Hospital, sanitarium, mental institution
St. John's Episcopal Hospital
19-04 PLAINVIEW AVENUE · BIN 4430537
💬 Discuss this project
1982Year Built
10Stories
I1Building Class
R5Zoning
119,788 sfGross Floor Area
1Units
LL97 Covered48 Open Violations 42 unresolved · 6 paperwork only ▸FISP: UNSAFEFDNY Report ↗
Hospital, sanitarium, mental institution · Owner of record: CHURCH CHARITY FOUNDATION OF LI · 170,000 sf lot · 0.7 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionLandscapeGeneral
Permit Issued — active, not yet Signed-off
Roof38p · 14 filings · 20 docs
Floor 11Under Construction14p · 5 filings · 20 docs
Floor 10Under Construction15p · 5 filings · 20 docs
Floor 9Under Construction17p · 6 filings · 20 docs
Floor 8Under Construction14p · 5 filings · 20 docs
Floor 7Under Construction52p · 6 filings · 20 docs
Floor 6Under Construction52p · 6 filings · 20 docs
Floor 5Under Construction55p · 6 filings · 20 docs
Floor 4Under Construction55p · 7 filings · 20 docs
Floor 3Under Construction49p · 6 filings · 20 docs
Floor 2Under Construction51p · 5 filings · 20 docs
Floor 1Under Construction40p · 5 filings · 20 docs
Sub-BasementUnder Construction68p · 6 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ALPHA GROUP NY1209/13/2026
ST JOHN'S ESPOSCOPAL HOSPITAL36409/02/2026
GSR CONTRACTOR1008/30/2026
PRD GROUP907/08/2026
AMS CONTRACTOR607/08/2026
EPISCOPAL HEALTH SERVICES/3207/08/2026
OWNERS REP303/22/2026
CHURCH CHARITY FOUNDATION OF LI3703/22/2026
CON CONTRACTING LLC103/22/2026
CHUCH CHARITY FOUNDATION103/22/2026
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
THE SHANNON GROUP INCGeneral Contractor1907/08/2026
EMCOR SERVICES NY/NJ INCGeneral Contractor1107/08/2026
MGR RESTRO INCGeneral Contractor1008/22/2026
GSR CONTRACTOR INCGeneral Contractor808/30/2026
ICON CONTRACTING LLCGeneral Contractor704/09/2026
TOM FITZPATRICK ELECTRICAElectrical703/22/2026
PRD GROUP INCGeneral Contractor507/08/2026
DUAL FUEL PLUBING & HTINGPlumbing507/08/2026
AMS CONTRACTOR INCGeneral Contractor407/08/2026
EAST ENDERS NYC INCGeneral Contractor303/21/2026
DELL MECHANICAL CORPPlumbing207/08/2026
P.S.I. MECHANICALPlumbing107/08/2026
LEONID ARLYUKElectrical103/21/2026
MARINO, DOMENICKElectrical103/21/2026
TRIPLE I ELEC'L CONTR'G IElectrical103/22/2026
WTG ELECTRIC INC.Electrical103/22/2026
ALLSTATE SPRINKLER LLCFire Protection107/08/2026
UPRIGHT FIRE PROTCTN LLCFire Protection107/08/2026
ALPHA GROUP NY1 CORPGeneral Contractor106/28/2026
BELFOR LONG ISLAND LLCGeneral Contractor107/08/2026
SIGNATURE CONSTRUCTION GROUPGeneral Contractor107/08/2026
GOODLUCK, RAYMONDElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
VALERIO ASSOCIATES, P.C.13791508/27/2026
NICHOLAS C PAPPAS ARCHITE55521508/27/2026
FUTURE TECH CONSULTANTS O5892502/02/2026
COMPLY BUILDING GROUP86221008/07/2025
JANHA BUILDING IDEAS INC6129106/20/2024
SOCOTEC ENGINEERING4983703/21/2024
CL ENGINEERING P.C.6781111/03/2021
NUENERGEN1717112/18/2020
Building Lifecycle
All (300)Filed (71)Permit Issued (63)Signed Off (17)Facade (FISP) (11)Violation (48)Inspection (22)Objection (38)Special Inspection (30)
08/28/2026
Permit issued — Sidewalk Shed
Q00764628-I1-SH
08/27/2026
Filed — Alteration
Repurpose portion of pipe shaft into electric closets. Floors 2,3 and 5 through 11. Add electric closet in room on 4th floor as shown on plans. there is no change in use, occupancy or means of egress.
