Elevator apt, semi-fireproof without stores
1896 UNIVERSITY AVENUE
BRONX · BIN 2129758
💬 Discuss this project
2023Year Built
8Stories
D1Building Class
R7-1Zoning
35,852 sfGross Floor Area
53Units
Rent Stabilized4 Open Violations ▸
Elevator apt, semi-fireproof without stores · Owner of record: GW UNIVERSE LLC · 9,027 sf lot · 3.97 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Roof25p · 1 filing · 20 docs
Floor 826p · 1 filing · 20 docs
Floor 725p · 1 filing · 20 docs
Floor 625p · 1 filing · 20 docs
Floor 525p · 1 filing · 20 docs
Floor 425p · 1 filing · 20 docs
Floor 325p · 1 filing · 20 docs
Floor 228p · 2 filings · 20 docs
Floor 127p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PRIME PROPERTY MANAGEMENT2507/08/2026
OWNERS REP507/08/2026
GW UNIVERSE LLC203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/16/2022$775K—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPRESS FILING INC1803/21/2026
AVALON DESIGNS1403/21/2026
GREEN STUDIO203/21/2026
E&A DESIGN AND EXPEDITER CORP.203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
INNOVATIVE CONSTR NYC LLCGeneral Contractor2407/08/2026
STELLAR INDUSTRIES INCGeneral Contractor303/21/2026
MANHATTAN D ENTERPRISESGeneral Contractor207/08/2026
YOSEF BLAUElectrical103/21/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
GO GREENER PLUMBING LLCPlumbing107/08/2026
ILLUMINATIONS UNLMTD ELECElectrical103/22/2026
PRIME PIPING & HEATING INPlumbing107/08/2026
SOLAS ELECTRICAL CORPElectrical103/22/2026
S&R ELECTRICAL & MECHANICElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161003/13/2024
JOSE L. PENA, P.E5969103/17/2021
Building Lifecycle
All (155)Filed (18)Permit Issued (15)Signed Off (9)Violation (7)Inspection (14)Objection (62)Special Inspection (30)
07/11/2026
Violation issued (HPD, open)
C
05/11/2026
Violation issued (HPD, closed)
A
09/24/2025
Violation issued (HPD, open)
B
09/24/2025
Violation issued (HPD, closed)
C
09/24/2025
Violation issued (HPD, open)
C
09/03/2025
Violation issued (HPD, closed)
C
09/03/2025
Violation issued (HPD, open)
B
12/27/2024
Signed off — New Building
INSTALLATION OF A TEMPORARY WOODEN CONSTRUCTION FENCE
X00741218-S6
12/26/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
08/05/2024
Filed — New Building
INSTALLATION OF A TEMPORARY WOODEN CONSTRUCTION FENCE
X00741218-P9
07/11/2024
Filed — New Building
INSTALLATION OF A TEMPORARY WOODEN CONSTRUCTION FENCE
X00741218-P8
03/18/2024
Objection resolved — Addressed
03/15/2024
Objection raised — Other
03/13/2024
Filed — New Building
INSTALLATION OF A TEMPORARY WOODEN CONSTRUCTION FENCE
X00741218-P7
03/12/2024
Special inspection requirement — Protection of exposed foundation insulation
FAHAD FATEH
03/12/2024
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
03/12/2024
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
03/12/2024
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
03/12/2024
Special inspection requirement — Lighting controls
FAHAD FATEH
03/12/2024
Special inspection requirement — Metering
FAHAD FATEH
03/12/2024
Special inspection requirement — Exterior lighting power
FAHAD FATEH
03/12/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
03/12/2024
Special inspection requirement — Maintenance information
FAHAD FATEH
03/12/2024
Special inspection requirement — Interior lighting power
FAHAD FATEH
03/12/2024
Special inspection requirement — Air barrier — testing
FAHAD FATEH
03/12/2024
Special inspection requirement — Fenestration areas
FAHAD FATEH
03/12/2024
Special inspection requirement — Electrical motors and elevators
FAHAD FATEH
03/12/2024
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
03/12/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
