ECB03/06/2008WORK W/O A PERMIT WORK NOTED CONCRETE RAMP BUILT FROM ST TO YARD AT BOLTON AVE ENTRANCE CREATING A DRIVEWAY REMEDY: OBTAIN PERMIT IF FEASIBLE OR RESTORE TO PRIOR LEGAL CONDITIONNothing owed — awaiting certificate of correction
Two stories - detached, small or mid-size · 5,063 sf lot · 0.76 FAR built · Flood zone X500
Locations of Work
No floor-level scope or drawing coverage on file for this building.