← Back
Walk-up cooperative
19 FISKE PLACE
BROOKLYN · BIN 3024922
💬 Discuss this project
1923Year Built
5Stories
C6Building Class
R7BZoning
16,350 sfGross Floor Area
20Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Walk-up cooperative · Owner of record: 19 FISKE PLACE HOUSING CORP · 4,464 sf lot · 3.66 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 25p · 2 filings · 14 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CHOICE NY MGMT109/09/2026
19 FISKE PLACE HOUSING3207/08/2026
19 FISKE HOUSING203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHEUNG SHOWMAN ARCHITECTS108/05/2026
THRESHOLD OFFICE204/11/2025
KELLEY DESIGN306/05/2024
M JUST ARCHITECTURE PC202/07/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PROGENY MANAGEMENT & EXPEDITING SER603/21/2026
JUST ARCHITECTURE203/21/2026
NEXUS CONSULTING NYC, INC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FREDD & H CONSTRUCION CORGeneral Contractor303/21/2026
I & I BUILDERS CORPGeneral Contractor303/21/2026
718 DESIGN PRO INCGeneral Contractor109/09/2026
GAUDIOSO CONTRACTING INCGeneral Contractor107/08/2026
JBJ CONCRETE RENOVATIONSGeneral Contractor104/09/2026
ARCO PLBG AND HTG INCPlumbing107/08/2026
DPH PLUMBING & HTG CORPPlumbing107/08/2026
VINCENT LOMBARDOZZIElectrical103/21/2026
SIGNORE & SONS PLBG CORPPlumbing107/08/2026
ARANDA, MANUELFire Protection103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NS ENGINEERING & CONSULTI3652204/11/2025
ERIK SUN, ARCHITECT, PLLC3010206/05/2024
LAURIA ASSOCIATES7570202/07/2024
Building Lifecycle
All (94)Filed (8)Permit Issued (8)Signed Off (6)Violation (8)Inspection (11)Objection (32)Special Inspection (21)
09/08/2026
Permit issued — General Construction
B01440535-I1-GC
08/25/2026
Objection resolved — Addressed
08/24/2026
Objection raised — Other
08/05/2026
Filed — Alteration
IN UNIT E3 ON FLOOR 3, REMOVAL AND INSTALLATION OF KITCHEN CABINETRY AND REMOVAL OF GAS RANGE AND INSTALLATION OF ELECTRIC RANGE AS SHOWN ON PLANS. SEE LAA PERMIT FOR ALL PLUMBING WORK. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
B01440535-I1
08/04/2026
Special inspection requirement — Final
Esther Cheung
04/30/2026
Signed off — Alteration
PLUMBING MODIFICATIONS TO BATHROOM IN UNIT E2 AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01193777-I1
04/30/2026
Signed off — Alteration
PLUMBING MODIFICATIONS TO BATHROOM IN UNIT E2 AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01193777-S1
04/21/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/15/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/08/2025
Permit issued — Plumbing
B01193777-S1-PL
07/01/2025
Permit issued — General Construction
B01193777-I1-GC
06/17/2025
Objection resolved — Addressed
05/19/2025
Objection resolved — Addressed
05/19/2025
Objection resolved — Addressed
04/29/2025
Objection resolved — Addressed
04/29/2025
Objection resolved — Addressed
04/25/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
04/24/2025
Objection raised — Other
04/24/2025
Objection raised — Other
04/24/2025
Objection raised — Other
04/24/2025
Objection raised — Other
04/24/2025
Objection raised — Other
04/11/2025
Filed — Alteration
PLUMBING MODIFICATIONS TO BATHROOM IN UNIT E2 AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01193777-I1
04/11/2025
Filed — Alteration
PLUMBING MODIFICATIONS TO BATHROOM IN UNIT E2 AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01193777-S1
03/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARI MOTWANI
03/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARI MOTWANI
03/12/2025
Special inspection requirement — Final
LAUREN MCCLELLAN
10/02/2024
Signed off — Alteration
Plumbing work at 2nd floor apt. #B3 indicated on drawings filed herewith. No change in Use Egress or Occupancy under this application.
B00965466-I1
10/01/2024
Signed off — Alteration
General construction work to renovate apt #B3 at 2nd floor indicated on drawings filed herewith. No change in Use Egress or Occupancy under this application.
