← Back
BuildNYC
Walk-up cooperative
19 KINGSLAND AVENUE
BROOKLYN · BIN 3070195
💬 Discuss this project
1920Year Built
3Stories
C6Building Class
R6BZoning
5,616 sfGross Floor Area
6Units
Rent Stabilized91 Active Violations 89 unresolved · 2 paperwork only 6 likely answered ▸FDNY Report ↗
Walk-up cooperative · Owner of record: Neighborhood Restore Housing Development Fund · 2,600 sf lot · 2.16 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofStaircase bulkhead construction2 filings · 6 docs
Floor 32 filings · 4 docs
Floor 22 filings · 4 docs
Floor 1Unit 13 filings · 6 docs
Cellar2 filings · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
St Nicks Alliance603/21/2026
Neighborhood Restore H.D.F.C.303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
McHenery Testing Lab107/15/2026
Meltzer/Mandl Architects312/16/2024
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Metric Consulting1803202/08/2024
Building Lifecycle
09/22/2026
Boiler inspection report filed
Initial · no defects · Accepted
07/15/2026
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01431171-I1
11/04/2025
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE CRACKED GLASS PANE AT BUILDING ENTRANCE DOOR AT PUBLIC HALL, 1st STORY
HPD violation · open
11/04/2025
§ 27-2005 ADM code paint metal in accordance with dept. Regulation cornice at building front
HPD violation · closed
10/28/2025
§ 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE 1st ROOM FROM NORTH LOCATED AT APT 2R, 2nd STORY, 2nd APARTMENT FROM…
HPD violation · open
109 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Nothing on file for this building.
1 project · most recent 02/08/2024
Gas Water/Sanitary
FiledStatusContractorScope
02/08/2024——Gas, Water/Sanitary
1 project · most recent 07/15/2026
Sidewalk Shed
FiledStatusContractorScope
07/15/2026——Sidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
12/16/2024Air barrier - visual inspection—energy_progress
11/21/2024Energy Code Compliance Inspections—progress
11/20/2024Tenant Protection Plan Compliance—special
11/20/2024Masonry—special
11/14/2024Final—progress
02/05/2024Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
02/05/2024Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
02/05/2024Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
02/05/2024HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
10 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account