← Back
One story - permanent living quarter
19 EASTMAN STREET
STATEN ISLAND · BIN 5068898
💬 Discuss this project
1965Year Built
1Stories
A2Building Class
R1-2Zoning
1,056 sfGross Floor Area
1Units
One story - permanent living quarter · 4,000 sf lot · 0.26 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JAMES A CLANCY203/28/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARC DESIGN AND CONSULTING LLC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FICAZZOLA CONSULTING LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JAMES A CLANCY9176203/28/2025
Building Lifecycle
All (9)Filed (2)Permit Issued (1)Signed Off (1)Special Inspection (5)
04/15/2025
Signed off — Alteration
INSTALLATION OF PV SYSTEM ON EXISTING ROOF TOP. NO CHANGES TO THE USE EGRESS OR OCCUPANCY.
S01178064-I1
03/28/2025
Filed — Alteration
INSTALLATION OF PV SYSTEM ON EXISTING ROOF TOP. NO CHANGES TO THE USE EGRESS OR OCCUPANCY.
S01178064-P1
03/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
James Clancy
03/28/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
James Clancy
03/28/2025
Special inspection requirement — Energy Code Compliance Inspections
James Clancy
03/28/2025
Special inspection requirement — Final
James Clancy
03/28/2025
Special inspection requirement — Air barrier - visual inspection
James Clancy
02/12/2025
Permit issued — Solar
S01178064-I1-SL
02/07/2025
Filed — Alteration
INSTALLATION OF PV SYSTEM ON EXISTING ROOF TOP. NO CHANGES TO THE USE EGRESS OR OCCUPANCY.
S01178064-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offFICAZZOLA CONSULTING02/12/2025
2 projects · most recent 11/01/2025
General Wiring
FiledStatusContractorScope
11/01/2025Permit IssuedA ELECTRICAL MAIN SVC INCGeneral Wiring
02/04/2025CompleteAMBER ELECTL CONTNG INC—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
03/28/2025Fire-Resistant Penetrations and JointsJames Clancyspecial
03/28/2025Structural Stability – Alterations of existing buildingsJames Clancyspecial
03/28/2025Energy Code Compliance InspectionsJames Clancyprogress
03/28/2025FinalJames Clancyprogress
03/28/2025Air barrier - visual inspectionJames Clancyenergy_progress
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/19/2026S01178064-P1Request digital key ↗
08/19/2026S01178064-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026S01178064-P1Open ↗
08/13/2026S01178064-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026S01178064-P1Open ↗
09/01/2026S01178064-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/01/2026S01178064-P1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026S01178064-P1Open ↗
08/13/2026S01178064-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01178064-I1Open ↗