Roof6p · 4 filings · 20 docs
ArchitectureEquipmentGeneralMechanicalStructural
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS SEE ATTACHED PLANS Designated Primary Site supervisor: Nicholas Kagios, Special Rigger # 7720:
On file for this project
2 documents · 1 drawing sheet
REPLACEMENT OF MAIN ROOF, BULKHEAD ROOFS, SETBACK ROOFS, AND TERRACE ROOF. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents · 4 drawing sheets
MECHANICAL MODIFICATIONS AS PER PLANS (AC UPGRADE AND INSTALLATION OF THE COOLING TOWER AND RELATED EQUIPMENT ON THE ROOF). NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
16 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 232p · 1 filing · 16 docs
Mechanical
MECHANICAL MODIFICATIONS AS PER PLANS (AC UPGRADE AND INSTALLATION OF THE COOLING TOWER AND RELATED EQUIPMENT ON THE ROOF). NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
16 documents · 2 drawing sheets
Floor 22
Floor 21
Floor 20
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 141p · 1 filing · 8 docs
Electrical
GENERAL CONSTRUCTION - INTERIOR RENOVATION OF EXISTING OFFICES ON 14TH AND 15TH FLOORS AS INDICATED ON PLANS
On file for this project
8 documents · 1 drawing sheet
Floor 13
Floor 12
Floor 11
Floor 1013p · 3 filings · 9 docs
ArchitectureDMElectricalGeneralMechanical
Issued Permit Scope
General Construction · Mechanical Systems
GENERAL CONSTRUCTION WORK - INCLUDING INTERIOR NON-STRUCTURAL DEMOLITION AND INTEIOR RENOVATION AND FINISHES ON 9TH AND 10TH FLOOR AS INDICATED ON PLANS.
On file for this project
2 documents · 3 drawing sheets
MECHANICAL DUCT WORK ON 9TH AND 10TH FLOORS AS INDICATED ON PLANS.
On file for this project
4 documents · 1 drawing sheet
REMOVAL OF SPECIFIED GLASS PARTITIONS, DOOR FRAMES, DOORS AND WALLS. REMOVAL OF EXISTING ACOUSTIC DROPPED CEILING AND FLOORING THROUGHOUT. INSTALLATION OF NEW GLASS PARTITIONS, DOORS AND SPECIFIC WALLS. INSTALLING NEW ACOUSTIBUILT DROPPED CEILING.
On file for this project
3 documents
Floor 920p · 2 filings · 6 docs
ArchitectureDMMechanical
Issued Permit Scope
General Construction · Mechanical Systems
GENERAL CONSTRUCTION WORK - INCLUDING INTERIOR NON-STRUCTURAL DEMOLITION AND INTEIOR RENOVATION AND FINISHES ON 9TH AND 10TH FLOOR AS INDICATED ON PLANS.
On file for this project
2 documents · 3 drawing sheets
MECHANICAL DUCT WORK ON 9TH AND 10TH FLOORS AS INDICATED ON PLANS.
On file for this project
4 documents · 2 drawing sheets
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 34p · 3 filings · 20 docs
Fire ProtectionMechanicalStructural
Issued Permit Scope
Mechanical Systems · Sprinklers
STRUCTURAL WORK AS INDICATED ON PLANS FILED HEREWITH.
On file for this project
20 documents · 1 drawing sheet
MECHANICAL MODIFICATIONS AS PER PLANS (3RD FLOOR - DIOR RENOVATION). NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
SPRINKLER MODIFICATIONS AS PER PLANS (3RD FLOOR - DIOR RENOVATION). NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents · 1 drawing sheet
Floor 212p · 3 filings · 20 docs
Fire ProtectionMechanicalStructural
Issued Permit Scope
Mechanical Systems
INSTALLATIOIN OF TEMPORARY CORE SPRINKLER PROTECTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents · 1 drawing sheet
STRUCTURAL WORK AS INDICATED ON PLANS FILED HEREWITH.
On file for this project
20 documents · 2 drawing sheets
INTERIOR MECHANICAL WORK INCLUDING DUCTS AND UNITS AS INDICATED ON PLANS FILEDHEREWITH
On file for this project
24 documents
Floor 112p · 3 filings · 20 docs
Fire ProtectionMechanicalStructural
Issued Permit Scope
Mechanical Systems
INTERIOR SPRINKLER MODIFICATIONS INCLUDING REMOVAL OF EXISTING SPRINKLER HEADS AND INSTALLATION OF NEW SPRINKLER HEADS ON ASSOCIATED PIPING, AS SHOWN ON PLANS FILED HEREWITH
On file for this project
4 documents · 1 drawing sheet
STRUCTURAL WORK AS INDICATED ON PLANS FILED HEREWITH.
On file for this project
20 documents · 2 drawing sheets
INTERIOR MECHANICAL WORK INCLUDING DUCTS AND UNITS AS INDICATED ON PLANS FILEDHEREWITH
On file for this project
24 documents
Cellar41p · 11 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
Mechanical Systems
FACADE RENOVATION WORK AS SHOWN ON PLANS FIED HEREWITH. FACADE RENOVATION FLOORS: GROUND (1ST), 002
On file for this project
13 documents · 1 drawing sheet
INTERIOR RENOVATION AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE OF USE, EGRESS OR OCCUPANCY ON THIS APPLICATION.
On file for this project
7 documents · 6 drawing sheets
INTERIOR STRUCTURAL WORK INCLUDING NEW STEEL FRAMING AND REINFORCEMENT OF EXISTING FRAMING, PARTIAL DEMOLITION, SLAB OPENINGS AND INFILLS, AS INDICATED ON PLANS.
On file for this project
19 documents · 10 drawing sheets
Latest 3 of 8 filings on this floor.