B00965452-I1
09/17/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/10/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/29/2024
Signed off — Alteration
RENOVATION OF KITCHEN AND BATHROOM, ADDITION OF POWDER ROOM AND RELOCATION OF LAUNDRY. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
B00951542-I1
06/14/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/05/2024
Filed — Alteration
RENOVATION OF KITCHEN AND BATHROOM, ADDITION OF POWDER ROOM AND RELOCATION OF LAUNDRY. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
B00951542-P1
06/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ERIK SUN
06/03/2024
Signed off — Alteration
RENOVATION OF KITCHEN & BATHROOM WITH ADDITION OF POWDER ROOM AND MINOR PARTITION WORK. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
B00951541-I1
05/20/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/15/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/19/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/19/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/26/2024
Permit issued — Plumbing
B00965466-I1-PL
03/26/2024
Permit issued — General Construction
B00965452-I1-GC
03/05/2024
Violation issued (ECB, closed)
Unknown
02/29/2024
Objection resolved — Addressed
02/21/2024
Objection resolved — Addressed
02/21/2024
Objection resolved — Addressed
02/15/2024
Objection resolved — Addressed
02/09/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/08/2024
Objection raised — Scope
02/08/2024
Objection raised — Fire_Protection
02/08/2024
Objection raised — Scope
02/08/2024
Objection raised — Admin
02/07/2024
Filed — Alteration
Plumbing work at 2nd floor apt. #B3 indicated on drawings filed herewith. No change in Use Egress or Occupancy under this application.
B00965466-I1
02/07/2024
Filed — Alteration
General construction work to renovate apt #B3 at 2nd floor indicated on drawings filed herewith. No change in Use Egress or Occupancy under this application.
B00965452-I1
02/07/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
EDWARD LAURIA
02/07/2024
Special inspection requirement — Fenestration air leakage
EDWARD LAURIA
02/07/2024
Special inspection requirement — Air barrier - visual inspection
EDWARD LAURIA
02/07/2024
Special inspection requirement — Fenestration areas
EDWARD LAURIA
01/25/2024
Permit issued — Plumbing
B00951542-I1-PL
01/16/2024
Permit issued — General Construction
B00951541-I1-GC
Latest 60 of 94 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-off718 DESIGN PRO INC09/08/2026
DOB NOWPlumbingSigned-offARCO PLBG AND HTG INC07/08/2025
DOB NOWGeneral ConstructionSigned-offJBJ CONCRETE RENOVATIONS07/01/2025
DOB NOWPlumbingSigned-offSIGNORE & SONS PLBG CORP03/26/2024
DOB NOWGeneral ConstructionSigned-offFREDD & H CONSTRUCION COR03/26/2024
DOB NOWPlumbingSigned-offDPH PLUMBING & HTG CORP01/25/2024
DOB NOWGeneral ConstructionSigned-offI & I BUILDERS CORP01/16/2024
DOB NOWGeneral ConstructionSigned-offGAUDIOSO CONTRACTING01/03/2024
BISOTISSUEDHAYDEN BLDG. MAINTENANCE04/16/2015
BISPLISSUEDARANDA PLBG & HTG CORP01/23/2015
BISOTISSUEDGALINDO CONSTRUCTION CORP01/14/2015
BISPLISSUEDARANDA PLBG & HTG CORP11/12/2014
BISOTISSUEDGALINDO CONSTRUCTION CORP10/28/2014
BISPLISSUEDA+ INSTALL CORP07/19/2006
BISBLISSUEDBAY RIDGE FUEL CORP07/19/2006
BISOTISSUEDMAINLAND PLG & HTG INC04/11/2002
BISPLISSUEDMAJOR PLUMBING & HEATING11/19/1998
3 projects · most recent 03/19/2024
General Wiring
FiledStatusContractorScope
03/19/2024CompleteNAS ELECTRIC CORPGeneral Wiring
03/19/2024CompleteTECHNICAL ELECTRIC CORPGeneral Wiring
12/05/2021CompleteEMCO ELECTRIC SVCS LLCGeneral Wiring
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
04/21/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/15/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/25/2025Fail-Final General Construction Non-Directive 14FailView ↗
09/17/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/10/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/14/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/20/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/15/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/19/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/19/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/09/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
08/04/2026FinalEsther Cheungprogress
03/12/2025Fire-Resistant Penetrations and JointsNARI MOTWANIspecial
