← Back
Over six families without stores
1890 WALTON AVENUE
BRONX · BIN 2007904
💬 Discuss this project
1927Year Built
4Stories
C1Building Class
R8Zoning
6,148 sfGross Floor Area
8Units
Rent Stabilized2 Open Violations ▸FDNY Report ↗
Over six families without stores · Owner of record: YUMF EQUITIES LLC · 2,000 sf lot · 3.07 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Floor 429p · 1 filing · 20 docs
Floor 328p · 1 filing · 20 docs
Floor 230p · 1 filing · 20 docs
Floor 129p · 1 filing · 20 docs
Cellar30p · 1 filing · 20 docs
1 job · most recent 09/03/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/03/2025Permit IssuedBUILDERS GROUP USA INCHeating and Air Conditioning Systems
Heat / Cool
Daikin 4MXM36AVJU9 36,600 BTU · Heat Pump Outdoor ×10
2MXM18AVJU9 18,500 BTU · Heat Pump Outdoor ×8
3MXM24AVJU9 24,000 BTU · Heat Pump Outdoor ×6
1 job · most recent 09/03/2025
Sprinkler System
FiledStatusContractorScope
09/03/2025Signed-offTARGET PIPING NY LLCSprinkler System
1 job · most recent 09/03/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
09/03/2025Signed-offTARGET PIPING NY LLCGas, Storm, Water/Sanitary
3 jobs · most recent 11/25/2025
General Wiring
FiledStatusContractorScope
11/25/2025CompleteBROOKLYN POWER ELECTRIC CGeneral Wiring
09/09/2025CompleteFRIED ELECTRIC CO.General Wiring
12/12/2024CompleteSPICE ELECTRIC COMPANY—
Building Lifecycle
All (139)Filed (14)Permit Issued (7)Signed Off (6)Violation (60)Inspection (12)Objection (10)Special Inspection (30)
04/10/2026
Signed off — Alteration CO
PROPOSED INTERIOR RENOVATION CONVERTING EXISTING 4 STORY AND CELLAR, INTO A 10 UNIT RESIDENTIAL BUILDING.
X01117418-I1
04/06/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/24/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/24/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/24/2026
Signed off — Alteration CO
PROPOSED INTERIOR RENOVATION CONVERTING EXISTING 4 STORY AND CELLAR, INTO A 10 UNIT RESIDENTIAL BUILDING.
X01117418-S1
02/24/2026
Signed off — Alteration CO
PROPOSED INTERIOR RENOVATION CONVERTING EXISTING 4 STORY AND CELLAR, INTO A 10 UNIT RESIDENTIAL BUILDING.
X01117418-S3
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/12/2025
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
09/12/2025
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
09/12/2025
Special inspection requirement — Permanent certificate
FAHAD FATEH
09/12/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
09/12/2025
Special inspection requirement — Fenestration areas
FAHAD FATEH
09/12/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
09/12/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
09/12/2025
Special inspection requirement — Interior lighting power
FAHAD FATEH
09/12/2025
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
09/12/2025
Special inspection requirement — Metering
FAHAD FATEH
09/12/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
09/12/2025
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
09/12/2025
Special inspection requirement — Lighting controls
FAHAD FATEH
09/03/2025
Filed — Alteration CO
PROPOSED INTERIOR RENOVATION CONVERTING EXISTING 4 STORY AND CELLAR, INTO A 10 UNIT RESIDENTIAL BUILDING.
X01117418-P8
08/29/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
08/29/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
08/29/2025
Special inspection requirement — Fenestration areas
FAHAD FATEH
08/29/2025
Special inspection requirement — Metering
FAHAD FATEH
08/29/2025
Special inspection requirement — Permanent certificate
FAHAD FATEH
08/29/2025
Special inspection requirement — Lighting controls
FAHAD FATEH
08/29/2025
Special inspection requirement — Interior lighting power
FAHAD FATEH
08/29/2025
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
08/29/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
08/29/2025
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
08/29/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
08/29/2025
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
08/29/2025
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
08/15/2025
Signed off — Alteration CO
PROPOSED INTERIOR RENOVATION CONVERTING EXISTING 4 STORY AND CELLAR, INTO A 10 UNIT RESIDENTIAL BUILDING.
X01117418-S2
08/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
08/14/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
08/14/2025
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
08/14/2025
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
08/06/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/28/2025
Filed — Alteration CO
PROPOSED INTERIOR RENOVATION CONVERTING EXISTING 4 STORY AND CELLAR, INTO A 10 UNIT RESIDENTIAL BUILDING.
X01117418-P6
07/24/2025
Signed off — Alteration CO
PROPOSED INTERIOR RENOVATION CONVERTING EXISTING 4 STORY AND CELLAR, INTO A 10 UNIT RESIDENTIAL BUILDING.
X01117418-S4
07/22/2025
Filed — Alteration CO
PROPOSED INTERIOR RENOVATION CONVERTING EXISTING 4 STORY AND CELLAR, INTO A 10 UNIT RESIDENTIAL BUILDING.
X01117418-P7
07/22/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/21/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/08/2025
Objection resolved — Addressed
07/03/2025
Objection raised — Other
07/02/2025
Objection resolved — Addressed
07/01/2025
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
06/30/2025
Objection resolved — Addressed
06/26/2025
Filed — Alteration CO
PROPOSED INTERIOR RENOVATION CONVERTING EXISTING 4 STORY AND CELLAR, INTO A 10 UNIT RESIDENTIAL BUILDING.
