University Avenue Rehab
1895 UNIVERSITY AVENUE · University Heights (South)-Morris Heights · BIN 2009055
💬 Discuss this project
1924Year Built
6Stories
D1Building Class
R7-1Zoning
55,566 sfGross Floor Area
47Units
LL97 CoveredRent Stabilized7 Open Violations ▸FISP: SAFE
Elevator apt, semi-fireproof without stores · Owner of record: NYC HOUSING AUTHORITY · 13,750 sf lot · 4.04 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Permit Issued — active, not yet Signed-off
Roof7p · 3 filings · 20 docs
Bulkhead4p · 2 filings · 20 docs
Floor 6Under Construction19p · 1 filing · 20 docs
Floor 5Under Construction18p · 1 filing · 20 docs
Floor 4Under Construction18p · 1 filing · 20 docs
Floor 3Under Construction18p · 1 filing · 20 docs
Floor 2Under Construction18p · 1 filing · 20 docs
Floor 1Under Construction24p · 1 filing · 20 docs
CellarUnder Construction33p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NW BRONX OZ HOUSING PRESERVATION909/08/2026
NYCHA3007/08/2026
NEW YORK CITY HOUSING AUTHORITY2507/08/2026
NYC HOUSING AUTHORITY603/22/2026
ZORIA HOUSING103/22/2026
N.Y.C.H.A. 996103/22/2026
NYCHA 99103/22/2026
EAST COAST PETROLEUM103/22/2026
MECHANICAL MINDS LLC103/22/2026
UNION HOUSING PRESERVATION403/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AK CONSULTING SERVICES2803/21/2026
LGML GROUP203/21/2026
W J PROFESSIONAL EXPEDITING1403/21/2026
UNITED SAFETY CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
P & K CONTRACTING INCGeneral Contractor1507/08/2026
MNK ENTERPRISES LLCGeneral Contractor1107/08/2026
SKYWORX CONTRACTING INCGeneral Contractor807/08/2026
RENEWAL CONSTRUCTION SERVICESGeneral Contractor307/22/2026
RUGOVA GROUP LLCPlumbing206/28/2026
SPRING SCAFFOLDING LLCGeneral Contractor204/09/2026
ROMCON ELECTRIC, INCElectrical103/22/2026
LAURA ELEC'L LIGHTING &Electrical103/22/2026
JOSEPH SORTINOElectrical103/21/2026
INGLESE, PASQUALEElectrical103/21/2026
CONSTANCE GARGIULOElectrical103/21/2026
WRUBEL, CHAIMElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SANDEEP GUNNALA ENGINEERI84821206/18/2026
AK CONSULTING SERVICES, I6198104/15/2026
SOCOTEC ENGINEERING4983310/04/2023
BITOPI CONSULTANTS LLC7036405/14/2021
Building Lifecycle
All (147)Filed (29)Permit Issued (30)Signed Off (11)Facade (FISP) (15)Violation (29)Inspection (2)Objection (1)Special Inspection (30)
07/20/2026
Permit issued — General Construction
X01047048-S5-GC
06/18/2026
Filed — Alteration
Installation of four (4) Gas-Fired Boilers in Cellar as part of Moderate tenant in place rehabilitation. No Change in Egress, Use, Zoning, or Occupancy.
X01047048-S5
06/11/2026
Special inspection requirement — Tenant Protection Plan Compliance
06/11/2026
Special inspection requirement — HVAC-R and service water heating equipment
Sandeep Gunnala
06/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Sandeep Gunnala
06/11/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Sandeep Gunnala
06/11/2026
Special inspection requirement — HVAC-R and service water heating system controls
Sandeep Gunnala
06/09/2026
Filed — Alteration
Installation of four (4) Gas-Fired Boilers in Cellar as part of Moderate tenant in place rehabilitation. No Change in Egress, Use, Zoning, or Occupancy.
X01047048-P5
05/28/2026
Violation issued (HPD, closed)
C
05/18/2026
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE SIDEWALK SHED IS IN FRONT OF THE BUILDING AT UNIVERSITY AVENUE ELEVATION.
X01343923-P1
05/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Sandeep Gunnala
05/05/2026
Special inspection requirement — HVAC-R and service water heating system controls
Sandeep Gunnala
05/05/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Sandeep Gunnala
05/05/2026
Special inspection requirement — Tenant Protection Plan Compliance
05/05/2026
Special inspection requirement — HVAC-R and service water heating equipment
Sandeep Gunnala
04/23/2026
Filed — Alteration
Installation of four (4) Gas-Fired Boilers in Cellar as part of Moderate tenant in place rehabilitation. No Change in Egress, Use, Zoning, or Occupancy.
