← Back
Four families
19 CAMBRIDGE PLACE
BROOKLYN · BIN 3056202
💬 Discuss this project
1872Year Built
3.5Stories
C3Building Class
R6BZoning
2,305 sfGross Floor Area
4Units
Rent Stabilized16 Open Violations ▸FDNY Report ↗
Four families · 2,000 sf lot · 1.15 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
Floor 3Under Construction82p · 1 filing · 20 docs
Floor 2Under Construction95p · 1 filing · 20 docs
Floor 1Under Construction89p · 1 filing · 20 docs
CellarUnder Construction87p · 1 filing · 20 docs
BasementUnder Construction96p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
B D CONSTRUCTION SA407/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FISKAA ENGINEERING1008/17/2026
ROBERT SILMAN ASSOC STRUCT ENG DPC204/11/2025
URBAN INTEGRATIONS203/14/2025
KUSHNER STUDIOS301/27/2025
ASHRAF CORP107/11/2023
GASBARRO STRUCTURAL ENGINEERING112/03/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KUSHNER STUDIOS1503/21/2026
UNITED SAFETY CONSULTANTS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ALL DIMENSION HOME IMPROVEMENTGeneral Contractor1807/08/2026
TMS PLBG & HEATING CORPPlumbing307/08/2026
WNW & SONS PLUMBING & HTGFire Protection207/08/2026
NEW WAVE DESIGN & CONTRACTINGGeneral Contractor207/08/2026
B & D CONSTRUCTION SA INCGeneral Contractor107/08/2026
HATCHET WORKS CORPGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CROSSCHECK INSPECTION SER5441408/17/2026
GASBARRO STRUCTURAL ENGIN5919112/03/2021
Building Lifecycle
All (185)Filed (19)Permit Issued (23)Signed Off (1)Violation (30)Inspection (12)Objection (70)Special Inspection (30)
08/17/2026
Filed — Alteration CO
INSTALLATION OF NEW SPLIT HVAC SYSTEM INCLUDING DUCTWORK AS INDICATED ON THE DRAWINGS FILED HEREIN.
B08005424-P9
08/14/2026
Special inspection requirement — Maintenance information
08/14/2026
Special inspection requirement — HVAC-R and service water heating equipment
08/14/2026
Special inspection requirement — HVAC-R and service water heating system controls
08/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
08/14/2026
Special inspection requirement — Permanent certificate
08/14/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
05/05/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/04/2026
Violation issued (HPD, closed)
A
03/03/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/03/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/23/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/06/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/10/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/06/2025
Permit issued — Structural
B08005424-S3-ST
11/06/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/05/2025
Permit issued — Sprinklers
B08005424-S4-EW-SP
10/22/2025
Objection resolved — Addressed
10/22/2025
Special inspection requirement — Permanent certificate
10/22/2025
Special inspection requirement — HVAC-R and service water heating equipment
10/22/2025
Special inspection requirement — HVAC-R and service water heating system controls
10/22/2025
Special inspection requirement — Maintenance information
10/22/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
10/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
10/21/2025
Objection raised — Energy
10/20/2025
Objection resolved — Addressed
10/15/2025
Objection raised — Energy
10/14/2025
Objection raised — Energy
10/14/2025
Objection resolved — Addressed
10/08/2025
Permit issued — General Construction
B08005424-I1-GC
10/06/2025
Objection resolved — Addressed
10/02/2025
Permit issued — Supported Scaffold
B01018925-I1-SF
09/19/2025
Special inspection requirement — Mechanical Systems
EUGENE BIFULCO
09/19/2025
Special inspection requirement — Heating Systems
EUGENE BIFULCO
09/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
09/19/2025
Special inspection requirement — HVAC-R and service water heating system controls
EUGENE BIFULCO
09/19/2025
Special inspection requirement — Exhaust and Vent Systems in Plenums and Ducts
EUGENE BIFULCO
09/19/2025
Special inspection requirement — Shutoff dampers
EUGENE BIFULCO
09/19/2025
Special inspection requirement — Ventilation and air distribution system
EUGENE BIFULCO
09/19/2025
Special inspection requirement — Duct leakage testing, insulation and design
EUGENE BIFULCO
09/19/2025
Special inspection requirement — HVAC-R and service water heating equipment
EUGENE BIFULCO
09/19/2025
Special inspection requirement — Final
EUGENE BIFULCO
09/19/2025
Special inspection requirement — Chimneys and vents
EUGENE BIFULCO
09/19/2025
Special inspection requirement — Maintenance information
EUGENE BIFULCO
09/19/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
EUGENE BIFULCO
09/17/2025
Objection raised — Other
09/15/2025
Permit issued — General Construction
B00632366-S1-GC
09/09/2025
Filed — Alteration CO
INSTALLATION OF NEW SPLIT HVAC SYSTEM INCLUDING DUCTWORK AS INDICATED ON THE DRAWINGS FILED HEREIN.