Q08031627-P2
08/21/2026
Permit issued — General Construction
Q00451561-I1-GC
08/21/2026
Permit issued — General Construction
Q01270163-I1-GC
07/13/2026
Violation issued (ECB, open)
Construction
07/07/2026
Cycle 10 facade report submitted
06/25/2026
Cycle 10 facade inspection completed
06/01/2026
Special inspection requirement — Structural Steel - Details
JOHN VALERIO
06/01/2026
Special inspection requirement — Fire-Resistance Rated Construction
Nicholas Pappas
06/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nicholas Pappas
06/01/2026
Special inspection requirement — Final
Nicholas Pappas
05/28/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
JOHN VALERIO
05/28/2026
Special inspection requirement — Air barrier - visual inspection
Nicholas Pappas
05/28/2026
Special inspection requirement — Masonry
Nicholas Pappas
05/28/2026
Special inspection requirement — Final
Nicholas Pappas
05/13/2026
Permit issued — Sidewalk Shed
Q00764628-I1-SH
05/08/2026
Filed — Alteration
Q01393200-I1
05/08/2026
Permit issued — Supported Scaffold
Q01393200-I1-SF
04/17/2026
Signed off — Alteration
Q01003674-I1
03/30/2026
Cycle 10 facade report submitted
03/30/2026
Cycle 10 facade report signed — UNSAFE
03/26/2026
Permit issued — General Construction
Q00451561-I1-GC
03/26/2026
Cycle 10 facade inspection completed
03/25/2026
Permit issued — Structural
Q08031627-I1-GC-CX
02/23/2026
Special inspection requirement — Fire-Resistance Rated Construction
Nicholas Pappas
02/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nicholas Pappas
02/23/2026
Special inspection requirement — Structural Steel - Details
JOHN VALERIO
02/23/2026
Special inspection requirement — Final
Nicholas Pappas
02/22/2026
Cycle 8 facade report signed — SWARMP
02/16/2026
Special inspection requirement — Final
Nicholas Pappas
02/16/2026
Special inspection requirement — Air barrier - visual inspection
Nicholas Pappas
02/16/2026
Special inspection requirement — Masonry
Nicholas Pappas
02/16/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
JOHN VALERIO
02/16/2026
Special inspection requirement — Energy Code Compliance
Nicholas Pappas
02/12/2026
Permit issued — Sidewalk Shed
Q00764628-I1-SH
02/02/2026
Filed — Alteration
APPLICATION FILED TO INSTALL (1) ONE ADDITIONAL STEAM BOILER IN CONJUNCTION WITH Q00975247-S1 STEAM-TO-HOT WATER CONVERSION.
Q00975247-A2
02/02/2026
Filed — Alteration
APPLICATION FILED TO INSTALL (1) ONE ADDITIONAL STEAM BOILER IN CONJUNCTION WITH Q00975247-S1 STEAM-TO-HOT WATER CONVERSION.
Q00975247-A3
02/02/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
MARISA HARTE
02/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MARISA HARTE
02/02/2026
Special inspection requirement — HVAC-R and service water heating equipment
MARISA HARTE
02/02/2026
Special inspection requirement — Heating Systems
MARISA HARTE
02/02/2026
Special inspection requirement — Maintenance information
MARISA HARTE
02/02/2026
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
MARISA HARTE
02/02/2026
Special inspection requirement — HVAC-R and service water heating equipment
MARISA HARTE
02/02/2026
Special inspection requirement — Maintenance information
MARISA HARTE
02/02/2026
Special inspection requirement — HVAC-R and service water heating system controls
MARISA HARTE
02/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MARISA HARTE
02/02/2026
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
MARISA HARTE
02/02/2026
Special inspection requirement — Heating Systems
MARISA HARTE
02/02/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
MARISA HARTE
01/28/2026
Filed — Alteration
Repurpose portion of pipe shaft into electric closets. Floors 2,3 and 5 through 11. Add electric closet in room on 4th floor as shown on plans. there is no change in use, occupancy or means of egress.
