2012Year Built
2Stories
A3Building Class
R1-2Zoning
2,520 sfGross Floor Area
1Units
Large suburban residence · 7,711 sf lot · 0.33 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OAK DEVELOPMENT203/21/2026
OAK DEVELOPERS203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ROGERS CALVANICO GROUP PLLC605/04/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LARGIME MUJOVIC103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CHESTER BUILDERS CORPGeneral Contractor1007/08/2026
AQUATECH MECH,PLBG & ELECElectrical103/22/2026
KCM PLUMBING & HEATING COPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738104/28/2021
Building Lifecycle
All (36)Filed (6)Permit Issued (5)Signed Off (3)Inspection (7)Special Inspection (15)
08/07/2023
Signed off — Alteration
INSTALLATION OF NATURAL GAS GENERATOR AND POOL HEATER ACCESSORY TO RESIDENCE. ELECTRICIAN TO FILE WITH THE NYCDOB BEC FOR RELATED ELECTRICAL WORK.
S00442210-I1
07/31/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/20/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/16/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/04/2023
Filed — Alteration
INSTALLATION OF NATURAL GAS GENERATOR AND POOL HEATER ACCESSORY TO RESIDENCE. ELECTRICIAN TO FILE WITH THE NYCDOB BEC FOR RELATED ELECTRICAL WORK.
S00442210-P3
04/21/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/04/2023
Filed — Alteration
INSTALLATION OF NATURAL GAS GENERATOR AND POOL HEATER ACCESSORY TO RESIDENCE. ELECTRICIAN TO FILE WITH THE NYCDOB BEC FOR RELATED ELECTRICAL WORK.
S00442210-P2
03/24/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/03/2023
Permit issued — Plumbing
S00442210-I1-PL
10/20/2022
Signed off — Alteration
S00500969-I1
10/20/2022
Signed off — Alteration
S00500969-S1
10/19/2022
Inspection — Pass-Final Fence Non-Directive 14
Pass
View inspection ↗
10/17/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
06/27/2022
Permit issued — Foundation
S00500969-I1-GC-CX
05/31/2022
Permit issued — Structural
S00500969-I1-GC-CX
03/22/2022
Permit issued — Construction Fence
S00500969-S1-FN
03/17/2022
Filed — Alteration
S00500969-S1
02/26/2022
Permit issued — Foundation
S00500969-I1-GC-CX
12/01/2021
Filed — Alteration
INSTALLATION OF NATURAL GAS GENERATOR AND POOL HEATER ACCESSORY TO RESIDENCE. ELECTRICIAN TO FILE WITH THE NYCDOB BEC FOR RELATED ELECTRICAL WORK.
S00442210-P1
04/28/2021
Filed — Alteration
S00500969-I1
04/09/2021
Special inspection requirement — Concrete - Cast-In-Place
anthony santoro
04/09/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
04/09/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
anthony santoro
04/09/2021
Special inspection requirement — Subgrade Inspections
anthony santoro
04/09/2021
Special inspection requirement — Final
anthony santoro
04/09/2021
Special inspection requirement — Footing and Foundation
anthony santoro
04/09/2021
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
04/09/2021
Special inspection requirement — Fire-Resistance Rated Construction
anthony santoro
04/09/2021
Special inspection requirement — Structural Wood Frame
anthony santoro
04/09/2021
Special inspection requirement — Fenestration air leakage
anthony santoro
04/09/2021
Special inspection requirement — Fenestration areas
anthony santoro
04/09/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
anthony santoro
04/09/2021
Special inspection requirement — Insulation placement and R values
anthony santoro
04/09/2021
Special inspection requirement — Air barrier - visual inspection
anthony santoro
04/09/2021
Special inspection requirement — Interior lighting power
anthony santoro
01/25/2021
Filed — Alteration
INSTALLATION OF NATURAL GAS GENERATOR AND POOL HEATER ACCESSORY TO RESIDENCE. ELECTRICIAN TO FILE WITH THE NYCDOB BEC FOR RELATED ELECTRICAL WORK.
