← Back
Over six families without stores
19 COLUMBIA PLACE
BROOKLYN · BIN 3250384
💬 Discuss this project
1907Year Built
4Stories
C1Building Class
R6Zoning
4,371 sfGross Floor Area
9Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Over six families without stores · Owner of record: EDIFICE COLUMBIA, LLC · 1,528 sf lot · 2.86 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof1p · 2 filings · 20 docs
Cellar3p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HOLLISWOOD DEVELOPMENT1307/08/2026
MNK ENTERPRISES NY907/08/2026
EDIFICE COLUMBIA, LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JIN LEE, RA211/20/2025
ARQUITECTURA VARELA203/12/2025
JAMES CHAI ARCHITECT, P.C.501/09/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RICHARD WAINER ARCHITECT, PLLC1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BADGER MANAGEMENT INCGeneral Contractor507/08/2026
MNK ENTERPRISES NY INCGeneral Contractor204/08/2026
PARK CONTRACTING GROUPGeneral Contractor207/08/2026
RICHARD NEUElectrical103/22/2026
PIPESTYLISTS, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JAMES JH CHAI & ASSOCIATE6481511/20/2025
Building Lifecycle
All (55)Filed (8)Permit Issued (9)Signed Off (6)Violation (3)Inspection (3)Objection (14)Special Inspection (12)
12/01/2025
Permit issued — General Construction
B01317097-I1-GC
11/21/2025
Special inspection requirement — Tenant Protection Plan Compliance
Joon Ho Chai
11/21/2025
Special inspection requirement — Final
JIN WOO LEE
11/20/2025
Filed — Alteration
HEREBY FILING FOR REPAIRS TO FINISHES THROUGH BUILDING AND TO CONFORM COSTING TO ACTUAL FOR SUB REHAB RENOVATION PERFORMED UNDER APPLICATIONS #B01091180. NO CHANGE TOUSE OCCUPANCY OR EGRESS.
B01317097-P1
11/19/2025
Special inspection requirement — Tenant Protection Plan Compliance
Joon Ho Chai
11/19/2025
Special inspection requirement — Final
JIN WOO LEE
11/12/2025
Filed — Alteration
HEREBY FILING FOR REPAIRS TO FINISHES THROUGH BUILDING AND TO CONFORM COSTING TO ACTUAL FOR SUB REHAB RENOVATION PERFORMED UNDER APPLICATIONS #B01091180. NO CHANGE TOUSE OCCUPANCY OR EGRESS.
B01317097-I1
09/25/2025
Signed off — Alteration
B01193158-I1
09/25/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B01193155-I1
07/11/2025
Permit issued — Sidewalk Shed
B01193155-I1-SH
07/11/2025
Permit issued — Supported Scaffold
B01193158-I1-SF
06/09/2025
Violation issued (HPD, closed)
A
05/08/2025
Signed off — Alteration
REPLACEMENT OF WINDOWS, NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01163673-I1
05/05/2025
Signed off — Alteration
MECHANICAL WORK FOR RENOVATE UNITS #1F, 1R, 2F, 2R, 3F, 3R,4F, 4R AND COMMON HALLWAY FROM CELLAR TO ROOF. NO CHANGE TO USE, EGRESS OR OCCUPANCY
B01091180-S3
04/30/2025
Signed off — Alteration
MECHANICAL WORK FOR RENOVATE UNITS #1F, 1R, 2F, 2R, 3F, 3R,4F, 4R AND COMMON HALLWAY FROM CELLAR TO ROOF. NO CHANGE TO USE, EGRESS OR OCCUPANCY
B01091180-S1
04/30/2025
Signed off — Alteration
MECHANICAL WORK FOR RENOVATE UNITS #1F, 1R, 2F, 2R, 3F, 3R,4F, 4R AND COMMON HALLWAY FROM CELLAR TO ROOF. NO CHANGE TO USE, EGRESS OR OCCUPANCY
B01091180-I1
03/28/2025
Permit issued — General Construction
B01163673-I1-GC
03/12/2025
Filed — Alteration
B01193158-I1
03/12/2025
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B01193155-I1
03/12/2025
Permit issued — Supported Scaffold
B01193158-I1-SF
03/12/2025
Permit issued — Sidewalk Shed
B01193155-I1-SH
02/10/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/22/2025
Objection resolved — Addressed
01/22/2025
Objection resolved — Addressed
01/22/2025
Objection resolved — Addressed
01/22/2025
Objection resolved — Addressed
01/16/2025
Objection raised — Other
01/16/2025
Objection raised — Scope
01/16/2025
Objection raised — Inspections
01/16/2025
Objection raised — Other
01/10/2025
Permit issued — Mechanical Systems
B01091180-S3-MS
01/09/2025
Filed — Alteration
REPLACEMENT OF WINDOWS, NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01163673-I1
01/02/2025
Filed — Alteration
MECHANICAL WORK FOR RENOVATE UNITS #1F, 1R, 2F, 2R, 3F, 3R,4F, 4R AND COMMON HALLWAY FROM CELLAR TO ROOF. NO CHANGE TO USE, EGRESS OR OCCUPANCY
B01091180-S3
12/30/2024
Special inspection requirement — Fire-Resistance Rated Construction
Joon Ho Chai
12/30/2024
Special inspection requirement — Final
JIN WOO LEE
12/30/2024
Special inspection requirement — Mechanical Systems
Joon Ho Chai
12/30/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joon Ho Chai
12/30/2024
Special inspection requirement — Final