Q08031627-P1
01/09/2026
Filed — Alteration
MECHANICAL APPLICATION FILED FOR AIR HANDLING UNIT REPLACEMENTS.
Q01006824-P3
01/09/2026
Cycle 10 facade report submitted
01/09/2026
Cycle 10 facade report signed — UNSAFE
01/08/2026
Filed — Alteration
THIS APPLICATION IS FILED TO DO FACADE REPAIR WORK FOR THE LOCAL LAW 11 AND ALSO TO DISMISS THE VIOLATIONS RELATED TO THIS.
Q00451561-P5
01/07/2026
Filed — Alteration
MECHANICAL APPLICATION FILED FOR UPGRADING CHILLED WATER SYSTEM AS PER PLAN. RELATED GC AND PL WORK FILED SEPARATELY.
Q00976620-P6
01/07/2026
Filed — Alteration
MECHANICAL APPLICATION FILED FOR UPGRADING CHILLED WATER SYSTEM AS PER PLAN. RELATED GC AND PL WORK FILED SEPARATELY.
Q00976620-P7
01/07/2026
Filed — Alteration
APPLICATION FILED TO INSTALL (1) ONE ADDITIONAL STEAM BOILER IN CONJUNCTION WITH Q00975247-S1 STEAM-TO-HOT WATER CONVERSION.
Q00975247-A1
01/07/2026
Filed — Alteration
Q00976659-P9
01/07/2026
Filed — Alteration
Q00976659-P8
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedGSR CONTRACTOR INC08/28/2026
DOB NOWGeneral ConstructionSigned-offMGR RESTRO INC08/21/2026
DOB NOWGeneral ConstructionSigned-offMGR RESTRO INC08/21/2026
DOB NOWSidewalk ShedPermit IssuedGSR CONTRACTOR INC05/13/2026
DOB NOWSupported ScaffoldPermit IssuedALPHA GROUP NY1 CORP05/08/2026
DOB NOWGeneral ConstructionSigned-offMGR RESTRO INC03/26/2026
DOB NOWStructuralPermit IssuedICON CONTRACTING LLC03/25/2026
DOB NOWSidewalk ShedPermit IssuedGSR CONTRACTOR INC02/12/2026
DOB NOWBoiler EquipmentPermit IssuedDUAL FUEL PLUBING & HTING11/13/2025
DOB NOWBoiler EquipmentPermit IssuedDUAL FUEL PLUBING & HTING11/13/2025
DOB NOWSuspended ScaffoldPermit IssuedM.G.R. RESTORATION INC10/27/2025
DOB NOWGeneral ConstructionSigned-offMGR RESTRO INC10/27/2025
DOB NOWGeneral ConstructionSigned-offMGR RESTRO INC07/29/2025
DOB NOWMechanical SystemsPermit IssuedEMCOR SERVICES NY/NJ INC07/08/2025
DOB NOWStructuralPermit IssuedICON CONTRACTING LLC04/23/2025
DOB NOWGeneral ConstructionSigned-offTHE SHANNON GROUP INC04/21/2025
DOB NOWMechanical SystemsSigned-offTHE SHANNON GROUP INC04/21/2025
DOB NOWGeneral ConstructionSigned-offMGR RESTRO INC03/31/2025
DOB NOWMechanical SystemsSigned-offTHE SHANNON GROUP INC03/06/2025
DOB NOWGeneral ConstructionSigned-offTHE SHANNON GROUP INC03/06/2025
DOB NOWMechanical SystemsSigned-offTHE SHANNON GROUP INC03/06/2025
DOB NOWMechanical SystemsPermit IssuedEMCOR SERVICES NY/NJ INC02/12/2025
DOB NOWMechanical SystemsPermit IssuedEMCOR SERVICES NY/NJ INC01/22/2025
DOB NOWGeneral ConstructionPermit IssuedEMCOR SERVICES NY/NJ INC01/22/2025
DOB NOWGeneral ConstructionPermit IssuedEMCOR SERVICES NY/NJ INC01/22/2025
DOB NOWGeneral ConstructionSigned-offEMCOR SERVICES NY/NJ INC01/22/2025
DOB NOWGeneral ConstructionPermit IssuedEMCOR SERVICES NY/NJ INC01/22/2025
DOB NOWMechanical SystemsPermit IssuedEMCOR SERVICES NY/NJ INC01/22/2025
DOB NOWSuspended ScaffoldPermit IssuedM.G.R. RESTORATION INC01/13/2025
DOB NOWGeneral ConstructionPermit IssuedICON CONTRACTING LLC12/12/2024
DOB NOWSprinklersSigned-offH.J. FLOOD INC.10/22/2024
DOB NOWPlumbingSigned-offDELL MECHANICAL CORP10/21/2024
DOB NOWEarth WorkSigned-offSIGNATURE CONSTRUCTION GR10/21/2024
DOB NOWMechanical SystemsSigned-offTHE SHANNON GROUP INC07/15/2024
DOB NOWSuspended ScaffoldPermit IssuedM.G.R. RESTORATION INC07/01/2024
DOB NOWGeneral ConstructionSigned-offTHE SHANNON GROUP INC06/07/2024