X01117418-P5
06/26/2025
Objection raised — Other
06/23/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/23/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/16/2025
Objection resolved — Addressed
06/12/2025
Objection raised — Other
06/12/2025
Objection raised — Energy
06/11/2025
Filed — Alteration CO
PROPOSED INTERIOR RENOVATION CONVERTING EXISTING 4 STORY AND CELLAR, INTO A 10 UNIT RESIDENTIAL BUILDING.
X01117418-P4
06/05/2025
Violation issued (HPD, closed)
A
05/20/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
Latest 60 of 139 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HOUSING PRESERVATION & DEVELOPMENT503/22/2026
YUMF EQUITIES LLC403/22/2026
BUILDERS GROUP USA303/22/2026
NIRAN REALTY CORP303/22/2026
FRIED ELECTRIC CO.103/22/2026
1890 WALTON REALTY CORP103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/21/2024$780K—NIRAN REALTY CORP. → YUMF EQUITIES LLC$127/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AG ENGINEERING PLLC1209/03/2025
RIGID STRUCTURAL DESIGN, LLC112/20/2024
VASILIOS ARTEMIOU PE111/04/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPRESS FILING INC2603/21/2026
Rigid Structural Design, LLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BUILDERS GROUP USA INCGeneral Contractor607/08/2026
CARLITOS CONTRACTING CORPGeneral Contractor303/21/2026
FRIED ELECTRIC CO.Electrical103/22/2026
TARGET PIPING NY LLCFire Protection107/08/2026
B&B MECH PLBG & HTG LLCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161309/03/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedBUILDERS GROUP USA04/09/2025
DOB NOWPlumbingSigned-offTARGET PIPING NY LLC01/31/2025
DOB NOWSprinklersSigned-offTARGET PIPING NY LLC01/31/2025
DOB NOWStructuralSigned-offBUILDERS GROUP USA01/30/2025
DOB NOWGeneral ConstructionPermit IssuedBUILDERS GROUP USA01/29/2025
DOB NOWMechanical SystemsSigned-offBUILDERS GROUP USA01/24/2025
DOB NOWSidewalk ShedSigned-offCARLITOS CONTRACTING CORP01/06/2025
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
04/06/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/24/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/24/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/06/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/22/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/21/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/01/2025Pass-Final SP - Up to 9 Requested FloorsPassView ↗
06/23/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/23/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/20/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/06/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
03/26/2025Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 90
DateRequirementInspectorRole
09/12/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
09/12/2025Fenestration air leakageFAHAD FATEHenergy_progress
09/12/2025Lighting in dwelling unitsFAHAD FATEHenergy_progress
09/12/2025Fenestration areasFAHAD FATEHenergy_progress
09/12/2025Interior lighting powerFAHAD FATEHenergy_progress
09/12/2025Permanent certificateFAHAD FATEHenergy_progress
09/12/2025Insulation placement and R valuesFAHAD FATEHenergy_progress
09/12/2025Lighting controlsFAHAD FATEHenergy_progress
09/12/2025Maintenance informationFAHAD FATEHenergy_progress
09/12/2025Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
09/12/2025MeteringFAHAD FATEHenergy_progress
09/12/2025Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
09/12/2025Fire-Resistance Rated ConstructionFAHAD FATEHprogress
08/29/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
08/29/2025Interior lighting powerFAHAD FATEHenergy_progress
08/29/2025Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
08/29/2025Maintenance informationFAHAD FATEHenergy_progress
08/29/2025Fenestration areasFAHAD FATEHenergy_progress
08/29/2025Insulation placement and R valuesFAHAD FATEHenergy_progress
08/29/2025Permanent certificateFAHAD FATEHenergy_progress
08/29/2025Fire-Resistance Rated ConstructionFAHAD FATEHprogress
08/29/2025Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
08/29/2025MeteringFAHAD FATEHenergy_progress
08/29/2025Lighting controlsFAHAD FATEHenergy_progress
08/29/2025Fenestration air leakageFAHAD FATEHenergy_progress
Latest 25 of 90.
▾Documents — 94 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
08/20/2026X01155180-I1Request digital key ↗
08/20/2026X01117418-P3Request digital key ↗
08/20/2026X01117418-P1Request digital key ↗
Showing 3 of 14 on file for this type
▸Seals & Professional Certifications43
▸DOB NOWProgress Inspector Seal & Signature18
08/28/2026X01117418-P3Open ↗
08/28/2026X01117418-P3Open ↗
08/28/2026X01117418-S2Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/20/2026X01155180-I1Open ↗
08/20/2026X01117418-P4Open ↗
08/20/2026X01117418-P3Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
08/28/2026X01117418-P3Open ↗
08/28/2026X01117418-S2Open ↗
08/28/2026X01117418-S2Open ↗
Showing 3 of 11 on file for this type
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist5
08/20/2026X01117418-I1Open ↗
08/20/2026X01117418-P8Open ↗
08/20/2026X01117418-P7Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
08/20/2026X01117418-P3Open ↗
08/20/2026X01117418-P1Open ↗
08/20/2026X01117418-S4Open ↗
Showing 3 of 13 on file for this type
▸Other Documents19
▸DOB NOWDHCR Document13
08/13/2026X01117418-S4Open ↗
08/13/2026X01117418-P1Open ↗
08/13/2026X01117418-P5Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProperty Ownership Certification5
08/20/2026X01117418-I1Open ↗
08/20/2026X01117418-P8Open ↗
08/20/2026X01117418-P7Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026X01117418-S4Open ↗