ECB08/05/2026AT THE TIME OF INSPECTION, A WATER HEATER INSTALLATION IN A SHED AT THE REAR YARD WAS OBSERVED TO HAVE BEEN COMPLETED WITHOUT A PERMIT. THE WORK APPEARS TO HAVE INVOLVED PLUMBING CONNECTIONS TO INSTALL THE WATE$2K due
ECB08/05/2026AT THE TIME OF INSPECTION, ELECTRICAL WORK INSIDE A SHED IN THE REAR YARD WAS OBSERVED TO HAVE BEEN COMPLETED WITHOUT A PERMIT. THE INSTALLATION APPEARS TO INCLUDE BX CONDUITS CONNECTING TO LIGHT SWITCHES, OUTL$2K due
ECB08/05/2026AT THE TIME OF INSPECTION, UNSAFE CONDITIONS WERE OBSERVED THROUGHOUT THE REAR-YARD SHED DUE TO EXPOSED ELECTRICAL WIRING ACROSS THE INTERIOR. THIS CONDITION RAISES CONCERNS FOR A POTENTIAL FIRE, AS THE SHED IS$2K due
ECB08/05/2026AT THE TIME OF INSPECTION, AN EXCESSIVE AMOUNT OF CONSTRUCTION DEBRIS WAS OBSERVED PILED IN THE REAR YARD OF THE PROPERTY. THIS CONDITION RAISES CONCERNS FOR A POTENTIAL FIRE RISK, AS THE DEBRIS MATERIALS ARE C$2K due
ECB08/05/2026AT THE TIME OF INSPECTION, A MAKESHIFT SHED IN THE REAR YARD WAS FOUND TO BE INSTALLED WITHOUT A PERMIT. THE STRUCTURE APPEARS TO BE 80% COMPLETED DUE TO THE SIDE OF THE SHED MISSING , CONSTRUCTED USING 4X4 POS$1K due