S00442210-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offKCM PLUMBING & HEATING CO01/03/2023
DOB NOWFoundationSigned-offCHESTER BUILDERS CORP06/27/2022
DOB NOWStructuralSigned-offCHESTER BUILDERS CORP05/31/2022
DOB NOWConstruction FenceSigned-offCHESTER BUILDERS CORP03/22/2022
DOB NOWFoundationSigned-offCHESTER BUILDERS CORP02/26/2022
BIS—ISSUEDDOMIANA DEVELOPMENT CORP11/14/2012
BISPLISSUEDDUO PLUMBING & HTG CORP.09/18/2012
BISSPISSUEDDUO PLBG. & HTG. CORP09/18/2012
BISPLISSUEDDUO PLUMBING & HTG CORP.07/16/2012
BIS—ISSUEDDOMIANA DEVELOPMENT CORP07/02/2012
2 projects · most recent 02/06/2023
General Wiring
FiledStatusContractorScope
02/06/2023CompleteAQUATECH MECH,PLBG & ELEC1 meters
10/21/2021CompleteKINGS ELECTRIC CO., INC.General Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
07/31/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/20/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/16/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/21/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/24/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/19/2022Pass-Final Fence Non-Directive 14PassView ↗
10/17/2022Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
04/09/2021Concrete - Cast-In-Placeanthony santorospecial
04/09/2021Fire-Resistant Penetrations and Jointsanthony santorospecial
04/09/2021Structural Stability – Alterations of existing buildingsanthony santorospecial
04/09/2021Subgrade Inspectionsanthony santorospecial
04/09/2021Finalanthony santoroprogress
04/09/2021Footing and Foundationanthony santoroprogress
04/09/2021Energy Code Compliance Inspectionsanthony santoroprogress
04/09/2021Fire-Resistance Rated Constructionanthony santoroprogress
04/09/2021Structural Wood Frameanthony santoroprogress
04/09/2021Fenestration air leakageanthony santoroenergy_progress
04/09/2021Fenestration areasanthony santoroenergy_progress
04/09/2021Fenestration and door U-factor and product ratingsanthony santoroenergy_progress
04/09/2021Insulation placement and R valuesanthony santoroenergy_progress
04/09/2021Air barrier - visual inspectionanthony santoroenergy_progress
04/09/2021Interior lighting poweranthony santoroenergy_progress
▾Documents — 86 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch - Plumbing4
08/25/2026S00442210-P3Request digital key ↗
08/25/2026S00442210-I1Request digital key ↗
08/25/2026S00442210-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch2
08/25/2026S00500969-S1Request digital key ↗
08/25/2026S00500969-I1Request digital key ↗
▸Applications & Permits11
▸BISWORK PERMIT APPLICATION6
11/15/2012520096654Open ↗
09/18/2012520106830Open ↗
09/18/2012520106830Open ↗
Showing 3 of 6 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION3
01/16/2013520096654Open ↗
09/28/2012520106830Open ↗
07/02/2012520096654Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
01/04/2013520096654Open ↗
▸BISAFTER-HOUR WORK PERMIT APPLICATION1
07/31/2012520096654Open ↗
▸Zoning, Tax Lot & Property Records4
▸BISTAX LOT- TENTATIVE LOT NUMBER ISSUED2
03/08/2013520096654Open ↗
07/02/2012520096654Open ↗
▸BISZONING DIAGRAM1
07/03/2012520096654Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026S00500969-I1Open ↗
▸Seals & Professional Certifications18
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
02/08/2013520096654Open ↗
01/17/2013520106830Open ↗
09/28/2012520106830Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/25/2026S00500969-I1Open ↗
08/25/2026S00500969-S1Open ↗
08/13/2026S00442210-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/26/2026S00500969-I1Open ↗
08/26/2026S00500969-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
09/28/2012520106830Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
09/28/2012520106830Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/26/2026S00500969-I1Open ↗
▸Trade Schedules & Equipment13
▸BISSELF-CERT PLUMBING NOTICE5
12/18/2012520096654Open ↗
12/18/2012520106830Open ↗
09/26/2012520096654Open ↗
Showing 3 of 5 on file for this type
▸BISSEWER CONNECTION: DEP SD1 & SD23
02/08/2013520096654Open ↗
02/08/2013520096654Open ↗
05/29/2012520096654Open ↗
▸BISSCHEDULE B - PLUMBING2
09/28/2012520106830Open ↗
04/13/2012520096654Open ↗
▸BISWATER METER PERMIT : DEP-METER1
02/08/2013520096654Open ↗
▸BISSPRINKLER INSP REPORT : FP-851
02/08/2013520106830Open ↗
▸BISRPZ/DDCV TEST REPORT : GEN215B1
02/08/2013520106830Open ↗
▸Safety & Tenant Protection6
▸DOB NOWTenant Protection Plan3
08/13/2026S00442210-P3Open ↗
08/13/2026S00442210-P2Open ↗
08/13/2026S00442210-I1Open ↗
▸BISStreet Trees- Receipt of Street Trees Site Plan2
03/08/2013520096654Open ↗
07/02/2012520096654Open ↗
▸BISSTREET TREE CHECKLIST1
04/13/2012520096654Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY2
04/13/2012520096654Open ↗
04/13/2012520096654Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
03/08/2013520096654Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
03/08/2013520096654Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026S00500969-I1Open ↗
▸Inspections & Test Reports5
▸BISHYDRO FLOW TEST LETTER1
09/28/2012520106830Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
07/02/2012520096654Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
07/02/2012520096654Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
09/28/2012520106830Open ↗
▸BISSoils - Investigations (Borings/Test Pits) - 2008 CODE1
07/02/2012520096654Open ↗
▸Approvals, Objections & Sign-offs11
▸BISLETTERS - SUPPORTING DOCUMENTATION3
01/16/2013520096654Open ↗
01/16/2013520096654Open ↗
07/02/2012520096654Open ↗
▸BISBSA-CPC APPROVAL2
07/18/2012520096654Open ↗
05/29/2012520096654Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
03/08/2013520096654Open ↗
02/19/2013520106830Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
09/28/2012520106830Open ↗
04/13/2012520096654Open ↗
▸BISTAP LETTER - DOM SVC : DEP-DOM1
02/08/2013520096654Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
04/13/2012520096654Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
02/19/2013520106830Open ↗
09/28/2012520106830Open ↗
▸Filing & Intake Forms3
▸BISEFILING COVER SHEET2
09/28/2012520106830Open ↗
04/13/2012520096654Open ↗
▸BISADDITIONAL INFORMATION1
01/16/2013520096654Open ↗
▸Other Documents2
▸BISPLOT DIAGRAM1
04/13/2012520096654Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026S00500969-I1Open ↗