← Back
Walk-up cooperative
19 EAST 73 STREET
MANHATTAN · Upper East Side-Carnegie Hill · BIN 1041526
💬 Discuss this project
1871Year Built
6Stories
C6Building Class
R8BZoning
10,239 sfGross Floor Area
6Units
Rent Stabilized14 Open Violations ▸
Walk-up cooperative · Owner of record: 19 E 73 OWNERS CORP · 2,043 sf lot · 5.01 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 4 docs
Floor 45p · 2 filings · 13 docs
Floor 34p · 2 filings · 18 docs
Floor 2
Floor 1Under Construction3p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
19 E 73 OWNERS CORP203/22/2026
19 E 73 ST OWNERS CORP. A103/22/2026
19 EAST 73RD STREET603/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J. CALLAHAN CONSULTING, INC.303/21/2026
ZEN CONSTRUCTION CONSULTING603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
REMODELING SPACE NY LLCGeneral Contractor1007/08/2026
MZZ RENOVATION CORPGeneral Contractor207/08/2026
TOUGH STALLION LLCElectrical103/21/2026
ORBIT SPRINKLER CORPFire Protection106/28/2026
AMN PLUMBING CORPPlumbing107/08/2026
BARTOSZ PTAKElectrical103/21/2026
ORBIT PLBG & HTG INCPlumbing107/08/2026
BIRNBAUM, ALANElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CHARLOTTE DEWALD ARCHITEC7939208/26/2026
KENDALL ENGINEERING PC4154102/25/2026
RYAN SPECIAL ENGINEERING2018302/08/2024
BLUE SKY DESIGN, INC.1908108/21/2023
Building Lifecycle
All (100)Filed (10)Permit Issued (9)Signed Off (3)Violation (38)Inspection (8)Objection (14)Special Inspection (18)
08/26/2026
Filed — Alteration CO
interior renovation and conversion of an existing doctors office residential apartment on the 1st floor . scopes of work, including architectural/construction, plumbing and sprinkler system
M01284775-P1
08/13/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Charlotte Dewald
06/22/2026
Permit issued — Sprinklers
M01355994-I1-EW-SP
05/04/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/08/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/03/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/02/2026
Permit issued — General Construction
M01284775-I1-GC
02/25/2026
Filed — Alteration
M01355994-I1
02/10/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/05/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/08/2026
Permit issued — Plumbing
M01286332-I1-PL
12/29/2025
Permit issued — General Construction
M01284775-I1-GC
12/11/2025
Objection resolved — Addressed
12/11/2025
Objection resolved — Addressed
10/14/2025
Objection raised — Admin
10/14/2025
Objection raised — Admin
10/10/2025
Filed — Alteration CO
interior renovation and conversion of an existing doctors office residential apartment on the 1st floor . scopes of work, including architectural/construction, plumbing and sprinkler system
M01284775-I1
10/10/2025
Filed — Alteration
In conjunction with renovation on the 1st floor apartment, plumbing work only
M01286332-I1
10/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Charlotte Dewald
11/22/2024
Signed off — Alteration
Plumbing work in conjunction with interior renovation of Apt. 3/4.
M00907979-I1
11/22/2024
Signed off — Alteration
General construction and combination of existing class "A" apartments as per TPPN 3-97. No change of use, egress or occupancy under this application.
M00907973-I1
11/12/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/04/2024
Signed off — Alteration
Mechanical system installed at Apt. 3/4. No change of use, egress or occupancy under this application. Associate General Construction application filed under M00907973-I1 approved on 9/15/23.
M00908966-I1
07/01/2024
Permit issued — General Construction
M00907973-I1-GC
05/03/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/09/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Ryan
02/09/2024
Special inspection requirement — Energy Code Compliance Inspections
RENAN PIERRE
02/09/2024
Special inspection requirement — Energy Code Compliance Inspections
RENAN PIERRE
02/09/2024
Special inspection requirement — Lighting controls
RENAN PIERRE
02/09/2024
Special inspection requirement — Lighting in dwelling units
RENAN PIERRE
02/09/2024
Special inspection requirement — Final
RENAN PIERRE
02/08/2024
Filed — Alteration
Plumbing work in conjunction with interior renovation of Apt. 3/4.
M00907979-P1
02/08/2024
Filed — Alteration
General construction and combination of existing class "A" apartments as per TPPN 3-97. No change of use, egress or occupancy under this application.
M00907973-P1
12/07/2023
Special inspection requirement — Lighting in dwelling units
RENAN PIERRE
12/07/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Ryan
12/07/2023
Special inspection requirement — Energy Code Compliance Inspections
RENAN PIERRE
12/07/2023
Special inspection requirement — Final
RENAN PIERRE
12/07/2023
Special inspection requirement — Lighting controls
RENAN PIERRE
12/04/2023
Permit issued — Plumbing
M00907979-I1-PL
12/04/2023
Permit issued — Structural
M00908964-I1-ST
12/01/2023
Permit issued — Mechanical Systems
M00908966-I1-MS
12/01/2023
Permit issued — General Construction
M00907973-I1-GC
09/18/2023
Objection resolved — Addressed
09/16/2023
Objection resolved — Addressed
09/06/2023
Objection resolved — Addressed
09/06/2023
Objection resolved — Addressed
09/06/2023
Objection resolved — Addressed
08/23/2023
Objection raised — Inspections
08/23/2023
Objection raised — Admin
08/23/2023
Objection raised — Fire_Protection
08/22/2023
Objection raised — Scope
08/22/2023
Objection raised — Scope
08/21/2023
Filed — Alteration
Mechanical system installed at Apt. 3/4. No change of use, egress or occupancy under this application. Associate General Construction application filed under M00907973-I1 approved on 9/15/23.