03/12/2024
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
03/12/2024
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
01/03/2024
Signed off — New Building
INSTALLATION OF A TEMPORARY WOODEN CONSTRUCTION FENCE
X00741218-S1
12/28/2023
Signed off — Alteration
X00741221-I1
12/26/2023
Inspection — Pass-Final PL Permit Withdrawal
Pass
View inspection ↗
12/19/2023
Inspection — Fail-Final PL Permit Withdrawal
Fail
View inspection ↗
11/23/2023
Signed off — New Building
INSTALLATION OF A TEMPORARY WOODEN CONSTRUCTION FENCE
X00741218-S3
11/09/2023
Signed off — New Building
INSTALLATION OF A TEMPORARY WOODEN CONSTRUCTION FENCE
X00741218-S4
11/06/2023
Filed — New Building
INSTALLATION OF A TEMPORARY WOODEN CONSTRUCTION FENCE
X00741218-P4
11/01/2023
Special inspection requirement — Air barrier — testing
FAHAD FATEH
11/01/2023
Special inspection requirement — Protection of exposed foundation insulation
FAHAD FATEH
11/01/2023
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
11/01/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
11/01/2023
Special inspection requirement — Exterior lighting power
FAHAD FATEH
11/01/2023
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
11/01/2023
Special inspection requirement — Maintenance information
FAHAD FATEH
11/01/2023
Special inspection requirement — Metering
FAHAD FATEH
11/01/2023
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
11/01/2023
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
11/01/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
11/01/2023
Special inspection requirement — Lighting controls
FAHAD FATEH
11/01/2023
Special inspection requirement — Electrical motors and elevators
FAHAD FATEH
10/27/2023
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
10/27/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/27/2023
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
10/27/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/25/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/23/2023
Signed off — New Building
INSTALLATION OF A TEMPORARY WOODEN CONSTRUCTION FENCE
X00741218-S5
10/19/2023
Permit issued — Curb Cut
X00741218-S6-CC
10/18/2023
Signed off — Alteration
8' Construction Fence
X00791481-I1
10/18/2023
Signed off — New Building
INSTALLATION OF A TEMPORARY WOODEN CONSTRUCTION FENCE
X00741218-S2
Latest 60 of 155 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offINNOVATIVE CONSTR NYC LLC10/19/2023
DOB NOWMechanical SystemsSigned-offINNOVATIVE CONSTR NYC LLC06/26/2023
DOB NOWConstruction FenceSigned-offINNOVATIVE CONSTR NYC LLC06/26/2023
DOB NOWGeneral ConstructionPermit IssuedINNOVATIVE CONSTR NYC LLC05/11/2023
DOB NOWStructuralSigned-offINNOVATIVE CONSTR NYC LLC05/11/2023
DOB NOWSidewalk ShedSigned-offMANHATTAN D ENTERPRISES04/18/2023
DOB NOWSupported ScaffoldSigned-offMANHATTAN D ENTERPRISES04/18/2023
DOB NOWPlumbingSigned-offA M B MECHANICAL INC03/16/2023
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN03/16/2023
DOB NOWSupport of ExcavationSigned-offINNOVATIVE CONSTR NYC LLC02/24/2023
DOB NOWGeneral ConstructionPermit IssuedINNOVATIVE CONSTR NYC LLC01/20/2023
DOB NOWStructuralSigned-offINNOVATIVE CONSTR NYC LLC01/19/2023
DOB NOWConstruction FenceSigned-offINNOVATIVE CONSTR NYC LLC10/26/2022
DOB NOWEarth WorkSigned-offSTELLAR INDUSTRIES INC05/31/2022
DOB NOWPlumbingPermit IssuedGO GREENER PLUMBING LLC01/24/2022
1 project · most recent 08/05/2024
Air Conditioning Systems Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/05/2024Signed-offINNOVATIVE CONSTR NYC LLCAir Conditioning Systems, Heating and Air Conditioning Systems
Cooling
Amana PTC093G00 9,000 BTU · Ptac ×1
Heat / Cool
Amana PTH073G25 7,600 BTU · Ptac ×70
