← Back
Primarily 2 family with 1 store or office
MACE STREET
STATEN ISLAND · BIN 5175592
💬 Discuss this project
2024Year Built
3Stories
S2Building Class
R1-2Zoning
3,325 sfGross Floor Area
3Units
0 Open ViolationsFDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: DAQUILASIGONA LLC · 4,000 sf lot · 0.83 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralFire Protection
Floor 34p · 2 filings · 20 docs
Floor 23p · 1 filing · 20 docs
Floor 15p · 2 filings · 20 docs
Basement4p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MONELLO ENTERPRISES2407/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOSEPH M. MORACE, A.I.A., ARCHITECT502/21/2025
A TECH ENGINEERING NYC, PLLC.102/26/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PATRICIA L GASS1003/21/2026
A TECH ENGINEERING NYC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MONELLO ENTERPRISES INCGeneral Contractor307/08/2026
FLOW-RIGHT PLBG & HTG CORPlumbing207/08/2026
FLOW-RIGHT FIRE SUPP CORPFire Protection107/08/2026
DV PLUMBING INCPlumbing107/08/2026
QUALITY PLUMBING, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738302/21/2025
Building Lifecycle
All (68)Filed (6)Permit Issued (7)Signed Off (3)Violation (1)Inspection (19)Objection (2)Special Inspection (30)
03/17/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/26/2025
Special inspection requirement — Shutoff dampers
anthony santoro
02/21/2025
Filed — New Building
PROPOSED INSTALLATION OF NEW 9' CURB CUT FOR SEMI-DETACHED MIXED USE BUILDING COMBINED WITH ADJACENT CURB CUT TOTALLING 18'.
S00896943-P2
02/20/2025
Special inspection requirement — Shutoff dampers
02/20/2025
Special inspection requirement — Concrete - Cast-In-Place
anthony santoro
02/20/2025
Special inspection requirement — Air barrier — testing
anthony santoro
02/20/2025
Special inspection requirement — Ventilation and air distribution system
anthony santoro
02/20/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
anthony santoro
02/20/2025
Special inspection requirement — Masonry
anthony santoro
02/20/2025
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
anthony santoro
02/20/2025
Special inspection requirement — Wood – Seismic Resistance
02/20/2025
Special inspection requirement — Wood – Prefabricated I-Joists
anthony santoro
02/20/2025
Special inspection requirement — Maintenance information
anthony santoro
02/20/2025
Special inspection requirement — Structural Wood Frame
anthony santoro
02/20/2025
Special inspection requirement — Fenestration air leakage
anthony santoro
02/20/2025
Special inspection requirement — Permanent certificate
anthony santoro
02/20/2025
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
02/20/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
02/20/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
anthony santoro
02/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
02/20/2025
Special inspection requirement — Mechanical Systems
anthony santoro
02/20/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
anthony santoro
02/20/2025
Special inspection requirement — Subgrade Inspections
anthony santoro
02/20/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
02/20/2025
Special inspection requirement — Final
anthony santoro
02/20/2025
Special inspection requirement — Fire-Resistance Rated Construction
anthony santoro
02/20/2025
Special inspection requirement — Footing and Foundation
anthony santoro
02/20/2025
Special inspection requirement — Lowest Floor Elevation
anthony santoro
02/20/2025
Special inspection requirement — Metering
anthony santoro
02/20/2025
Special inspection requirement — Air barrier - visual inspection
anthony santoro
02/20/2025
Special inspection requirement — Protection of exposed foundation insulation
anthony santoro
02/20/2025
Special inspection requirement — Fenestration areas
anthony santoro
12/12/2024
Signed off — New Building
PROPOSED INSTALLATION OF NEW 9' CURB CUT FOR SEMI-DETACHED MIXED USE BUILDING COMBINED WITH ADJACENT CURB CUT TOTALLING 18'.
S00896943-S4
12/12/2024
Signed off — Alteration
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM WITH VALVES AND METERS FOR SAME.
S00946619-I1
12/11/2024
Signed off — New Building
PROPOSED INSTALLATION OF NEW 9' CURB CUT FOR SEMI-DETACHED MIXED USE BUILDING COMBINED WITH ADJACENT CURB CUT TOTALLING 18'.
S00896943-S1
11/27/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/26/2024
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
11/22/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/20/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/20/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
11/18/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/18/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/14/2024
Filed — New Building
PROPOSED INSTALLATION OF NEW 9' CURB CUT FOR SEMI-DETACHED MIXED USE BUILDING COMBINED WITH ADJACENT CURB CUT TOTALLING 18'.
S00896943-P1
11/08/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/08/2024
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
07/16/2024
Permit issued — Curb Cut
S00896943-S4-CC
07/10/2024
Filed — New Building
PROPOSED INSTALLATION OF NEW 9' CURB CUT FOR SEMI-DETACHED MIXED USE BUILDING COMBINED WITH ADJACENT CURB CUT TOTALLING 18'.
S00896943-S4
05/06/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/18/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/26/2024
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
03/22/2024
Permit issued — Sprinklers
S00946619-I1-PL
03/22/2024
Permit issued — Plumbing
S00946619-I1-EW-SP
03/22/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
03/19/2024
Permit issued — Plumbing
S80235806-S1-PL
03/13/2024
Violation issued (ECB, closed)
Construction
03/01/2024
Permit issued — Plumbing
S00896943-S1-PL
02/26/2024
Filed — Alteration
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM WITH VALVES AND METERS FOR SAME.
