← Back
BuildNYC
Three families
19 CHARLTON STREET
MANHATTAN · BIN 1008106
💬 Discuss this project
1841Year Built
3Stories
C0Building Class
R6Zoning
4,378 sfGross Floor Area
3Units
0 Active Violations
Three families · Owner of record: Charlton Square · 2,333 sf lot · 1.88 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofResidence sprinkler systemUnder Construction27p · 6 filings · 20 docs
Floor 3Residence sprinkler systemUnder Construction36p · 5 filings · 20 docs
Floor 2Residence sprinkler systemUnder Construction34p · 5 filings · 20 docs
Floor 1Residence sprinkler systemUnder Construction33p · 5 filings · 20 docs
CellarResidence sprinkler systemUnder Construction32p · 6 filings · 20 docs
BasementResidence sprinkler systemUnder Construction1p · 1 filing · 3 docs
Sub-BasementResidence sprinkler systemUnder Construction33p · 5 filings · 20 docs
Site & exteriorHeavy duty sidewalk shed and pipe scaffolding5p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
19 Charlton Street503/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/10/2023$7.2M—19 CHARLTON STREET LLC → CHARLTON SQUARE LLC$1,645/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Charles G. Michel Engineering507/24/2026
NY Building Associates111/25/2025
Bangash Associates108/15/2024
Tocci Engineering203/27/2024
The Brooklyn Studio110/05/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J Callahan Consulting1403/21/2026
Kma Designs203/21/2026
Brooklyn Solarworks103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Pilaster DevelopmentGeneral Contractor1306/28/2026
J & G Construction ServicesScaffold1004/09/2026
Macreddin Plumbing & HeatingPlumbing306/28/2026
IA Construction ManagementGeneral Contractor303/21/2026
Pilaster Developmentspecialty_contractor306/28/2026
Accurate MechanicalFire Protection306/28/2026
Brooklyn Solarworksspecialty_contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM Engineering6244111/25/2025
City-Wide Testing416203/27/2024
Charles G Michel Engineering2871201/23/2024
The Brooklyn Studio of AR2684110/05/2023
Building Lifecycle
09/17/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/15/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/06/2026
Permit expired, never signed off — Sidewalk Shed
The city's record still shows this permit as issued, with no sign-off on its filing
M01092521-I1-SF
08/05/2026
Permit expired, never signed off — Sidewalk Shed
The city's record still shows this permit as issued, with no sign-off on its filing
M01092521-I1-SH
07/24/2026
Filed — Alteration
This Alteration is being filed for the plumbing work at the subject premises in conjunction with the Alt I application #121326608. There are no change in use, egress or occupancy under this application.
M00940126-P2
59 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedAccurate Mechanical06/23/2026
DOB NOWMechanical SystemsPermit IssuedPilaster Development06/22/2026
DOB NOWGeneral ConstructionSigned-offPilaster Development06/22/2026
DOB NOWPlumbingPermit IssuedMacreddin Plumbing & Heating06/22/2026
DOB NOWSolarPermit IssuedBrooklyn Solarworks12/02/2025
DOB NOWSidewalk ShedPermit IssuedJ & G Construction Services08/06/2025
DOB NOWSidewalk ShedPermit IssuedJ & G Construction Services08/05/2025
DOB NOWStructuralPermit IssuedPilaster Development06/27/2025
DOB NOWMechanical SystemsPermit IssuedPilaster Development06/27/2025
DOB NOWGeneral ConstructionSigned-offPilaster Development06/27/2025
DOB NOWSprinklersPermit IssuedAccurate Mechanical05/08/2025
DOB NOWPlumbingPermit IssuedMacreddin Plumbing & Heating05/05/2025
DOB NOWStructuralPermit IssuedPilaster Development12/23/2024
DOB NOWGeneral ConstructionSigned-offPilaster Development12/19/2024
DOB NOWSupported ScaffoldPermit IssuedJ & G Construction Services08/15/2024
DOB NOWSidewalk ShedPermit IssuedJ & G Construction Services08/15/2024
DOB NOWMechanical SystemsPermit IssuedPilaster Development06/26/2024
DOB NOWSprinklersPermit IssuedAccurate Mechanical05/10/2024
DOB NOWPlumbingPermit IssuedMacreddin Plumbing & Heating05/09/2024
DOB NOWStructuralPermit IssuedPilaster Development11/21/2023
DOB NOWGeneral ConstructionSigned-offPilaster Development11/21/2023
BIS—ISSUEDPilaster Development06/27/2025
BIS—ISSUEDPilaster Development04/02/2025
BIS—ISSUEDPilaster Development04/26/2024
BIS—ISSUEDIA Construction Management03/11/2022
BIS—ISSUEDIA Construction Management09/11/2021
BIS—ISSUEDIA Construction Management03/25/2021
BIS—ISSUEDIA Construction Management07/22/2020
BIS—ISSUEDIA Construction Management08/13/2018
BIS—ISSUEDIA Construction Management08/11/2017
BIS—ISSUEDIA Construction Management09/13/2016
BIS—ISSUEDIA Construction Management01/08/2016
1 project · most recent 07/24/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
07/24/2026Permit IssuedMacreddin Plumbing & HeatingGas, Storm, Water/Sanitary
3 projects · most recent 08/07/2024
General Wiring
FiledStatusContractorScope
08/07/2024Permit IssuedRichard Neu—
06/27/2024CompleteBrookyln Solarworks—
04/24/2024Permit IssuedBelmont ElectricalGeneral Wiring
1 project · most recent 03/27/2024
Masonry Wood
FiledStatusContractorScope
03/27/2024Permit IssuedPilaster DevelopmentMasonry, Wood
1 project · most recent 11/25/2025
FiledStatusContractorScope
11/25/2025Permit IssuedBrooklyn Solarworks—
1 project · most recent 08/15/2024
Scaffold Sidewalk Shed
FiledStatusContractorScope
08/15/2024Permit IssuedJ & G Construction ServicesScaffold, Sidewalk Shed
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
09/17/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/15/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/07/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
11/06/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/25/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
03/29/2024MasonryELIAS RASABIspecial
03/29/2024Wood – Seismic ResistanceELIAS RASABIspecial
03/29/2024Post-installed AnchorsELIAS RASABIspecial
03/29/2024Structural Stability – Alterations of existing buildingsELIAS RASABIspecial
03/29/2024FinalNat Tocciprogress
02/09/2024MasonryELIAS RASABIspecial
02/09/2024Post-installed AnchorsELIAS RASABIspecial
02/09/2024Structural Stability – Alterations of existing buildingsELIAS RASABIspecial
02/09/2024Wood – Seismic ResistanceELIAS RASABIspecial
02/09/2024FinalNat Tocciprogress
09/26/2023Fire-Resistant Penetrations and JointsBrendan Coburnspecial
09/26/2023FinalBrendan Coburnprogress
09/26/2023Fire-Resistance Rated ConstructionBrendan Coburnprogress
113 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account