X01047048-P4
04/22/2026
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
04/20/2026
Permit issued — Supported Scaffold
X01386449-I1-SF
04/20/2026
Special inspection requirement — Tenant Protection Plan Compliance
04/20/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Sandeep Gunnala
04/20/2026
Special inspection requirement — HVAC-R and service water heating system controls
Sandeep Gunnala
04/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Sandeep Gunnala
04/20/2026
Special inspection requirement — HVAC-R and service water heating equipment
Sandeep Gunnala
04/15/2026
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLD AT 1895 UNIVERSITY AVENUE BRONX NY AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
X01386449-I1
04/13/2026
Special inspection requirement — Post-installed Anchors
WALIUR RAHMAN
04/09/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
03/02/2026
Permit issued — Sidewalk Shed
X01343923-I1-SH
02/09/2026
Permit issued — General Construction
X01047048-I1-GC
01/13/2026
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE SIDEWALK SHED IS IN FRONT OF THE BUILDING AT UNIVERSITY AVENUE ELEVATION.
X01343923-I1
01/13/2026
Permit issued — Sidewalk Shed
X01343923-I1-SH
12/16/2025
Filed — Alteration
Installation of four (4) Gas-Fired Boilers in Cellar as part of Moderate tenant in place rehabilitation. No Change in Egress, Use, Zoning, or Occupancy.
X01047048-P2
12/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Sandeep Gunnala
12/16/2025
Special inspection requirement — HVAC-R and service water heating equipment
Sandeep Gunnala
12/16/2025
Special inspection requirement — HVAC-R and service water heating system controls
Sandeep Gunnala
12/16/2025
Special inspection requirement — Tenant Protection Plan Compliance
12/16/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Sandeep Gunnala
10/07/2025
Special inspection requirement — Electrical motors and elevators
Sandeep Gunnala
10/07/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Sandeep Gunnala
10/07/2025
Special inspection requirement — Shutoff dampers
Sandeep Gunnala
10/07/2025
Special inspection requirement — HVAC-R and service water heating system controls
Sandeep Gunnala
10/07/2025
Special inspection requirement — Final
Sandeep Gunnala
10/07/2025
Special inspection requirement — Tenant Protection Plan Compliance
Sandeep Gunnala
10/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Sandeep Gunnala
10/07/2025
Special inspection requirement — HVAC-R and service water heating equipment
Sandeep Gunnala
10/07/2025
Special inspection requirement — Mechanical Systems
Sandeep Gunnala
10/06/2025
Filed — Alteration
Installation of four (4) Gas-Fired Boilers in Cellar as part of Moderate tenant in place rehabilitation. No Change in Egress, Use, Zoning, or Occupancy.
X01047048-P1
07/25/2025
Permit issued — Plumbing
X01047048-S3-PL
07/25/2025
Permit issued — Boiler Equipment
X01047048-S4-BE
06/11/2025
Permit issued — General Construction
X01047048-I1-GC
05/20/2025
Signed off — Alteration
roofing replacement and roof structure repair per plans herewith. no change in use, egress or occupancy under this application.
X00786531-I1
03/19/2025
Filed — Alteration
Installation of four (4) Gas-Fired Boilers in Cellar as part of Moderate tenant in place rehabilitation. No Change in Egress, Use, Zoning, or Occupancy.
X01047048-S4
03/19/2025
Filed — Alteration
Installation of four (4) Gas-Fired Boilers in Cellar as part of Moderate tenant in place rehabilitation. No Change in Egress, Use, Zoning, or Occupancy.
X01047048-S2
03/19/2025
Filed — Alteration
Installation of four (4) Gas-Fired Boilers in Cellar as part of Moderate tenant in place rehabilitation. No Change in Egress, Use, Zoning, or Occupancy.
X01047048-S1
03/16/2025
Signed off — Alteration
X00952241-I1
03/16/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AT 1895 UNIVERSITY AVENUE, BRONX AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
X00952238-I1
03/10/2025
Filed — Alteration
Installation of four (4) Gas-Fired Boilers in Cellar as part of Moderate tenant in place rehabilitation. No Change in Egress, Use, Zoning, or Occupancy.
