| Owner | Filings | Most Recent |
|---|---|---|
| Greenpoint Hospital Shelter HDFC | 24 | 07/08/2026 |
| Maspeth B2 Owner | 7 | 07/08/2026 |
| NYC Department of General Services | 5 | 03/21/2026 |
| NYC Department Design & Construction | 3 | 03/21/2026 |
| MBR Cont | 1 | 03/21/2026 |
| Payco | 1 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| Eskw/A | 8 | 07/17/2026 |
| Lombardo Professional Engineering | 3 | 06/16/2026 |
| Loring Consulting Engineers | 7 | 12/15/2025 |
| FL&M Engineering Design & Inspection | 7 | 12/20/2024 |
| Paul Perdek, Prof. Engineering | 3 | 08/15/2024 |
| Ashraf | 3 | 11/15/2023 |
| Fabio Daza, PE | 1 | 06/13/2023 |
| NYC Department of Housing Preservation and Development | 3 | 01/12/2023 |
| Urban Design Engineering | 1 | 12/19/2022 |
| Philip Habib & Associates | 2 | 06/03/2022 |
| Geodesign | 1 | 11/15/2021 |
| Gregory V. Perotto, P.E | 2 | 03/12/2020 |
| Representative | Filings | Most Recent |
|---|---|---|
| William Vitacco Associates | 18 | 03/21/2026 |
| Lewsan Consulting | 4 | 03/21/2026 |
| Archi Pro Group | 3 | 03/21/2026 |
| KD Designs | 3 | 03/21/2026 |
| AE Design Solution | 6 | 03/21/2026 |
| Rigid Structural Design | 13 | 03/21/2026 |
| Domani Consulting | 1 | 03/21/2026 |
| HS Design Studio | 4 | 03/21/2026 |
| Construction Lab | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| Broadway Builders | General Contractor | 23 | 07/08/2026 |
| DHS Fraco | Scaffold | 12 | 07/08/2026 |
| Dynamic Hoisting Scaff | Scaffold | 11 | 07/08/2026 |
| Bletsas Plumbing & Heating | Fire Protection | 6 | 07/08/2026 |
| Core Scaffold Systems | Scaffold | 4 | 07/08/2026 |
| Fisher Installations | Scaffold | 4 | 07/08/2026 |
| Bletsas Plumbing & Heating | Plumbing | 4 | 07/08/2026 |
| Flint Mechanical | Plumbing | 3 | 07/08/2026 |
| Flint Mechanical | Fire Protection | 3 | 07/08/2026 |
| Celtic Services NYC | General Contractor | 3 | 03/21/2026 |
| Crescent Contracting | Plumbing | 3 | 07/08/2026 |
| Aura Plumbing | Fire Protection | 3 | 07/08/2026 |
| Panili Plumbing & Heating | Plumbing | 2 | 07/08/2026 |
| Bletsas P H | Plumbing | 1 | 03/22/2026 |
| Citywide Electrical Contracting | Electrical | 1 | 03/21/2026 |
| Walliccan Electrical Contracting | Electrical | 1 | 03/21/2026 |
| Twins Electric | Electrical | 1 | 03/21/2026 |
| H & D Electrical | Electrical | 1 | 03/21/2026 |
| Universal Electric | Electrical | 1 | 03/21/2026 |
| Sigma Electric | Electrical | 1 | 03/22/2026 |
| Let It Grow | General Contractor | 1 | 04/09/2026 |
| SC Prime Energy | General Contractor | 1 | 04/09/2026 |
| Ally Hazrat | Electrical | 1 | 03/21/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| Domani Inspection Service | 843 | 18 | 07/17/2026 |
| Lombardo Prof Engineering | 8566 | 3 | 06/16/2026 |
| Geodesign | 627 | 1 | 11/15/2021 |
| Gregory V. Perotto, P.E | 947 | 2 | 03/12/2020 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Suspended Scaffold | Signed-off | Elm Suspension Systems | 06/17/2026 |
| DOB NOW | Standpipe | Signed-off | Bletsas P&H | 01/19/2026 |
| DOB NOW | Standpipe | Signed-off | Bletsas P&H | 01/07/2026 |
| DOB NOW | Sprinklers | Signed-off | Bletsas P&H | 01/06/2026 |
| DOB NOW | Plumbing | Signed-off | Flint Mechanical | 01/06/2026 |
| DOB NOW | General Construction | Permit Issued | Broadway Builders | 12/16/2025 |
| DOB NOW | Curb Cut | Signed-off | Let It Grow | 11/06/2025 |
| DOB NOW | Boiler Equipment | Signed-off | Abilene | 10/02/2025 |
| DOB NOW | Suspended Scaffold | Signed-off | Elm Suspension Systems | 09/25/2025 |
| DOB NOW | Structural | Signed-off | Broadway Builders | 08/11/2025 |