PTH123G25 12,000 BTU · Ptac ×39
PTH153G35 14,700 BTU · Ptac ×14
PTH093G35 9,000 BTU · Ptac ×12
1 project · most recent 08/05/2024
Sprinkler System
FiledStatusContractorScope
08/05/2024Signed-offPRIME PIPING & HEATING INSprinkler System
2 projects · most recent 08/05/2024
Gas Water/Sanitary Storm
FiledStatusContractorScope
08/05/2024Signed-offPRIME PIPING & HEATING INGas, Storm, Water/Sanitary
03/17/2021Permit IssuedGO GREENER PLUMBING LLCGas, Water/Sanitary
8 projects · most recent 08/23/2024
General Wiring
FiledStatusContractorScope
08/23/2024CompleteS&R ELECTRICAL & MECHANICGeneral Wiring
07/24/2023CompleteSTAR ELEC'L CONTRACTORS C—
06/28/2023CompleteS&R ELECTRICAL & MECHANICGeneral Wiring
06/28/2023CompleteS&R ELECTRICAL & MECHANIC—
03/03/2023CompleteSOLAS ELECTRICAL CORP—
11/24/2021CompleteBLZ ELECTRIC INC.General Wiring
05/14/2021CancelledILLUMINATIONS UNLMTD ELECGeneral Wiring
05/08/2021CompleteILLUMINATIONS UNLMTD ELEC3 meters, 3 new_meters
1 project · most recent 08/05/2024
FiledStatusContractorScope
08/05/2024Signed-offINNOVATIVE CONSTR NYC LLC1 scope_items
1 project · most recent 08/05/2024
Fence
FiledStatusContractorScope
08/05/2024Signed-offINNOVATIVE CONSTR NYC LLCFence
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
12/26/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
12/26/2023Pass-Final PL Permit WithdrawalPassView ↗
12/19/2023Fail-Final PL Permit WithdrawalFailView ↗
10/27/2023Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
10/27/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/27/2023Fail-Final Curb Cut Non-Directive 14FailView ↗
10/27/2023Pass-Final CND-Occupancy InspectionPassView ↗
10/25/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/22/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/31/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
07/25/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
05/22/2023Pass-Final PL - UndergroundPassView ↗
03/20/2023Pass-Final PL - UndergroundPassView ↗
09/26/2022Pass-Final Curb Cut WithdrawalPassView ↗
▾Special Inspection Requirements (DOB NOW) — 81
DateRequirementInspectorRole
03/12/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
03/12/2024Lighting controlsFAHAD FATEHenergy_progress
03/12/2024Maintenance informationFAHAD FATEHenergy_progress
03/12/2024Insulation placement and R valuesFAHAD FATEHenergy_progress
03/12/2024Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
03/12/2024Air barrier - visual inspectionFAHAD FATEHenergy_progress
03/12/2024Protection of exposed foundation insulationFAHAD FATEHenergy_progress
03/12/2024Electrical motors and elevatorsFAHAD FATEHenergy_progress
03/12/2024Fenestration areasFAHAD FATEHenergy_progress
03/12/2024Fenestration air leakageFAHAD FATEHenergy_progress
03/12/2024Interior lighting powerFAHAD FATEHenergy_progress
03/12/2024Air barrier — testing FAHAD FATEHenergy_progress
03/12/2024Exterior lighting powerFAHAD FATEHenergy_progress
03/12/2024Lighting in dwelling unitsFAHAD FATEHenergy_progress
03/12/2024MeteringFAHAD FATEHenergy_progress
03/12/2024Fire-Resistance Rated ConstructionFAHAD FATEHprogress
03/12/2024Energy Code Compliance InspectionsFAHAD FATEHprogress
11/01/2023Fenestration areasFAHAD FATEHenergy_progress
11/01/2023Fenestration air leakageFAHAD FATEHenergy_progress
11/01/2023Electrical motors and elevatorsFAHAD FATEHenergy_progress
11/01/2023Lighting controlsFAHAD FATEHenergy_progress
11/01/2023Lighting in dwelling unitsFAHAD FATEHenergy_progress
11/01/2023Maintenance informationFAHAD FATEHenergy_progress
11/01/2023Exterior lighting powerFAHAD FATEHenergy_progress
11/01/2023Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
Latest 25 of 81.