B08005424-P8
09/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
09/08/2025
Special inspection requirement — Chimneys and vents
EUGENE BIFULCO
09/08/2025
Special inspection requirement — Shutoff dampers
09/08/2025
Special inspection requirement — Duct leakage testing, insulation and design
09/08/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
09/05/2025
Filed — Alteration CO
INSTALLATION OF NEW SPLIT HVAC SYSTEM INCLUDING DUCTWORK AS INDICATED ON THE DRAWINGS FILED HEREIN.
B08005424-P6
09/02/2025
Filed — Alteration CO
INSTALLATION OF NEW SPLIT HVAC SYSTEM INCLUDING DUCTWORK AS INDICATED ON THE DRAWINGS FILED HEREIN.
B08005424-P7
06/16/2025
Permit issued — Plumbing
B08005424-S1-PL
06/09/2025
Violation issued (HPD, closed)
A
05/09/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/09/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
Latest 60 of 185 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedALL DIMENSION HOME IMPROV11/06/2025
DOB NOWSprinklersSigned-offWNW & SONS PLUMBING & HTG11/05/2025
DOB NOWGeneral ConstructionPermit IssuedALL DIMENSION HOME IMPROV10/08/2025
DOB NOWSupported ScaffoldPermit IssuedALL DIMENSION HOME IMPROV10/02/2025
DOB NOWGeneral ConstructionSigned-offALL DIMENSION HOME IMPROV09/15/2025
DOB NOWPlumbingPermit IssuedTMS PLBG & HEATING CORP06/16/2025
DOB NOWSupported ScaffoldPermit IssuedALL DIMENSION HOME IMPROV09/24/2024
DOB NOWPlumbingPermit IssuedTMS PLBG & HEATING CORP09/11/2024
DOB NOWGeneral ConstructionPermit IssuedALL DIMENSION HOME IMPROV08/27/2024
DOB NOWStructuralPermit IssuedALL DIMENSION HOME IMPROV08/27/2024
DOB NOWMechanical SystemsPermit IssuedALL DIMENSION HOME IMPROV08/27/2024
DOB NOWGeneral ConstructionSigned-offALL DIMENSION HOME IMPROV08/27/2024
DOB NOWSprinklersSigned-offWNW & SONS PLUMBING & HTG07/31/2024
DOB NOWPlumbingPermit IssuedTMS PLBG & HEATING CORP06/21/2024
DOB NOWGeneral ConstructionSigned-offALL DIMENSION HOME IMPROV06/05/2024
DOB NOWStructuralPermit IssuedALL DIMENSION HOME IMPROV06/05/2024
DOB NOWMechanical SystemsPermit IssuedALL DIMENSION HOME IMPROV06/05/2024
DOB NOWStructuralSigned-offALL DIMENSION HOME IMPROV06/05/2024
DOB NOWGeneral ConstructionPermit IssuedALL DIMENSION HOME IMPROV06/05/2024
DOB NOWSupported ScaffoldPermit IssuedB & D CONSTRUCTION SA INC07/14/2023
DOB NOWGeneral ConstructionSigned-offHATCHET WORKS CORP05/15/2023
DOB NOWStructuralSigned-offNEW WAVE DESIGN & CONTRAC02/11/2022
DOB NOWGeneral ConstructionSigned-offNEW WAVE DESIGN & CONTRAC01/11/2022
1 project · most recent 08/17/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/17/2026Permit IssuedALL DIMENSION HOME IMPROVHeating and Air Conditioning Systems
Heat / Cool
1 project · most recent 08/17/2026
Sprinkler System
FiledStatusContractorScope
08/17/2026Signed-offHQ FIRE PROTECTION INCSprinkler System
1 project · most recent 08/17/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/17/2026Permit IssuedTMS & SON PLUMBING LLCGas, Storm, Water/Sanitary
1 project · most recent 09/17/2026
General Wiring
FiledStatusContractorScope
09/17/2026Permit IssuedCOBRA ELECTRICAL NYC LLCGeneral Wiring
2 projects · most recent 08/17/2026
Concrete Steel Wood Masonry
FiledStatusContractorScope
08/17/2026Permit IssuedALL DIMENSION HOME IMPROVSteel, Concrete, Wood
12/14/2021Signed-offALL DIMENSION HOME IMPROVConcrete, Masonry
1 project · most recent 03/14/2025
Scaffold
FiledStatusContractorScope
03/14/2025Permit IssuedALL DIMENSION HOME IMPROVScaffold
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
05/05/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/03/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/03/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/23/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/06/2026Pass-Final CND-Occupancy InspectionPassView ↗
11/10/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/06/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/09/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/09/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