| DOB NOW | General Construction | Permit Issued | Broadway Builders | 08/11/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | Core Scaffold Systems | 07/11/2025 |
| DOB NOW | Construction Fence | Signed-off | Core Scaffold Systems | 07/11/2025 |
| DOB NOW | Supported Scaffold | Signed-off | DHS Fraco | 05/29/2025 |
| DOB NOW | Sidewalk Shed | Signed-off | DHS Fraco | 05/29/2025 |
| DOB NOW | Sprinklers | Signed-off | Aura Plumbing | 12/31/2024 |
| DOB NOW | Standpipe | Signed-off | Aura Plumbing | 12/31/2024 |
| DOB NOW | Standpipe | Signed-off | Aura Plumbing | 12/31/2024 |
| DOB NOW | Plumbing | Signed-off | Panili Plumbing & Heating | 12/30/2024 |
| DOB NOW | Plumbing | Signed-off | Panili Plumbing & Heating | 12/30/2024 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | Dynamic Hoisting Scaff | 12/09/2024 |
| DOB NOW | Mechanical Systems | Signed-off | SC Prime Energy | 11/22/2024 |
| DOB NOW | Plumbing | Signed-off | Bletsas Plumbing & Heating | 11/14/2024 |
| DOB NOW | Plumbing | Signed-off | Bletsas Plumbing & Heating | 11/14/2024 |
| DOB NOW | Construction Fence | Permit Issued | Fisher Installations | 10/07/2024 |
| DOB NOW | General Construction | Permit Issued | Broadway Builders | 08/13/2024 |
| DOB NOW | Structural | Signed-off | Broadway Builders | 08/12/2024 |
| DOB NOW | Supported Scaffold | Signed-off | Dynamic Hoisting Scaff | 08/06/2024 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | Dynamic Hoisting Scaff | 08/06/2024 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | Core Scaffold Systems | 07/18/2024 |
| DOB NOW | Construction Fence | Signed-off | Core Scaffold Systems | 07/15/2024 |
| DOB NOW | Standpipe | Signed-off | Bletsas Plumbing & Heating | 07/12/2024 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | Dynamic Hoisting Scaff | 06/03/2024 |
| DOB NOW | Supported Scaffold | Signed-off | Dynamic Hoisting Scaff | 06/03/2024 |
| DOB NOW | Sidewalk Shed | Signed-off | DHS Fraco | 05/29/2024 |
| DOB NOW | Supported Scaffold | Signed-off | DHS Fraco | 05/28/2024 |
| DOB NOW | Mechanical Systems | Signed-off | Broadway Builders | 05/07/2024 |
| DOB NOW | Standpipe | Signed-off | Bletsas Plumbing & Heating | 01/04/2024 |
| DOB NOW | Sprinklers | Signed-off | Bletsas Plumbing & Heating | 01/04/2024 |
| DOB NOW | Construction Fence | Signed-off | Fisher Installations | 12/05/2023 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 07/17/2026 | Permit Issued | Broadway Builders | Air Conditioning Systems, Heating and Air Conditioning Systems, Ventilation Systems | Cooling Mitsubishi Electric TURYP0723AN40AN 72,000 BTU · Condensing Unit ×17 TRUZH0241HA10NA 24,000 BTU · Vrf Indoor ×4 TURYP1203AN40AN 120,000 BTU · Vrf Outdoor ×4 NTXMSM48A182AA 48,000 BTU · Vrf Outdoor ×2 TURYP0963AN40AN 96,000 BTU · Vrf Outdoor ×2 TURYP1443AN40AN 264,000 BTU · Vrf Outdoor ×2 — TURYP0723AN40AN 72,000 BTU · Condensing Unit ×1 Heat / Cool Lg ARUM072BTE5 72,000 BTU · Vrf Outdoor ×4 ARUM121BTE5 119,000 BTU · Vrf Outdoor ×2 ARUM144BTE5 144,000 BTU · Vrf Outdoor ×2 Ventilation Energywall U-ERV-2400 2,305 CFM · Doas ×6 Lg ARND203DCR4 1,800 CFM · Vrf Indoor ×2 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/17/2026 | Signed-off | Bletsas P&H | Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/25/2026 | Cancelled | Sigma Electric | General Wiring |
| 02/27/2026 | Complete | Eastern Electrical Construction | — |
| 05/24/2024 | Complete | Nycom Electrical | — |
| 03/27/2024 | Complete | Sigma Electric | General Wiring |
| 01/03/2023 | Complete | Nash Electric Services | — |