DOB NOWSidewalk ShedPermit IssuedGSR CONTRACTOR INC06/06/2024
DOB NOWSuspended ScaffoldPermit IssuedM.G.R. RESTORATION INC06/05/2024
DOB NOWGeneral ConstructionSigned-offTHE SHANNON GROUP INC05/07/2024
DOB NOWPlumbingSigned-offDUAL FUEL PLUBING & HTING04/22/2024
+ 60 more permits on file
2 projects · most recent 01/07/2026
Air Conditioning Systems Cooling Towers
FiledStatusContractorScopeMake / Model / Capacity
01/07/2026Permit IssuedEMCOR SERVICES NY/NJ INCAir Conditioning Systems
Cooling
Broad Usa BZ100-d BZ76XIID-D-36.4/29.4-6.7/13.7-d-Fa-Ma-B3-100 250 tons · Chiller ×2
08/07/2025Permit IssuedEMCOR SERVICES NY/NJ INCCooling Towers
Cooling Tower
Marley NC8403PAN4SGF2025 1,913 tons · Cooling Tower ×8
3 projects · most recent 02/02/2026
Gas Medical Gas
FiledStatusContractorScope
02/02/2026Permit IssuedDUAL FUEL PLUBING & HTINGGas
01/07/2026Signed-offDUAL FUEL PLUBING & HTINGGas
06/21/2021——Medical Gas
25 projects · most recent 04/27/2026
General Wiring HVAC Wiring
FiledStatusContractorScope
04/27/2026Permit IssuedTOM FITZPATRICK ELECTRICAGeneral Wiring
12/20/2025Permit IssuedWTG ELECTRIC INC.General Wiring
12/20/2025Permit IssuedWTG ELECTRIC INC.General Wiring
08/19/2025Permit IssuedTOM FITZPATRICK ELECTRICAGeneral Wiring
08/18/2025Permit IssuedTOM FITZPATRICK ELECTRICAGeneral Wiring
07/18/2025Permit IssuedTOM FITZPATRICK ELECTRICAGeneral Wiring
03/01/2025Permit IssuedWTG ELECTRIC INC.General Wiring
10/31/2024Permit IssuedTOM FITZPATRICK ELECTRICAGeneral Wiring
10/02/2024Permit IssuedRAIKOS ELECTRIC LLCGeneral Wiring
05/21/2024Permit IssuedTOM FITZPATRICK ELECTRICAGeneral Wiring
04/21/2024Permit IssuedDELUXE ELECL & MAINT CORPGeneral Wiring
03/29/2024Permit IssuedWTG ELECTRIC INC.General Wiring
11/27/2023CompleteTRIPLE I ELEC'L CONTR'G IGeneral Wiring
06/14/2023Permit IssuedTOM FITZPATRICK ELECTRICAGeneral Wiring
03/20/2023Permit IssuedTOM FITZPATRICK ELECTRICAGeneral Wiring
4 projects · most recent 08/27/2026
Steel Masonry
FiledStatusContractorScope
08/27/2026Permit IssuedICON CONTRACTING LLC1 scope_items
01/09/2026Permit IssuedEMCOR SERVICES NY/NJ INCSteel
12/13/2023——Steel, Masonry
10/24/2023——Masonry
1 project · most recent 07/01/2022
Sidewalk Shed
FiledStatusContractorScope
07/01/2022Permit IssuedGSR CONTRACTOR INCSidewalk Shed
1 project · most recent 06/20/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
06/20/2024Permit IssuedM.G.R. RESTORATION INCSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 22
DateTypeResultReport
06/03/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/30/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/30/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/28/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/30/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/30/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
10/25/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/25/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/19/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/05/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/09/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/27/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/21/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/31/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/26/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/23/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/23/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/15/2024Certified Medical Gas - MG - PL - FinishCertifiedView ↗