M00908966-I1
08/21/2023
Filed — Alteration
Structural work in conjunction with interior renovation at Apt. 3/4.
M00908964-I1
08/21/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
ANDREW RENFROE
08/21/2023
Special inspection requirement — Structural Wood Frame
ANDREW RENFROE
08/21/2023
Special inspection requirement — Structural Steel - Welding
ANDREW RENFROE
08/21/2023
Special inspection requirement — Structural Steel - Details
ANDREW RENFROE
08/18/2023
Filed — Alteration
Plumbing work in conjunction with interior renovation of Apt. 3/4.
M00907979-I1
Latest 60 of 100 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offORBIT SPRINKLER CORP06/22/2026
DOB NOWGeneral ConstructionPermit IssuedMZZ RENOVATION CORP03/02/2026
DOB NOWPlumbingPermit IssuedORBIT PLBG & HTG INC01/08/2026
DOB NOWGeneral ConstructionPermit IssuedMZZ RENOVATION CORP12/29/2025
DOB NOWGeneral ConstructionSigned-offREMODELING SPACE NY LLC07/01/2024
DOB NOWPlumbingSigned-offAMN PLUMBING CORP12/04/2023
DOB NOWStructuralPermit IssuedREMODELING SPACE NY LLC12/04/2023
DOB NOWMechanical SystemsSigned-offREMODELING SPACE NY LLC12/01/2023
DOB NOWGeneral ConstructionSigned-offREMODELING SPACE NY LLC12/01/2023
BISOTISSUEDZEBE INC06/05/2009
BISEQISSUED167 RIVERSIDE INC03/02/2006
BISOTISSUED1671 SAWMILL RIVER ROAD01/20/2006
BISOTISSUEDFIRST WALL CONSTRUCTION12/06/2004
BISPLISSUEDJUMPER P&H GEN CONTR INC10/29/1998
BISBLISSUEDJUMPER P&H GEN CONTR INC10/29/1998
1 project · most recent 10/10/2025
Water/Sanitary
FiledStatusContractorScope
10/10/2025Permit IssuedORBIT PLBG & HTG INCWater/Sanitary
3 projects · most recent 01/02/2026
General Wiring
FiledStatusContractorScope
01/02/2026CompleteNY CITY ELECTRIC INCGeneral Wiring
11/18/2024CompleteTRIPLE D ELECTRIC INCGeneral Wiring
10/18/2023CompleteFSM ELECTRICAL CORPORATIOGeneral Wiring
1 project · most recent 08/21/2023
Steel
FiledStatusContractorScope
08/21/2023Permit IssuedREMODELING SPACE NY LLCSteel
1 project · most recent 08/26/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
08/26/2026Permit IssuedMZZ RENOVATION CORPTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
08/13/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/04/2026Pass-Final CND-Occupancy InspectionPassView ↗
04/08/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/03/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/10/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/05/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/12/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/03/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
06/30/2026Fire-Resistant Penetrations and JointsCharlotte Dewaldspecial
10/02/2025Fire-Resistant Penetrations and JointsCharlotte Dewaldspecial
02/09/2024Fire-Resistant Penetrations and JointsWilliam Ryanspecial
02/09/2024Energy Code Compliance InspectionsRENAN PIERREprogress
02/09/2024Energy Code Compliance InspectionsRENAN PIERREprogress
02/09/2024Lighting controlsRENAN PIERREenergy_progress
02/09/2024Lighting in dwelling unitsRENAN PIERREenergy_progress
02/09/2024FinalRENAN PIERREprogress
12/07/2023Lighting in dwelling unitsRENAN PIERREenergy_progress
12/07/2023Fire-Resistant Penetrations and JointsWilliam Ryanspecial
12/07/2023Energy Code Compliance InspectionsRENAN PIERREprogress
12/07/2023FinalRENAN PIERREprogress
12/07/2023Lighting controlsRENAN PIERREenergy_progress
08/21/2023Structural Stability – Alterations of existing buildingsANDREW RENFROEspecial
08/21/2023Structural Wood FrameANDREW RENFROEprogress
08/21/2023Structural Steel - WeldingANDREW RENFROEspecial
08/21/2023Structural Steel - DetailsANDREW RENFROEspecial
07/24/2023FinalANDREW RENFROEprogress
▾Documents — 62 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/29/2026M00907979-I1Request digital key ↗
08/29/2026M00907979-P1Request digital key ↗
08/29/2026M00908966-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits9
▸DOB NOWLPC Approval/Permit9
08/29/2026M00907979-I1Open ↗
08/21/2026M01284775-P1Open ↗
08/13/2026M00907973-P1Open ↗
Showing 3 of 9 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026M01284775-I1Open ↗
▸Seals & Professional Certifications27
▸DOB NOWProgress Inspector Seal & Signature11
09/25/2026M00907979-I1Open ↗
09/01/2026M00908964-I1Open ↗
09/01/2026M00908964-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/29/2026M00907979-I1Open ↗
08/29/2026M00908966-I1Open ↗
08/29/2026M00908964-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/23/2026M01284775-P1Open ↗
09/01/2026M00908964-I1Open ↗
09/01/2026M00908964-I1Open ↗
Showing 3 of 7 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/21/2026M01284775-P1Open ↗
08/13/2026M01284775-I1Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/29/2026M00907979-I1Open ↗
08/29/2026M00908966-I1Open ↗
08/29/2026M00908964-I1Open ↗
Showing 3 of 9 on file for this type
▸Other Documents5
▸DOB NOWProof of Historic Building3
08/21/2026M01284775-P1Open ↗
08/13/2026M01286332-I1Open ↗
08/13/2026M01284775-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/21/2026M01284775-I1Open ↗
08/21/2026M01284775-P1Open ↗