← Back
Three families
19-30 76 STREET
QUEENS · BIN 4461862
💬 Discuss this project
1997Year Built
3Stories
C0Building Class
R4Zoning
3,630 sfGross Floor Area
3Units
Rent Stabilized2 Open Violations ▸
Three families · Owner of record: 19-30 76TH STREET, LLC · 2,500 sf lot · 1.45 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Roof1p · 1 filing · 20 docs
Floor 21p · 1 filing · 20 docs
Floor 11p · 1 filing · 20 docs
Cellar8p · 1 filing · 20 docs
Sub-Basement1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ANTISS CONSTRUCTION1807/08/2026
19-30 76TH STREET, LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHRISTOPHER TEETER712/19/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CITY WIDE EXPEDITING1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ANTISS CONSTRUCTION CORPGeneral Contractor303/21/2026
BYPASS MECHANICAL CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ASSURE PROFESSIONAL ENGIN6962212/19/2025
Building Lifecycle
All (41)Filed (7)Permit Issued (2)Signed Off (1)Violation (11)Inspection (3)Special Inspection (17)
12/31/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
GUNJAN KHANDWALA
12/31/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
GUNJAN KHANDWALA
12/31/2025
Special inspection requirement — Mechanical Systems
GUNJAN KHANDWALA
12/31/2025
Special inspection requirement — Wood – Seismic Resistance
12/31/2025
Special inspection requirement — Final
ROMAN MARDAREWICH
12/31/2025
Special inspection requirement — Fire-Resistance Rated Construction
Christopher Teeter
12/31/2025
Special inspection requirement — Energy Code Compliance Inspections
Christopher Teeter
12/31/2025
Special inspection requirement — Structural Wood Frame
Christopher Teeter
12/31/2025
Special inspection requirement — Fenestration air leakage
Christopher Teeter
12/31/2025
Special inspection requirement — HVAC-R and service water heating system controls
Christopher Teeter
12/31/2025
Special inspection requirement — HVAC-R and service water heating equipment
Christopher Teeter
12/31/2025
Special inspection requirement — Duct leakage testing, insulation and design
Christopher Teeter
12/31/2025
Special inspection requirement — Lighting in dwelling units
Christopher Teeter
12/31/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Christopher Teeter
12/31/2025
Special inspection requirement — Lighting controls
Christopher Teeter
12/31/2025
Special inspection requirement — Maintenance information
Christopher Teeter
12/31/2025
Special inspection requirement — Interior lighting power
Christopher Teeter
12/19/2025
Filed — Alteration
REPAIR DAMAGE FROM FIRE THROUGHOUT 3 FAMILY DWELLING.
Q00953579-P5
04/15/2025
Signed off — Alteration
REPAIR DAMAGE FROM FIRE THROUGHOUT 3 FAMILY DWELLING.
Q00953579-S1
03/25/2025
Filed — Alteration
REPAIR DAMAGE FROM FIRE THROUGHOUT 3 FAMILY DWELLING.
Q00953579-P4
02/20/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/17/2025
Filed — Alteration
REPAIR DAMAGE FROM FIRE THROUGHOUT 3 FAMILY DWELLING.
Q00953579-P3
12/16/2024
Filed — Alteration
REPAIR DAMAGE FROM FIRE THROUGHOUT 3 FAMILY DWELLING.
Q00953579-P2
12/06/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/19/2024
Filed — Alteration
REPAIR DAMAGE FROM FIRE THROUGHOUT 3 FAMILY DWELLING.
Q00953579-P1
11/07/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/18/2024
Permit issued — Plumbing
Q00953579-S1-PL
01/11/2024
Permit issued — Mechanical Systems
Q00953579-I1-GC-CX
12/04/2023
Filed — Alteration
REPAIR DAMAGE FROM FIRE THROUGHOUT 3 FAMILY DWELLING.
Q00953579-S1
12/04/2023
Filed — Alteration
REPAIR DAMAGE FROM FIRE THROUGHOUT 3 FAMILY DWELLING.