X01047048-S3
02/17/2025
Signed off — Alteration
INSTALLATION OF NEW SIDEWALK SHED AT 1895 UNIVERSITY AVENUE, BRONX AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
X00952240-I1
02/17/2025
Signed off — Alteration
INSTALLATION OF DEBRIS CHUTE AT 1895 UNIVERSITY AVENUE, BRONX 10453 AS PER INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
X01077640-I1
10/07/2024
Permit issued — Structural
X00786531-I1-ST
10/04/2024
Permit issued — Structural
X00786531-I1-GC
Latest 60 of 147 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedRENEWAL CONSTRUCTION SERVICES07/20/2026
DOB NOWSupported ScaffoldPermit IssuedP & K CONTRACTING INC04/20/2026
DOB NOWSidewalk ShedPermit IssuedSPRING SCAFFOLDING LLC03/02/2026
DOB NOWGeneral ConstructionPermit IssuedRENEWAL CONSTRUCTION SERV02/09/2026
DOB NOWSidewalk ShedPermit IssuedSPRING SCAFFOLDING LLC01/13/2026
DOB NOWPlumbingSigned-offRUGOVA GROUP LLC07/25/2025
DOB NOWBoiler EquipmentSigned-offRUGOVA GROUP LLC07/25/2025
DOB NOWGeneral ConstructionPermit IssuedRENEWAL CONSTRUCTION SERV06/11/2025
DOB NOWStructuralSigned-offP & K CONTRACTING INC10/07/2024
DOB NOWStructuralSigned-offP & K CONTRACTING INC10/04/2024
DOB NOWProtection and Mechanical MethodsSigned-offMNK ENTERPRISES LLC07/15/2024
DOB NOWSidewalk ShedSigned-offMNK ENTERPRISES LLC07/03/2024
DOB NOWSupported ScaffoldSigned-offMNK ENTERPRISES LLC07/03/2024
DOB NOWConstruction FenceSigned-offMNK ENTERPRISES LLC07/03/2024
DOB NOWSuspended ScaffoldPermit IssuedD&N CONST & CONSULTNG INC03/29/2024
DOB NOWSuspended ScaffoldPermit IssuedD&N CONST & CONSULTNG INC01/16/2024
DOB NOWGeneral ConstructionSigned-offP & K CONTRACTING INC11/13/2023
DOB NOWStructuralSigned-offP & K CONTRACTING INC11/13/2023
DOB NOWConstruction FenceSigned-offMNK ENTERPRISES LLC10/31/2023
DOB NOWSidewalk ShedSigned-offMNK ENTERPRISES LLC10/31/2023
DOB NOWSupported ScaffoldSigned-offMNK ENTERPRISES LLC10/31/2023
DOB NOWGeneral ConstructionSigned-offP & K CONTRACTING INC07/18/2021
DOB NOWSidewalk ShedSigned-offSKYWORX CONTRACTING INC06/28/2021
DOB NOWConstruction FenceSigned-offSKYWORX CONTRACTING INC06/25/2021
DOB NOWGeneral ConstructionSigned-offP & K CONTRACTING INC04/15/2021
DOB NOWSupported ScaffoldSigned-offSKYWORX CONTRACTING INC03/08/2021
DOB NOWSidewalk ShedSigned-offSKYWORX CONTRACTING INC07/01/2020
DOB NOWConstruction FenceSigned-offSKYWORX CONTRACTING INC06/01/2020
DOB NOWConstruction FenceSigned-offP & K CONTRACTING INC01/21/2020
DOB NOWSidewalk ShedSigned-offP & K CONTRACTING INC01/15/2020
BISPLISSUEDEAST COAST MECHANICAL LLC05/26/2023
BISEQISSUEDSKYWORX CONTRACTING INC03/22/2019
BISFBISSUEDEAST COAST MECHANICAL LLC09/13/2018
BISOTISSUEDDREAMLAND CONSTRUCTION IN05/11/2018
BISPLISSUEDEAST COAST MECHANICAL LLC03/29/2018
BISFBISSUEDEAST COAST MECHANICAL LLC03/29/2018
BISEQISSUEDSKYWORX CONTRACTING INC03/27/2018
BISEQISSUEDSKYWORX CONTRACTING INC04/03/2017
BISEQISSUEDSKYWORX CONTRACTING INC03/09/2016
BISEQISSUEDNEELAM CONSTRUCTION CORP03/08/2016
+ 6 more permits on file
1 project · most recent 06/18/2026
Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/18/2026Permit IssuedRENEWAL CONSTRUCTION SERVHeating Systems, Ventilation Systems
Heating
Vulcan Linovector 620 BTU · Radiant ×94
Ventilation
