← Back
BuildNYC
Three families
19-79 80TH STREET
QUEENS · BIN 4021119
💬 Discuss this project
1945Year Built
3Stories
C0Building Class
R4Zoning
2,635 sfGross Floor Area
3Units
Three families · 2,000 sf lot · 1.32 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1p · 1 filing · 15 docs
Floor 37p · 1 filing · 15 docs
Floor 28p · 1 filing · 15 docs
Floor 18p · 1 filing · 15 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Frank J Quatela Architects306/09/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Build Assist Planning and Consulting603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Hands on Restorationspecialty_contractor507/08/2026
Triangle ElectricElectrical103/22/2026
J.G.C. Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Frank J. Quatela, Architects1632306/09/2025
Building Lifecycle
All (19)Filed (3)Permit Issued (4)Inspection (3)Special Inspection (9)
08/08/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
06/09/2025
Filed — Alteration
NEW WASHER, DRYER AND SINK ON THE FIRST FLOOR, REPLACE SINK AT SECOND FLOOR. FILING IN CONJUNCTION WITH DOB NOW #Q01123711. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q01123711-P1
05/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FRANK QUATELA
05/28/2025
Special inspection requirement — Energy Code Compliance Inspections
FRANK QUATELA
05/28/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FRANK QUATELA
04/18/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/14/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
02/24/2025
Permit issued — Plumbing
Q01123711-S2-PL
01/07/2025
Permit issued — General Construction
Q01123711-I1-GC
01/07/2025
Permit issued — General Construction
Q01123711-I1-GC
11/01/2024
Permit issued — General Construction
Q01123711-I1-GC
10/22/2024
Filed — Alteration
NEW WASHER, DRYER AND SINK ON THE FIRST FLOOR, REPLACE SINK AT SECOND FLOOR. FILING IN CONJUNCTION WITH DOB NOW #Q01123711. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q01123711-S2
10/22/2024
Filed — Alteration
NEW WASHER, DRYER AND SINK ON THE FIRST FLOOR, REPLACE SINK AT SECOND FLOOR. FILING IN CONJUNCTION WITH DOB NOW #Q01123711. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q01123711-I1
10/11/2024
Special inspection requirement — Interior lighting power
FRANK QUATELA
10/11/2024
Special inspection requirement — Insulation placement and R values
FRANK QUATELA
10/08/2024
Special inspection requirement — Energy Code Compliance Inspections
FRANK QUATELA
10/08/2024
Special inspection requirement — Fire-Resistance Rated Construction
FRANK QUATELA
10/08/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FRANK QUATELA
10/08/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
FRANK QUATELA
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offJ.G.C. Plumbing & Heating02/24/2025
DOB NOWGeneral ConstructionPermit IssuedHands on Restoration01/07/2025
DOB NOWGeneral ConstructionPermit IssuedHands on Restoration01/07/2025
DOB NOWGeneral ConstructionPermit IssuedHands on Restoration11/01/2024
1 project · most recent 06/09/2025
Water/Sanitary
FiledStatusContractorScope
06/09/2025Signed-offJ.G.C. Plumbing & HeatingWater/Sanitary
3 projects · most recent 05/09/2024
FiledStatusContractorScope
05/09/2024CompleteTopp Wire Electric2 meters, 2 new_meters
03/08/2024Permit IssuedTriangle Electric—
12/14/2023Permit IssuedAll Ways Electric Corp.w—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
08/08/2025Fail-Final General Construction Non-Directive 14FailView ↗
04/18/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/14/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
05/28/2025Fire-Resistant Penetrations and JointsFRANK QUATELAspecial
05/28/2025Energy Code Compliance InspectionsFRANK QUATELAprogress
05/28/2025HVAC-R and service water piping design and insulationFRANK QUATELAenergy_progress
10/11/2024Interior lighting powerFRANK QUATELAenergy_progress
10/11/2024Insulation placement and R valuesFRANK QUATELAenergy_progress
10/08/2024Energy Code Compliance InspectionsFRANK QUATELAprogress
10/08/2024Fire-Resistance Rated ConstructionFRANK QUATELAprogress
10/08/2024Fire-Resistant Penetrations and JointsFRANK QUATELAspecial
10/08/2024Structural Stability – Alterations of existing buildingsFRANK QUATELAspecial
▾Documents — 15 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/20/2026Q01123711-I1Request digital key ↗
08/20/2026Q01123711-P1Request digital key ↗
08/20/2026Q01123711-S2Request digital key ↗
▸Seals & Professional Certifications9
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026Q01123711-I1Open ↗
09/01/2026Q01123711-I1Open ↗
08/29/2026Q01123711-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/20/2026Q01123711-S2Open ↗
08/13/2026Q01123711-P1Open ↗
08/13/2026Q01123711-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026Q01123711-I1Open ↗
08/29/2026Q01123711-P1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/20/2026Q01123711-S2Open ↗
08/13/2026Q01123711-P1Open ↗
08/13/2026Q01123711-I1Open ↗