04/15/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/09/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/24/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
10/24/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
06/01/2026FinalNicholas Pappasprogress
06/01/2026Fire-Resistance Rated ConstructionNicholas Pappasprogress
06/01/2026Fire-Resistant Penetrations and JointsNicholas Pappasspecial
06/01/2026Structural Steel - DetailsJOHN VALERIOspecial
05/28/2026MasonryNicholas Pappasspecial
05/28/2026Structural Stability – Alterations of existing buildingsJOHN VALERIOspecial
05/28/2026FinalNicholas Pappasprogress
05/28/2026Air barrier - visual inspectionNicholas Pappasenergy_progress
02/23/2026Fire-Resistance Rated ConstructionNicholas Pappasprogress
02/23/2026Structural Steel - DetailsJOHN VALERIOspecial
02/23/2026Fire-Resistant Penetrations and JointsNicholas Pappasspecial
02/23/2026FinalNicholas Pappasprogress
02/16/2026Energy Code ComplianceNicholas Pappasprogress
02/16/2026FinalNicholas Pappasprogress
02/16/2026Air barrier - visual inspectionNicholas Pappasenergy_progress
02/16/2026MasonryNicholas Pappasspecial
02/16/2026Structural Stability – Alterations of existing buildingsJOHN VALERIOspecial
02/02/2026HVAC-R and service water heating equipmentMARISA HARTEenergy_progress
02/02/2026Heating SystemsMARISA HARTEspecial
02/02/2026Fuel-Oil Storage and Fuel-Oil Piping SystemsMARISA HARTEspecial
02/02/2026Fire-Resistant Penetrations and JointsMARISA HARTEspecial
02/02/2026HVAC-R and service water piping design and insulationMARISA HARTEenergy_progress
02/02/2026HVAC-R and service water heating equipmentMARISA HARTEenergy_progress
02/02/2026Maintenance informationMARISA HARTEenergy_progress
02/02/2026HVAC-R and service water heating system controlsMARISA HARTEenergy_progress
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
ST. John's Episcopal HospitalMedical / HealthcareSub-basement, Basement, Floors 1–11
Project Q01029189 Alteration · LOC Issued · 06/24/2024
Project Q01029198 Alteration · LOC Issued · 06/10/2024
Project Q01029175 Alteration · LOC Issued · 05/28/2024
Project Q00976782 Alteration · Permit Entire · 05/06/2024
Project Q01033432 Alteration · Approved · 04/18/2024
Project Q00975247 Alteration · Permit Entire · 03/21/2024
Project Q01006824 Alteration · Permit Entire · 03/11/2024
Project Q00976659 Alteration · Permit Entire · 02/20/2024
Project Q00976809 Alteration · Approved · 02/09/2024
Project Q00976620 Alteration · Permit Entire · 01/29/2024
Project Q00932169 Alteration · LOC Issued · 10/06/2023
Project Q00941344 Alteration · LOC Issued · 10/06/2023
St. John's HospitalMedical / HealthcareRoof
Project Q00998216 Alteration · LOC Issued · 04/02/2024
Sje HospitalMedical / Healthcare—
Project Q00966196 Alteration · Approved · 12/13/2023
ST. John's Episcopai Hospital South ShoreMedical / HealthcareFloors 10, 11
Project Q00852005 Alteration · LOC Issued · 07/18/2023
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 1,012 on file (BIS + DOB NOW)
▸Plans & Drawings78
▸DOB NOWPlans/Sketch66
08/27/2026Q00605778-I1Request digital key ↗
08/26/2026Q00660414-I1Request digital key ↗
08/26/2026Q00672549-I1Request digital key ↗