S00946619-I1
02/07/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/19/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/19/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
Latest 60 of 68 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offMONELLO ENTERPRISES INC07/16/2024
DOB NOWSprinklersSigned-offFLOW-RIGHT PLBG & HTG COR03/22/2024
DOB NOWPlumbingSigned-offFLOW-RIGHT FIRE SUPP CORP03/22/2024
DOB NOWPlumbingSigned-offQUALITY PLUMBING, INC03/19/2024
DOB NOWPlumbingSigned-offDV PLUMBING INC03/01/2024
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR12/12/2023
DOB NOWFoundationPermit IssuedMONELLO ENTERPRISES INC12/08/2023
1 project · most recent 02/21/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
02/21/2025Signed-offDV PLUMBING INCGas, Storm, Water/Sanitary
1 project · most recent 03/12/2024
General Wiring
FiledStatusContractorScope
03/12/2024CompleteK-10 ELECTRIC CORPGeneral Wiring
1 project · most recent 02/21/2025
Concrete Masonry Wood
FiledStatusContractorScope
02/21/2025Signed-offMONELLO ENTERPRISES INCConcrete, Masonry, Wood
1 project · most recent 02/21/2025
Earthwork
FiledStatusContractorScope
02/21/2025Signed-offMONELLO ENTERPRISES INCEarthwork
▾Field Inspections (DOB CAP) — 19
DateTypeResultReport
03/17/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/27/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/26/2024Pass-Final PL - UndergroundPassView ↗
11/22/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/20/2024Pass-Final CND-Occupancy InspectionPassView ↗
11/20/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
11/18/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/18/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/08/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/08/2024Pass-Final SP - Up to 3 Requested FloorsPassView ↗
05/06/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/18/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/26/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
03/22/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
02/07/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/19/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/19/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/29/2023Pass-Final PL - UndergroundPassView ↗
01/11/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 72
DateRequirementInspectorRole
02/26/2025Shutoff dampersanthony santoroenergy_progress
02/20/2025Air barrier - visual inspectionanthony santoroenergy_progress
02/20/2025Fire-Resistant Penetrations and Jointsanthony santorospecial
02/20/2025Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)anthony santorospecial
02/20/2025Masonryanthony santorospecial
02/20/2025Mechanical Systemsanthony santorospecial
02/20/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationanthony santorospecial
02/20/2025Subgrade Inspectionsanthony santorospecial
02/20/2025Subsurface Investigations (Borings/Test Pits)anthony santorospecial
02/20/2025Wood – Prefabricated I-Joistsanthony santorospecial
02/20/2025Wood – Seismic Resistance—special
02/20/2025Energy Code Compliance Inspectionsanthony santoroprogress
02/20/2025Finalanthony santoroprogress
02/20/2025Fire-Resistance Rated Constructionanthony santoroprogress
02/20/2025Footing and Foundationanthony santoroprogress
02/20/2025Lowest Floor Elevationanthony santoroprogress
02/20/2025Structural Wood Frameanthony santoroprogress
02/20/2025Maintenance informationanthony santoroenergy_progress
02/20/2025Meteringanthony santoroenergy_progress
02/20/2025Fenestration air leakageanthony santoroenergy_progress
02/20/2025Protection of exposed foundation insulationanthony santoroenergy_progress
02/20/2025Permanent certificateanthony santoroenergy_progress
02/20/2025Fenestration and door U-factor and product ratingsanthony santoroenergy_progress
02/20/2025Ventilation and air distribution systemanthony santoroenergy_progress
02/20/2025Air barrier — testing anthony santoroenergy_progress
Latest 25 of 72.
▾Documents — 50 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/21/2026S00946619-I1Request digital key ↗
08/21/2026S00896943-P2Request digital key ↗
08/21/2026S00896943-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026S00896943-I1Open ↗
08/13/2026S00896943-P2Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026S00896943-P2Open ↗
08/13/2026S00896943-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00896943-I1Open ↗
▸Seals & Professional Certifications18
▸DOB NOWSpecial Inspector Seal & Signature7
08/27/2026S00896943-I1Open ↗
08/27/2026S00896943-I1Open ↗
08/27/2026S00896943-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/21/2026S00896943-S1Open ↗
08/21/2026S00896943-P2Open ↗
08/21/2026S00896943-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/27/2026S00896943-I1Open ↗
08/27/2026S00896943-I1Open ↗
08/27/2026S00896943-I1Open ↗
Showing 3 of 5 on file for this type
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026S00896943-I1Open ↗
08/13/2026S00896943-P2Open ↗
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist2
08/13/2026S00896943-I1Open ↗
08/13/2026S00896943-P2Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00896943-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S00896943-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00896943-I1Open ↗
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/13/2026S00896943-P2Open ↗
08/13/2026S00896943-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00896943-I1Open ↗
▸Other Documents11
▸DOB NOWFlood Plan Emergency Temporary Flood Shields3
08/21/2026S00896943-P2Open ↗
08/21/2026S00896943-I1Open ↗
08/15/2026S00896943-P2Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026S00896943-I1Open ↗
08/13/2026S00896943-P2Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026S00896943-P2Open ↗
08/13/2026S00896943-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/21/2026S00896943-P2Open ↗
08/21/2026S00896943-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00896943-I1Open ↗
▸DOB NOWFEMA Elevation Certificate (086-0-33)/Flood Proofing Certificate (086-0-34)1
08/13/2026S00896943-I1Open ↗