← Back
BuildNYC
Elevator cooperative
19 EAST 95TH STREET
MANHATTAN · BIN 1047424
💬 Discuss this project
1925Year Built
6Stories
D4Building Class
R8BZoning
16,800 sfGross Floor Area
13Units
Rent Stabilized1 Active Violation 0 unresolved · 1 paperwork only 1 old, status unconfirmed ▸FISP: SWARMP
Elevator cooperative · Owner of record: 17 East 95th Street Tenants · 3,523 sf lot · 4.77 FAR built · Flood zone X
Locations of Work
ArchitectureEquipment
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Site & exteriorHeavy duty sidewalk shed1p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
17-19 East 95th St Tenants1703/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Green Design109/05/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Atlantic Building Supply203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Brown & Simpson ElectricalElectrical203/21/2026
Fusion ElectricElectrical103/21/2026
Exo IndustriesScaffold107/08/2026
Building Lifecycle
All (26)Filed (1)Permit Issued (1)Signed Off (1)Facade (FISP) (14)Violation (8)Special Inspection (1)
12/18/2024
Cycle 9 facade report signed — SWARMP
12/12/2024
Cycle 9 facade inspection completed
11/08/2024
Violation issued (ECB, closed)
Construction
09/27/2024
Cycle 9 facade report submitted
04/11/2024
Violation issued (ECB, open)
Local Law
02/22/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/01/2021
Violation issued (HPD, closed)
A
02/04/2019
Cycle 8 facade report signed — SAFE
01/22/2019
Cycle 8 facade report submitted
01/10/2019
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE.
M00076907-I1
12/21/2018
Cycle 8 facade inspection completed
10/30/2018
Violation issued (ECB, closed)
Construction
09/11/2018
Permit issued — Sidewalk Shed
M00076907-I1-SH
09/05/2018
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE.
M00076907-I1
09/05/2018
Special inspection requirement — Final
BRIAN T. O'CONNOR
01/21/2018
Cycle 8 facade report signed — SWARMP
12/08/2017
Cycle 8 facade inspection completed
10/04/2017
Cycle 8 facade report submitted
08/10/2012
Cycle 7 facade report submitted
08/06/2012
Cycle 7 facade report signed — SAFE
07/10/2012
Cycle 7 facade inspection completed
08/02/2007
Cycle 6 facade report submitted
01/23/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/21/2006
Cycle 6 facade report submitted
12/27/2000
Violation issued (ECB, closed)
Elevators
09/01/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offExo Industries09/11/2018
BISOTISSUEDH & D Maintenance Co02/11/2019
BISPLISSUEDG.bassolino Plumbing02/11/2019
BISPLISSUEDAbr Plumbing & Heating Contracting08/06/2007
BISOTISSUEDFanuka04/25/2007
BISOTISSUEDBulado General Contractor04/10/2007
BISEQISSUEDRockledge Scaffold04/06/2007
BISPLISSUEDPractical Plumbing & Heating01/26/2007
BISOTISSUEDFanuka12/19/2006
BISPLISSUEDOrbit Plumbing & Heating06/27/2005
BISMHISSUEDPaul P. Construction06/15/2005
3 projects · most recent 03/29/2022
General Wiring
FiledStatusContractorScope
03/29/2022CompleteFusion Electric—
03/01/2022CompleteFusion ElectricGeneral Wiring
09/05/2018CompleteRichard Neu—
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
09/05/2018FinalBRIAN T. O'CONNORprogress
▾Documents — 31 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
09/06/2026M00076907-I1Request digital key ↗
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION3
06/05/2019140830974Open ↗
06/03/2019140830974Open ↗
02/08/2019140830974Open ↗
▸BISWORK PERMIT APPLICATION2
02/08/2019140830974Open ↗
02/08/2019140830974Open ↗
▸Seals & Professional Certifications5
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
02/08/2019140830974Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
02/08/2019140830974Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
02/08/2019140830974Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
09/06/2026M00076907-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/02/2026M00076907-I1Open ↗
▸Trade Schedules & Equipment3
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
06/05/2019140830974Open ↗
06/03/2019140830974Open ↗
▸BISSCHEDULE B - PLUMBING1
02/08/2019140830974Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
02/08/2019140830974Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
02/08/2019140830974Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
02/08/2019140830974Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
06/09/2021140830974Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
02/08/2019140830974Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
06/09/2021140830974Open ↗
02/08/2019140830974Open ↗
▸Approvals, Objections & Sign-offs4
▸BISLETTERS - SUPPORTING DOCUMENTATION1
02/08/2019140830974Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
06/11/2021140830974Open ↗
▸BISLANDMARKS SIGNOFF1
06/09/2021140830974Open ↗
▸BISLANDMARKS APPROVAL1
02/08/2019140830974Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
02/08/2019140830974Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
06/09/2021140830974Open ↗
▸Filing & Intake Forms4
▸BISADDITIONAL INFORMATION2
06/06/2019140830974Open ↗
06/03/2019140830974Open ↗
▸BISBOROUGH INTAKE FORM1
06/03/2019140830974Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
02/08/2019140830974Open ↗