| 10/07/2021 | Complete | P & M Elect'l Contracting | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/17/2026 | Signed-off | Bletsas P&H | 1 scope_items |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/15/2024 | Signed-off | Core Scaffold Systems | Fence |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/16/2026 | Signed-off | Elm Suspension Systems | Suspended Scaffold (SC) |
| 02/27/2026 | Signed-off | Elm Suspension Systems | Suspended Scaffold (SC) |
| Date | Type | Result | Report |
|---|---|---|---|
| 05/05/2026 | Pass-Final Curb Cut Non-Directive 14 | Pass | View ↗ |
| 02/11/2026 | Certified Sprinkler (SP) - Booster Pump Test | Certified | View ↗ |
| 01/05/2026 | Pass-Final Boiler Equipment Inspection | Pass | View ↗ |
| 12/05/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 11/18/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 11/18/2025 | Certified StandPipe-SD-Fixtures-Finish-SD | Certified | View ↗ |
| 11/14/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 11/14/2025 | Certified StandPipe - SD - Alarm Sys 64/09 - Finish | Certified | View ↗ |
| 11/14/2025 | Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet) | Certified | View ↗ |
| 11/13/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 11/13/2025 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 02/28/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 10/11/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 11/27/2023 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| 11/27/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 06/10/2026 | Post-installed Anchors | Michael Lombardo | special |
| 03/11/2026 | Insulation placement and R values | JOHN MCMONAGLE | energy_progress |
| 03/11/2026 | Fenestration air leakage | JOHN MCMONAGLE | energy_progress |
| 03/11/2026 | Air barrier - visual inspection | JOHN MCMONAGLE | energy_progress |
| 03/11/2026 | Metering | JOHN MCMONAGLE | energy_progress |
| 03/11/2026 | Maintenance information | JOHN MCMONAGLE | energy_progress |
| 03/11/2026 | Lighting controls | JOHN MCMONAGLE | energy_progress |
| 03/11/2026 | Fire-Resistance Rated Construction | JOHN MCMONAGLE | progress |
| 03/11/2026 | Energy Code Compliance Inspections | JOHN MCMONAGLE | progress |
| 03/11/2026 | Structural Stability – Alterations of existing buildings | JOHN MCMONAGLE | special |
| 03/11/2026 | Sprayed fire-resistant materials | JOHN MCMONAGLE | special |
| 03/11/2026 | Exterior lighting power | JOHN MCMONAGLE | energy_progress |
| 03/11/2026 | Fenestration and door U-factor and product ratings | JOHN MCMONAGLE | energy_progress |
| 03/11/2026 | Fenestration areas | JOHN MCMONAGLE | energy_progress |
| 03/11/2026 | Vestibules | JOHN MCMONAGLE | energy_progress |
| 03/11/2026 | Mastic and Intumescent Fire-resistant Coatings | JOHN MCMONAGLE | special |
| 03/11/2026 | Masonry | JOHN MCMONAGLE | special |
| 03/11/2026 | Fire-Resistant Penetrations and Joints | JOHN MCMONAGLE | special |
| 03/11/2026 | Exterior Insulation and Finish Systems (EIFS) | JOHN MCMONAGLE | special |
| 03/11/2026 | Protection of exposed foundation insulation | JOHN MCMONAGLE | energy_progress |
| 03/02/2026 | Post-installed Anchors | Michael Lombardo | special |
| 01/20/2026 | Fire-Resistant Penetrations and Joints | JOHN MCMONAGLE | special |
| 01/20/2026 | Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation | JOHN MCMONAGLE | special |
| 01/06/2026 | Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation | JOHN MCMONAGLE | special |
| 01/06/2026 | Fire-Resistant Penetrations and Joints | JOHN MCMONAGLE | special |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Project Renewal | Community Facility | Cellar, Sub-basement, Basement, Floors 1–4, Roof | Project B00587567 |