03/12/2025Fire-Resistant Penetrations and JointsNARI MOTWANIspecial
03/12/2025FinalLAUREN MCCLELLANprogress
06/04/2024Fire-Resistant Penetrations and JointsERIK SUNspecial
02/07/2024Fenestration and door U-factor and product ratingsEDWARD LAURIAenergy_progress
02/07/2024Fenestration air leakageEDWARD LAURIAenergy_progress
02/07/2024Air barrier - visual inspectionEDWARD LAURIAenergy_progress
02/07/2024Fenestration areasEDWARD LAURIAenergy_progress
11/20/2023MeteringEDWARD LAURIAenergy_progress
11/20/2023Lighting in dwelling unitsEDWARD LAURIAenergy_progress
11/20/2023HVAC-R and service water piping design and insulationEDWARD LAURIAenergy_progress
11/20/2023Fire-Resistant Penetrations and JointsEDWARD LAURIAspecial
11/20/2023Energy Code Compliance InspectionsEDWARD LAURIAprogress
11/20/2023Fire-Resistance Rated ConstructionEDWARD LAURIAprogress
11/20/2023FinalEDWARD LAURIAprogress
11/20/2023Fire-Resistant Penetrations and JointsEDWARD LAURIAspecial
11/20/2023Tenant Protection Plan ComplianceEDWARD LAURIAspecial
11/20/2023Energy Code Compliance InspectionsEDWARD LAURIAprogress
10/23/2023Lighting in dwelling unitsBeth Kelleyenergy_progress
10/23/2023FinalBeth Kelleyprogress
▾Documents — 102 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/26/2026B00951541-I1Request digital key ↗
08/26/2026B00951542-I1Request digital key ↗
08/26/2026B00951542-P1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits20
▸BISPLAN / WORK APPROVAL APPLICATION8
07/27/2015340212184Open ↗
07/09/2015321067402Open ↗
07/07/2015321010080Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWLPC Approval/Permit7
09/28/2026B01440535-I1Open ↗
08/13/2026B00951542-I1Open ↗
08/13/2026B00951541-I1Open ↗
Showing 3 of 7 on file for this type
▸BISWORK PERMIT APPLICATION5
04/20/2015321067402Open ↗
01/26/2015340212184Open ↗
01/14/2015340212184Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications30
▸DOB NOWProgress Inspector Seal & Signature8
08/25/2026B01193777-I1Open ↗
08/22/2026B00951541-I1Open ↗
08/22/2026B00951541-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/26/2026B00951541-I1Open ↗
08/26/2026B00951542-I1Open ↗
08/26/2026B00951542-P1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
11/06/2015340212184Open ↗
10/23/2015340212184Open ↗
09/02/2015321010080Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/28/2026B01193777-S1Open ↗
08/28/2026B00951542-P1Open ↗
08/25/2026B01193777-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
12/24/2014321067402Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
12/24/2014321067402Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
12/05/2014340212184Open ↗
▸Trade Schedules & Equipment8
▸BISSELF-CERT PLUMBING NOTICE3
08/13/2015321010080Open ↗
05/08/2015321010080Open ↗
04/29/2015340212184Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
07/07/2015321010080Open ↗
05/19/2015340212184Open ↗
10/09/2014321010080Open ↗
▸BISSCHEDULE B - PLUMBING2
06/18/2015340212184Open ↗
12/05/2014340212184Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/26/2026B00951541-I1Open ↗
08/26/2026B00951542-P1Open ↗
08/26/2026B00951542-I1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
12/05/2014340212184Open ↗
10/09/2014321010080Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
11/06/2015340212184Open ↗
10/23/2015340212184Open ↗
09/02/2015321010080Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
10/23/2015340212184Open ↗
09/02/2015321010080Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
12/05/2014340212184Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
12/05/2014340212184Open ↗
▸Approvals, Objections & Sign-offs8
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
11/06/2015340212184Open ↗
10/23/2015340212184Open ↗
09/02/2015321010080Open ↗
▸BISLANDMARKS APPROVAL3
10/23/2015340212184Open ↗
12/24/2014321067402Open ↗
12/05/2014340212184Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
12/24/2014321067402Open ↗
10/09/2014321010080Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
10/23/2015340212184Open ↗
09/02/2015321010080Open ↗
12/24/2014321067402Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms4
▸BISEFILING COVER SHEET2
12/24/2014321067402Open ↗
10/09/2014321010080Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
12/05/2014340212184Open ↗
▸BISADDITIONAL INFORMATION1
05/27/2015340212184Open ↗
▸Other Documents1
▸DOB NOWProof of Historic Building1
08/13/2026B01193777-I1Open ↗