Greenheck G-097-VG 1,385 CFM · Exhaust Fan ×14
1 project · most recent 06/18/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
06/18/2026Signed-offRUGOVA GROUP LLCGas, Storm, Water/Sanitary
10 projects · most recent 05/21/2026
General Wiring Boiler Controls
FiledStatusContractorScope
05/21/2026Permit IssuedLIT MODE ELECL CONTG INC—
01/13/2026Permit IssuedTOP SHELF ELECTRIC CORP—
01/12/2026CompleteLAURA ELEC'L LIGHTING &—
06/16/2025Permit IssuedASCUATECH ELECTRICAL CORP—
05/21/2024CompleteLIT MODE ELECL CONTG INC—
02/27/2024CompleteLIT MODE ELECL CONTG INC—
03/11/2023CompleteCSI SEC & ELECTRIC INCGeneral Wiring
03/08/2021CompleteAMIN ELECTRICAL CORP—
01/09/2020CompleteAMIN ELECTRICAL CORP—
04/11/2018CompleteROMCON ELECTRIC, INCBoiler Controls
3 projects · most recent 05/18/2026
Scaffold Sidewalk Shed
FiledStatusContractorScope
05/18/2026Permit IssuedSPRING SCAFFOLDING LLCSidewalk Shed
04/15/2026Permit IssuedP & K CONTRACTING INCScaffold
05/28/2020——Scaffold
1 project · most recent 01/05/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
01/05/2024Permit IssuedP & K CONTRACTING INCSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
04/22/2026Pass-Final Boiler Equipment InspectionPassView ↗
04/09/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 66
DateRequirementInspectorRole
06/11/2026Tenant Protection Plan Compliance—special
06/11/2026HVAC-R and service water heating system controlsSandeep Gunnalaenergy_progress
06/11/2026HVAC-R and service water heating equipmentSandeep Gunnalaenergy_progress
06/11/2026HVAC-R and service water piping design and insulationSandeep Gunnalaenergy_progress
06/11/2026Fire-Resistant Penetrations and JointsSandeep Gunnalaspecial
05/05/2026Fire-Resistant Penetrations and JointsSandeep Gunnalaspecial
05/05/2026HVAC-R and service water piping design and insulationSandeep Gunnalaenergy_progress
05/05/2026HVAC-R and service water heating equipmentSandeep Gunnalaenergy_progress
05/05/2026Tenant Protection Plan Compliance—special
05/05/2026HVAC-R and service water heating system controlsSandeep Gunnalaenergy_progress
04/20/2026Tenant Protection Plan Compliance—special
04/20/2026Fire-Resistant Penetrations and JointsSandeep Gunnalaspecial
04/20/2026HVAC-R and service water piping design and insulationSandeep Gunnalaenergy_progress
04/20/2026HVAC-R and service water heating system controlsSandeep Gunnalaenergy_progress
04/20/2026HVAC-R and service water heating equipmentSandeep Gunnalaenergy_progress
04/13/2026Post-installed AnchorsWALIUR RAHMANspecial
12/16/2025Fire-Resistant Penetrations and JointsSandeep Gunnalaspecial
12/16/2025HVAC-R and service water piping design and insulationSandeep Gunnalaenergy_progress
12/16/2025HVAC-R and service water heating system controlsSandeep Gunnalaenergy_progress
12/16/2025HVAC-R and service water heating equipmentSandeep Gunnalaenergy_progress
12/16/2025Tenant Protection Plan Compliance—special
10/07/2025Electrical motors and elevatorsSandeep Gunnalaenergy_progress
10/07/2025HVAC-R and service water piping design and insulationSandeep Gunnalaenergy_progress
10/07/2025Shutoff dampersSandeep Gunnalaenergy_progress
10/07/2025HVAC-R and service water heating system controlsSandeep Gunnalaenergy_progress
Latest 25 of 66.
