← Back
Miscellaneous two family
19 BASSETT AVENUE
BROOKLYN · Marine Park-Mill Basin-Bergen Beach · BIN 3243297
💬 Discuss this project
1965Year Built
1Stories
B9Building Class
R2Zoning
2,386 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Miscellaneous two family · 4,315 sf lot · 0.55 FAR built · Flood zone X500
Locations of Work
ArchitectureElectrical
Roof2p · 1 filing · 9 docs
Floor 14p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GORMAKHE,LLC503/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/30/2023$1.4M—— → —$566/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC108/27/2024
KINDO HOLDINGS, LLC102/06/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EDITA MC CORPGeneral Contractor303/21/2026
SUNRUN INSTALLATION SVCGeneral Contractor203/21/2026
SUNRUN SOLAR ELECTL CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272108/27/2024
ZARINA KINDO, RA4900102/06/2024
Building Lifecycle
All (26)Filed (2)Permit Issued (2)Signed Off (1)Violation (2)Inspection (3)Objection (10)Special Inspection (6)
03/14/2025
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01097124-I1
02/11/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/19/2024
Permit issued — Solar
B01097124-I1-SL
11/20/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
11/01/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
10/16/2024
Permit issued — General Construction
B00986232-I1-GC
08/28/2024
Violation issued (ECB, closed)
Construction
08/28/2024
Violation issued (ECB, closed)
Construction
08/27/2024
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01097124-I1
08/15/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
08/15/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
08/15/2024
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
08/15/2024
Special inspection requirement — Final
Walid Abdulla
08/15/2024
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
04/29/2024
Objection resolved — Addressed
04/29/2024
Objection resolved — Addressed
04/29/2024
Objection resolved — Addressed
04/29/2024
Objection resolved — Addressed
04/29/2024
Objection resolved — Addressed
03/28/2024
Objection raised — Other
03/28/2024
Objection raised — Other
02/29/2024
Objection raised — Other
02/14/2024
Objection raised — Other
02/14/2024
Objection raised — Other
02/06/2024
Filed — Alteration
B00986232-I1
02/05/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
ZARINA KINDO
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC12/19/2024
DOB NOWGeneral ConstructionPermit IssuedEDITA MC CORP10/16/2024
BISPLISSUEDG A PLBG HTG & SPRINKLER INC08/29/2003
1 project · most recent 08/27/2024
FiledStatusContractorScope
08/27/2024CompleteSUNRUN SOLAR ELECTL CORP—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
02/11/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/20/2024Fail-Final General Construction Non-Directive 14FailView ↗
11/01/2024Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
08/15/2024Fire-Resistant Penetrations and JointsWalid Abdullaspecial
08/15/2024Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
08/15/2024Energy Code Compliance InspectionsWalid Abdullaprogress
08/15/2024FinalWalid Abdullaprogress
08/15/2024Air barrier - visual inspectionWalid Abdullaenergy_progress
02/05/2024Structural Stability – Alterations of existing buildingsZARINA KINDOspecial
▾Documents — 13 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/26/2026B00986232-I1Request digital key ↗
08/24/2026B01097124-I1Request digital key ↗
▸Seals & Professional Certifications8
▸DOB NOWProgress Inspector Seal & Signature3
08/28/2026B01097124-I1Open ↗
08/28/2026B01097124-I1Open ↗
08/28/2026B01097124-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
08/30/2026B00986232-I1Open ↗
08/28/2026B01097124-I1Open ↗
08/28/2026B01097124-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/26/2026B00986232-I1Open ↗
08/13/2026B01097124-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/26/2026B00986232-I1Open ↗
08/13/2026B01097124-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B01097124-I1Open ↗