Showing 3 of 66 on file for this type
▸DOB NOWPlans/Sketch - General Construction8
08/27/2026Q00471352-P5Request digital key ↗
08/27/2026Q00471352-P1Request digital key ↗
08/27/2026Q00471352-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed3
08/28/2026Q00221066-I1Request digital key ↗
08/27/2026Q00435338-I1Request digital key ↗
Showing 2 of 3 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment1
08/27/2026Q00395349-I1Request digital key ↗
▸Applications & Permits148
▸BISPLAN / WORK APPROVAL APPLICATION88
11/24/2025420963390Open ↗
11/10/2025420963390Open ↗
11/05/2025420963390Open ↗
Showing 3 of 88 on file for this type
▸BISWORK PERMIT APPLICATION60
12/28/2021440658049Open ↗
05/06/2020440591183Open ↗
02/28/2020420963407Open ↗
Showing 3 of 60 on file for this type
▸Seals & Professional Certifications322
▸DOB NOWDPL-1: Design Professional Seal & Signature77
08/27/2026Q00435338-I1Open ↗
08/27/2026Q00395349-I1Open ↗
08/27/2026Q00471352-P5Open ↗
Showing 3 of 77 on file for this type
▸DOB NOWProgress Inspector Seal & Signature75
09/29/2026Q00471352-P1Open ↗
09/27/2026Q00852005-I1Open ↗
09/27/2026Q00852005-I1Open ↗
Showing 3 of 75 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION69
04/30/2020421892161Open ↗
04/29/2020421892170Open ↗
04/29/2020421892170Open ↗
Showing 3 of 69 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature59
09/29/2026Q00471352-P1Open ↗
09/29/2026Q00471352-P1Open ↗
09/27/2026Q00852005-I1Open ↗
Showing 3 of 59 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST16
02/19/2021440658049Open ↗
02/26/2020421892161Open ↗
02/19/2019421892170Open ↗
Showing 3 of 16 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM11
09/10/2014421022253Open ↗
Showing 1 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT7
12/22/2020440658049Open ↗
04/03/2020440591183Open ↗
02/19/2019421892170Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
12/24/2020440658067Open ↗
12/22/2020440658049Open ↗
04/03/2020440591183Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
12/22/2020440658049Open ↗
04/03/2020440591183Open ↗
05/01/2015440216678Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
12/24/2020440658067Open ↗
▸Trade Schedules & Equipment56
▸BISSELF-CERT PLUMBING NOTICE19
08/07/2015440216678Open ↗
07/22/2015440216678Open ↗
03/25/2015420963407Open ↗
Showing 3 of 19 on file for this type
▸BISSCHEDULE B - PLUMBING11
05/01/2015440216678Open ↗
Showing 1 of 11 on file for this type
▸BISEQUIPMENT USE PERMITS7
04/30/2020421892161Open ↗
Showing 1 of 7 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
02/19/2019421892170Open ↗
02/19/2019421892161Open ↗
10/10/2017420963407Open ↗
Showing 3 of 5 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT5
05/14/2020421892161Open ↗
05/06/2020421892161Open ↗
04/29/2020421892161Open ↗
Showing 3 of 5 on file for this type
▸BISSPRINKLER INSP REPORT : FP-854
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Safety & Tenant Protection4
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWTenant Protection Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos87
▸DOB NOWDEP ACP-5: Asbestos Assessment Report49
08/27/2026Q00605778-I1Open ↗
08/26/2026Q00691194-I1Open ↗
08/26/2026Q00690942-I1Open ↗
Showing 3 of 49 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)8
10/01/2015421205289Open ↗
10/01/2015421205289Open ↗
07/16/2014421002836Open ↗