▾Documents — 288 on file (BIS + DOB NOW)
▸Plans & Drawings29
▸DOB NOWPlans/Sketch24
08/25/2026X00477872-I1Request digital key ↗
08/25/2026X00479913-P1Request digital key ↗
08/25/2026X00479913-I1Request digital key ↗
Showing 3 of 24 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed2
08/26/2026X00294374-I1Request digital key ↗
08/26/2026X00326462-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence2
08/26/2026X00295208-I1Request digital key ↗
08/26/2026X00326449-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
08/26/2026X00349849-I1Request digital key ↗
▸Applications & Permits29
▸BISPLAN / WORK APPROVAL APPLICATION17
08/08/2023220641321Open ↗
08/07/2023220641321Open ↗
05/19/2023220641321Open ↗
Showing 3 of 17 on file for this type
▸BISWORK PERMIT APPLICATION12
05/30/2023220641321Open ↗
03/25/2019240134868Open ↗
05/15/2018220646683Open ↗
Showing 3 of 12 on file for this type
▸Seals & Professional Certifications114
▸DOB NOWProgress Inspector Seal & Signature39
09/30/2026X01047048-P5Open ↗
09/30/2026X01047048-P5Open ↗
09/30/2026X01047048-P5Open ↗
Showing 3 of 39 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature29
08/26/2026X00295208-I1Open ↗
08/26/2026X00326449-I1Open ↗
08/26/2026X00326462-I1Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature17
09/30/2026X01047048-P5Open ↗
09/26/2026X00477872-I1Open ↗
09/23/2026X01047048-S4Open ↗
Showing 3 of 17 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION9
02/19/2020240134724Open ↗
02/19/2020240134868Open ↗
02/06/2020240134868Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT8
02/06/2020240134868Open ↗
02/06/2020240134724Open ↗
04/30/2018220646683Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
03/08/2016240134868Open ↗
03/07/2016240134724Open ↗
12/17/2014240084500Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
03/08/2016240134868Open ↗
03/07/2016240134724Open ↗
12/17/2014240084500Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
02/06/2020240134868Open ↗
02/06/2020240134724Open ↗
04/30/2018220646683Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment3
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
04/02/2018220641321Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
04/02/2018220641321Open ↗
▸BISSCHEDULE B - PLUMBING1
08/07/2023220641321Open ↗
▸Safety & Tenant Protection7
▸DOB NOWTenant Protection Plan5
08/13/2026X00326449-I1Open ↗
08/13/2026X00349849-I1Open ↗
08/13/2026X00295208-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTenant Protection Plan and Notes2
02/06/2020240134868Open ↗
02/06/2020240134724Open ↗
▸Environmental & Asbestos14
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/25/2026X00480148-I1Open ↗
08/16/2026X01047048-S5Open ↗
08/16/2026X01047048-P5Open ↗
Showing 3 of 11 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
04/02/2018220641321Open ↗
12/09/2014240083495Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/24/2026X00786531-I1Open ↗
▸Energy Compliance9
▸BISAS-BUILT ENERGY ANALYSIS2
08/28/2023220641321Open ↗
08/21/2023220641321Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING2
03/08/2016240134868Open ↗
12/17/2014240084500Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
08/28/2023220641321Open ↗
08/21/2023220641321Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
04/30/2018220646683Open ↗
04/02/2018220641321Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026X00786531-I1Open ↗
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: RESPONSIBILITY6
08/28/2023220641321Open ↗
08/21/2023220641321Open ↗
03/08/2016240134868Open ↗
Showing 3 of 6 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)2
03/08/2016240134868Open ↗
03/07/2016240134724Open ↗
▸Approvals, Objections & Sign-offs50
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter27
08/26/2026X00326449-I1Open ↗
08/25/2026X00480148-I1Open ↗
08/24/2026X00786531-I1Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)8
08/13/2026X00326449-I1Open ↗
08/13/2026X00477872-I1Open ↗
08/13/2026X00480148-I1Open ↗
Showing 3 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
05/30/2023220641321Open ↗
03/29/2018240134868Open ↗
04/19/2017240134868Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
02/19/2020240134724Open ↗
02/19/2020240134868Open ↗
06/17/2015240084500Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)3
08/13/2026X00294374-I1Open ↗
08/13/2026X00295208-I1Open ↗
08/13/2026X00480148-I1Open ↗
▸BISTAP LETTER - DOM SVC : DEP-DOM1
04/30/2018220646683Open ↗
▸BISSHED LETTER1
03/25/2019240134868Open ↗
▸DOB NOWDEP Variance (V5) letter1
08/24/2026X00786531-I1Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
08/28/2023220641321Open ↗
08/21/2023220641321Open ↗
04/02/2018220641321Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms16
▸BISADDITIONAL INFORMATION5
05/19/2023220641321Open ↗
02/06/2020240134868Open ↗
02/06/2020240134724Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM5
05/30/2023220641321Open ↗
02/19/2020240134724Open ↗
02/19/2020240134868Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
03/08/2016240134868Open ↗
03/07/2016240134724Open ↗
12/17/2014240084500Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET2
04/30/2018220646683Open ↗
04/02/2018220641321Open ↗
▸Other Documents4
▸BISFEE EXEMPTION DOCUMENTATION2
03/08/2016240134868Open ↗
03/07/2016240134724Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026X00984283-I1Open ↗
▸DOB NOWCalculations1
08/13/2026X00984283-I1Open ↗