▾Documents — 119 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch17
08/24/2026X00741221-I1Request digital key ↗
08/23/2026X00849599-I1Request digital key ↗
08/23/2026X00741218-P9Request digital key ↗
Showing 3 of 17 on file for this type
▸DOB NOWPlans/Sketch - Plumbing Legalization1
08/25/2026X00476206-I1Request digital key ↗
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION2
07/16/2024240342394Open ↗
09/13/2023240342394Open ↗
▸DOB NOWHPD - Permit Notice2
08/15/2026X00741218-I1Open ↗
08/13/2026X00741221-I1Open ↗
▸Zoning, Tax Lot & Property Records11
▸DOB NOWZD1: DOB Zoning Diagram5
08/23/2026X00741218-P4Open ↗
08/23/2026X00741218-P1Open ↗
08/15/2026X00741218-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZoning Exhibit form (1-5)5
08/23/2026X00741218-P4Open ↗
08/23/2026X00741218-P1Open ↗
08/15/2026X00741218-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/15/2026X00741218-I1Open ↗
▸Seals & Professional Certifications39
▸DOB NOWDPL-1: Design Professional Seal & Signature18
08/25/2026X00476206-I1Open ↗
08/24/2026X00741221-I1Open ↗
08/24/2026X00791481-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
09/01/2026X00741218-P7Open ↗
09/01/2026X00741218-P7Open ↗
08/28/2026X00741218-P2Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/29/2026X00476206-I1Open ↗
09/01/2026X00741218-P7Open ↗
08/28/2026X00741218-P2Open ↗
Showing 3 of 10 on file for this type
▸Trade Schedules & Equipment6
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)6
08/23/2026X00741218-P1Open ↗
08/23/2026X00741218-P4Open ↗
08/23/2026X00741218-S1Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection12
▸DOB NOWStreet Tree Checklist6
08/23/2026X00741218-P4Open ↗
08/23/2026X00741218-P1Open ↗
08/23/2026X00741218-S1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan2
08/23/2026X00741218-S1Open ↗
08/15/2026X00741218-I1Open ↗
▸DOB NOWStreet Tree Sign Off2
08/23/2026X00741218-S1Open ↗
08/15/2026X00741218-I1Open ↗
▸BISSTREET TREE CHECKLIST1
09/19/2023240342394Open ↗
▸DOB NOWStreet Trees Site Plan1
08/15/2026X00741218-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/25/2026X00476206-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/15/2026X00741218-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWTR4 Test Report and Plot Diagram2
08/23/2026X00741218-S1Open ↗
08/14/2026X00741218-S5Open ↗
▸DOB NOWSOIL REPORT2
08/23/2026X00741218-S1Open ↗
08/14/2026X00741218-S5Open ↗
▸Approvals, Objections & Sign-offs1
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
11/09/2023240342394Open ↗
▸Other Documents22
▸DOB NOWSite Survey: Initial6
08/23/2026X00741218-S1Open ↗
08/23/2026X00741218-P4Open ↗
08/23/2026X00741218-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone6
08/23/2026X00741218-P1Open ↗
08/23/2026X00741218-S1Open ↗
08/23/2026X00741218-P4Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProperty Ownership Certification5
08/23/2026X00741218-P4Open ↗
08/23/2026X00741218-P1Open ↗
08/15/2026X00741218-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWAdjoining Owners Notification3
08/23/2026X00741218-S1Open ↗
08/14/2026X00741218-S5Open ↗
08/13/2026X00741221-I1Open ↗
▸DOB NOWHPD - Completion Notice1
08/15/2026X00741218-I1Open ↗
▸DOB NOWFinal Survey1
08/15/2026X00741218-I1Open ↗