Q00953579-I1
10/15/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/05/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/31/2023
Violation issued (HPD, closed)
A
04/20/2021
Violation issued (HPD, closed)
A
04/20/2021
Violation issued (HPD, closed)
I
11/06/2019
Violation issued (HPD, closed)
I
10/26/2018
Violation issued (HPD, closed)
I
12/11/2017
Violation issued (HPD, closed)
I
11/29/2016
Violation issued (HPD, closed)
I
10/20/2015
Violation issued (HPD, closed)
I
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offBYPASS MECHANICAL CORP10/18/2024
DOB NOWMechanical SystemsPermit IssuedANTISS CONSTRUCTION CORP01/11/2024
BIS—ISSUEDBAYSWATER LTD03/02/2000
BISPLISSUEDMASTER PLB AND HTG INC03/24/1999
BIS—ISSUEDHARRIET LEVER CONST CORP01/28/1999
BIS—ISSUEDHARRIET-LEVER CONSTRUCTION CORP.01/12/1999
BIS—ISSUEDHARRIET LEVER CONST CORP02/26/1998
BIS—ISSUEDHARRIET LEVER CONST CORP07/14/1997
1 project · most recent 12/19/2025
Associated Ducts and Piping
FiledStatusContractorScopeMake / Model / Capacity
12/19/2025Permit IssuedANTISS CONSTRUCTION CORPAssociated Ducts and Piping
Ducts & Piping
Broan AK110 150 CFM · Exhaust Fan ×3
1 project · most recent 04/12/2024
General Wiring
FiledStatusContractorScope
04/12/2024CompleteMAS ELECTRIC & TECH LLCGeneral Wiring
1 project · most recent 12/19/2025
Wood
FiledStatusContractorScope
12/19/2025Signed-offBYPASS MECHANICAL CORPWood
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
02/20/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/06/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/07/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
12/31/2025Fire-Resistant Penetrations and JointsGUNJAN KHANDWALAspecial
12/31/2025Structural Stability – Alterations of existing buildingsGUNJAN KHANDWALAspecial
12/31/2025Mechanical SystemsGUNJAN KHANDWALAspecial
12/31/2025Wood – Seismic Resistance—special
12/31/2025FinalROMAN MARDAREWICHprogress
12/31/2025Fire-Resistance Rated ConstructionChristopher Teeterprogress
12/31/2025Energy Code Compliance InspectionsChristopher Teeterprogress
12/31/2025Structural Wood FrameChristopher Teeterprogress
12/31/2025Fenestration air leakageChristopher Teeterenergy_progress
12/31/2025HVAC-R and service water heating system controlsChristopher Teeterenergy_progress
12/31/2025HVAC-R and service water heating equipmentChristopher Teeterenergy_progress
12/31/2025Duct leakage testing, insulation and designChristopher Teeterenergy_progress
12/31/2025Lighting in dwelling unitsChristopher Teeterenergy_progress
12/31/2025HVAC-R and service water piping design and insulationChristopher Teeterenergy_progress
12/31/2025Lighting controlsChristopher Teeterenergy_progress
12/31/2025Maintenance informationChristopher Teeterenergy_progress
12/31/2025Interior lighting powerChristopher Teeterenergy_progress
▾Documents — 51 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/20/2026Q00953579-S1Request digital key ↗
08/20/2026Q00953579-I1Request digital key ↗
08/20/2026Q00953579-P1Request digital key ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications40
▸DOB NOWProgress Inspector Seal & Signature26
08/28/2026Q00953579-P6Open ↗
08/28/2026Q00953579-P6Open ↗
08/28/2026Q00953579-P6Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/20/2026Q00953579-I1Open ↗
08/20/2026Q00953579-S1Open ↗
08/20/2026Q00953579-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/28/2026Q00953579-P6Open ↗
08/28/2026Q00953579-P6Open ↗
08/28/2026Q00953579-P6Open ↗
Showing 3 of 6 on file for this type
▸Other Documents3
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026Q00953579-P5Open ↗
08/13/2026Q00953579-P6Open ↗
08/13/2026Q00953579-I1Open ↗