JIN WOO LEE
11/25/2024
Violation issued (HPD, closed)
I
10/29/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/25/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/07/2024
Permit issued — General Construction
B01091180-I1-GC
09/26/2024
Objection resolved — Addressed
09/26/2024
Objection resolved — Addressed
09/26/2024
Special inspection requirement — Fire-Resistance Rated Construction
Joon Ho Chai
09/20/2024
Permit issued — Plumbing
B01091180-S1-PL
09/18/2024
Objection resolved — Addressed
09/17/2024
Objection raised — Inspections
09/17/2024
Objection raised — Accessibility
09/17/2024
Objection raised — Energy
09/11/2024
Filed — Alteration
MECHANICAL WORK FOR RENOVATE UNITS #1F, 1R, 2F, 2R, 3F, 3R,4F, 4R AND COMMON HALLWAY FROM CELLAR TO ROOF. NO CHANGE TO USE, EGRESS OR OCCUPANCY
B01091180-S1
09/10/2024
Filed — Alteration
MECHANICAL WORK FOR RENOVATE UNITS #1F, 1R, 2F, 2R, 3F, 3R,4F, 4R AND COMMON HALLWAY FROM CELLAR TO ROOF. NO CHANGE TO USE, EGRESS OR OCCUPANCY
B01091180-I1
08/06/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joon Ho Chai
08/05/2024
Special inspection requirement — Final
JIN WOO LEE
02/23/2022
Violation issued (HPD, closed)
A
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offBADGER MANAGEMENT12/01/2025
DOB NOWSidewalk ShedSigned-offPARK CONTRACTING GROUP07/11/2025
DOB NOWSupported ScaffoldSigned-offPARK CONTRACTING GROUP07/11/2025
DOB NOWGeneral ConstructionSigned-offBADGER MANAGEMENT03/28/2025
DOB NOWSupported ScaffoldSigned-offMNK ENTERPRISES NY INC03/12/2025
DOB NOWSidewalk ShedSigned-offMNK ENTERPRISES NY INC03/12/2025
DOB NOWMechanical SystemsSigned-offBADGER MANAGEMENT01/10/2025
DOB NOWGeneral ConstructionSigned-offBADGER MANAGEMENT10/07/2024
DOB NOWPlumbingSigned-offT & T PLUMBING INC09/20/2024
1 project · most recent 01/02/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
01/02/2025Signed-offBADGER MANAGEMENT INCHeating and Air Conditioning Systems
Heat / Cool
Daikin 4MXS36WMVJU9 36,000 BTU · Heat Pump Outdoor ×28
2MXS18NMVJUA 24,000 BTU · Heat Pump Outdoor ×4
2 projects · most recent 03/13/2025
General Wiring
FiledStatusContractorScope
03/13/2025Permit IssuedRICHARD NEU—
11/15/2024CompleteE & M ELECTRICAL NY CORPGeneral Wiring
1 project · most recent 11/20/2025
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
11/20/2025Signed-offBADGER MANAGEMENT INCTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
02/10/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/29/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/25/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
11/21/2025Tenant Protection Plan ComplianceJoon Ho Chaispecial
11/21/2025FinalJIN WOO LEEprogress
11/19/2025Tenant Protection Plan ComplianceJoon Ho Chaispecial
11/19/2025FinalJIN WOO LEEprogress
12/30/2024Fire-Resistance Rated ConstructionJoon Ho Chaiprogress
12/30/2024FinalJIN WOO LEEprogress
12/30/2024Mechanical SystemsJoon Ho Chaispecial
12/30/2024Fire-Resistant Penetrations and JointsJoon Ho Chaispecial
12/30/2024FinalJIN WOO LEEprogress
09/26/2024Fire-Resistance Rated ConstructionJoon Ho Chaiprogress
08/06/2024Fire-Resistant Penetrations and JointsJoon Ho Chaispecial
08/05/2024FinalJIN WOO LEEprogress
▾Documents — 55 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/23/2026B01091180-S2Request digital key ↗
08/23/2026B01091180-S3Request digital key ↗
08/23/2026B01091180-S1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits7
▸DOB NOWLPC Approval/Permit7
08/13/2026B01317097-P1Open ↗
08/13/2026B01163673-I1Open ↗
08/13/2026B01091180-S2Open ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications21
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/23/2026B01091180-S3Open ↗
08/23/2026B01091180-S2Open ↗
08/23/2026B01091180-S1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/01/2026B01317097-P1Open ↗
08/25/2026B01091180-I1Open ↗
08/25/2026B01091180-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026B01317097-P1Open ↗
08/25/2026B01091180-I1Open ↗
08/24/2026B01317097-I1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/23/2026B01091180-S3Open ↗
08/23/2026B01091180-S2Open ↗
08/23/2026B01091180-S1Open ↗
Showing 3 of 7 on file for this type
▸Other Documents11
▸DOB NOWDHCR Document7
08/13/2026B01091180-S1Open ↗
08/13/2026B01091180-S3Open ↗
08/13/2026B01091180-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProof of Historic Building4
08/13/2026B01317097-P1Open ↗
08/13/2026B01091180-I1Open ↗
08/13/2026B01163673-I1Open ↗
Showing 3 of 4 on file for this type