DOB06/03/2021FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
DOB04/05/2019VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST
DOB01/03/2017VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
DOB12/01/2016VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2015 INSPECTION/TEST
DOB10/01/2012VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2011 INSPECTION/TEST
DOB01/01/2009V-DOB VIOLATION - ACTIVE
DOB03/18/1993V-DOB VIOLATION - ACTIVE
ECB03/15/2007USE OR INSTALLATION OF PLUMBING MATERIALS OR EQUIPMENT WHICH DO NOT COMPLY W/RS-16.LOCATION:LAUNDRY ROOM(BASEMENT)OBSERVED NON-COMPLYING FLEXIBLE GAS CONNECTORS ON COMMERCIAL USE DRYERS.REMEDY:REMOVE NON-COMPLYNothing owed — awaiting certificate of correction
ECB03/15/2007FAILURE TO PROVIDE A SYSTEM OF AUTOMATIC SPRINKLERS WHERE REQUIRED.LOCATION:LAUNDRY ROOM(BASEMENT)HAS 3 COMMERCIAL USE DRYERS & N SYSTEM OF AUTOMATIC SPRINKLERS.REMEDY:PROVIDE A SYSTEM OF AUTOMATIC SPRINKLERSNothing owed — awaiting certificate of correction
ECB02/11/200450A,9A,36,50B. 50A- FLU PIPE BREECHING IS NOT SUPPORTED ABOVE BOILER. (9A) PROVIDE D.O.B WITH R-1 FORM FOR WELDED REPAIR 36- PROVIDE PROOF OF 900A FORM FOR REGISTRATION OF BOILER 50B- WATER LINES IS BEING SUPPONothing owed — awaiting certificate of correction
ECB04/01/200350A,50B,50C,36,9-A,8-C,(50A) FLUE PIPE BREECHING IS NOT STRUCTURAL SUPPORT(50B)DISCHARGE PIPING ON SAFETY VALVES ARE NOT SUPPORTED ABOVE BOILER AND HAS COME IN CONTACT WITH BOILER (36)PROVIDE PROOF OF 900A FORMNothing owed — awaiting certificate of correction