05/09/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/22/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/22/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 75
DateRequirementInspectorRole
08/14/2026HVAC-R and service water piping design and insulation—energy_progress
08/14/2026HVAC-R and service water heating system controls—energy_progress
08/14/2026Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
08/14/2026HVAC-R and service water heating equipment—energy_progress
08/14/2026Permanent certificate—energy_progress
08/14/2026Maintenance information—energy_progress
10/22/2025HVAC-R and service water heating equipment—energy_progress
10/22/2025HVAC-R and service water heating system controls—energy_progress
10/22/2025Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
10/22/2025HVAC-R and service water piping design and insulation—energy_progress
10/22/2025Maintenance information—energy_progress
10/22/2025Permanent certificate—energy_progress
09/19/2025Ventilation and air distribution systemEUGENE BIFULCOenergy_progress
09/19/2025HVAC-R and service water heating system controlsEUGENE BIFULCOenergy_progress
09/19/2025HVAC-R and service water piping design and insulationEUGENE BIFULCOenergy_progress
09/19/2025Shutoff dampersEUGENE BIFULCOenergy_progress
09/19/2025HVAC-R and service water heating equipmentEUGENE BIFULCOenergy_progress
09/19/2025Heating SystemsEUGENE BIFULCOspecial
09/19/2025Mechanical SystemsEUGENE BIFULCOspecial
09/19/2025Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
09/19/2025Exhaust and Vent Systems in Plenums and DuctsEUGENE BIFULCOspecial
09/19/2025Chimneys and ventsEUGENE BIFULCOspecial
09/19/2025FinalEUGENE BIFULCOprogress
09/19/2025Maintenance informationEUGENE BIFULCOenergy_progress
09/19/2025Duct leakage testing, insulation and designEUGENE BIFULCOenergy_progress
Latest 25 of 75.
▾Documents — 107 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch19
08/31/2026B00632366-S1Request digital key ↗
08/31/2026B00632366-I1Request digital key ↗
08/27/2026B00901454-I1Request digital key ↗
Showing 3 of 19 on file for this type
▸Applications & Permits9
▸DOB NOWLPC Approval/Permit9
08/13/2026B08005424-P1Open ↗
08/13/2026B08005424-S2Open ↗
08/13/2026B00632366-S1Open ↗
Showing 3 of 9 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026B08005424-P1Open ↗
08/13/2026B08005424-I1Open ↗
▸Seals & Professional Certifications35
▸DOB NOWDPL-1: Design Professional Seal & Signature19
08/31/2026B00632366-S1Open ↗
08/31/2026B00632366-I1Open ↗
08/27/2026B00901454-I1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/01/2026B08005424-S2Open ↗
09/01/2026B08005424-P5Open ↗
08/31/2026B08005424-P2Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026B08005424-S2Open ↗
09/01/2026B08005424-P5Open ↗
08/28/2026B08005424-P8Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection21
▸DOB NOWHPD-3: Single Room Occupancy Multiple Dwelling (SRO MD) Anti-Harassment Checklist19
08/19/2026B08005424-P9Open ↗
08/13/2026B00632366-I1Open ↗
08/13/2026B08005424-S3Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWStreet Tree Checklist2
08/13/2026B08005424-P1Open ↗
08/13/2026B08005424-I1Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/31/2026B00632366-I1Open ↗
08/31/2026B00632366-S1Open ↗
08/19/2026B08005424-P9Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
08/13/2026B08005424-S4Open ↗
08/13/2026B08005424-S3Open ↗
08/13/2026B08005424-S2Open ↗
Showing 3 of 5 on file for this type
▸Other Documents10
▸DOB NOWProperty Ownership Certification2
08/13/2026B08005424-P1Open ↗
08/13/2026B08005424-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026B08005424-I1Open ↗
08/13/2026B08005424-P1Open ↗
▸DOB NOWProof of Historic Building2
08/13/2026B08005424-I1Open ↗
08/13/2026B08005424-P1Open ↗
▸DOB NOWPlot Diagram2
08/13/2026B08005424-P1Open ↗
08/13/2026B08005424-I1Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026B08005424-I1Open ↗
08/13/2026B08005424-P1Open ↗