Showing 3 of 8 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM3
06/20/2019421690361Open ↗
02/19/2019421892170Open ↗
02/19/2019421892161Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
09/10/2014421022253Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/27/2026Q00471352-I1Open ↗
▸Energy Compliance39
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS16
04/30/2020421892161Open ↗
04/29/2020421892170Open ↗
04/27/2020421690361Open ↗
Showing 3 of 16 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS6
05/06/2020421690361Open ↗
05/06/2020421892161Open ↗
04/29/2020421892161Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
12/24/2020440658067Open ↗
12/22/2020440658049Open ↗
05/06/2020421690361Open ↗
Showing 3 of 5 on file for this type
▸BISTR8: Energy Code Progress Inspections3
09/10/2014421022253Open ↗
Showing 1 of 3 on file for this type
▸BISTECHNICAL REPORT: ENERGY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
12/22/2020440658049Open ↗
04/03/2020440591183Open ↗
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports12
▸BISTECHNICAL REPORT: RESPONSIBILITY11
12/24/2020440658067Open ↗
12/22/2020440658049Open ↗
05/06/2020421690361Open ↗
Showing 3 of 11 on file for this type
▸BISMANUFACTURE STATEMENT: QUALITY OF MASONRY UNITS-REQUIRED PRIOR TO CONSTRUCTION OF MASONRY (B FORM 10H)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs133
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter72
08/27/2026Q00471352-P5Open ↗
08/27/2026Q00471352-I1Open ↗
08/27/2026Q00471352-P1Open ↗
Showing 3 of 72 on file for this type
▸BISADMINISTRATIVE OBJECTIONS32
09/10/2014421022253Open ↗
07/16/2014421002836Open ↗
07/14/2014421002818Open ↗
Showing 3 of 32 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST16
05/14/2020421892161Open ↗
05/06/2020421690361Open ↗
04/29/2020421892161Open ↗
Showing 3 of 16 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISSUPERSEDING LETTER3
02/28/2020420963407Open ↗
02/18/2020420963407Open ↗
08/01/2017421205289Open ↗
▸BISFINAL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSHED LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership54
▸BISCOST AFFIDAVIT48
12/24/2020440658067Open ↗
12/22/2020440658049Open ↗
05/14/2020421892161Open ↗
Showing 3 of 48 on file for this type
▸BISLL58/88-CIVIL PENALTY AFFIDAVIT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSTEEL AFFIDAVIT- FINAL1
03/30/2015421002836Open ↗
▸Filing & Intake Forms72
▸BISEFILING COVER SHEET37
02/19/2019421892170Open ↗
02/19/2019421892161Open ↗
01/03/2019421716147Open ↗
Showing 3 of 37 on file for this type
▸BISADDITIONAL INFORMATION24
11/25/2025420963390Open ↗
05/06/2020421892161Open ↗
01/28/2020421892161Open ↗
Showing 3 of 24 on file for this type
▸BISBOROUGH INTAKE FORM6
04/29/2020421892161Open ↗
04/29/2020421892170Open ↗
04/27/2020421690361Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
12/24/2020440658067Open ↗
12/22/2020440658049Open ↗
04/03/2020440591183Open ↗
Showing 3 of 5 on file for this type
▸Other Documents7
▸DOB NOWManufacturer's Specifications2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWCalculations2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSupporting Document: Fee Exempt1
11/25/2025420963390Open ↗
▸BISFEE EXEMPTION DOCUMENTATION1
04/03/2020440591183Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF Property Tax Assessment Roll1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type