/10/2009210115891Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026X00274988-I1Open ↗
08/31/2026X01025275-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
06/05/2015240099282Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/05/2015240099282Open ↗
▸Trade Schedules & Equipment15
▸BISSELF-CERT PLUMBING NOTICE7
03/07/2012220144813Open ↗
03/02/2012220144813Open ↗
01/12/2012220144813Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING3
06/05/2015240099282Open ↗
10/11/2011220144813Open ↗
04/10/2009210115891Open ↗
▸BISEQUIPMENT USE PERMITS2
04/12/2016240099282Open ↗
04/12/2016240099282Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
03/02/2012220144813Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
12/01/2015240099282Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
04/12/2016240099282Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes1
08/07/2018220661889Open ↗
▸BISSTREET TREE CHECKLIST1
04/13/2009210115891Open ↗
▸Environmental & Asbestos14
▸BISASBESTOS: CERTIFICATION (DEP ACP5)7
08/07/2018220661889Open ↗
12/24/2015220478347Open ↗
12/24/2015220478365Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/13/2026X00675423-S1Open ↗
08/13/2026X00675423-S2Open ↗
08/13/2026X00675423-P1Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
10/31/2011220147222Open ↗
10/11/2011220144813Open ↗
04/10/2009210115891Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
02/11/2020220725909Open ↗
08/07/2018220661889Open ↗
04/12/2016240099282Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
06/05/2015240099282Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
04/12/2016240099282Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
06/05/2015240099282Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
09/09/2020220725909Open ↗
▸BISNYCECC ANALYSIS1
06/05/2015240099282Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
09/09/2020220725909Open ↗
▸BISTECHNICAL REPORT: ENERGY1
10/11/2011220144813Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026X00274988-I1Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
06/05/2015240099282Open ↗
▸Approvals, Objections & Sign-offs5
▸BISADMINISTRATIVE OBJECTIONS3
10/31/2011220147222Open ↗
10/11/2011220144813Open ↗
04/10/2009210115891Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
09/09/2020220725909Open ↗
04/12/2016240099282Open ↗
▸Cost, Insurance & Ownership15
▸BISCOST AFFIDAVIT14
02/11/2020220725909Open ↗
08/07/2018220661889Open ↗
04/12/2016240099282Open ↗
Showing 3 of 14 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
09/09/2020220725909Open ↗
▸Filing & Intake Forms17
▸BISEFILING COVER SHEET13
02/11/2020220725909Open ↗
08/07/2018220661889Open ↗
12/24/2015220478347Open ↗
Showing 3 of 13 on file for this type
▸BISADDITIONAL INFORMATION3
02/26/2016220478347Open ↗
12/01/2015240099282Open ↗
11/19/2011220144813Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
06/05/2015240099282Open ↗
▸Other Documents2
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
09/09/2020220725909Open ↗
06/05/2015240099282Open ↗