← Back
Three families
19 PULASKI STREET
BROOKLYN · Bedford-Stuyvesant (West) · BIN 3348067
💬 Discuss this project
1905Year Built
2Stories
C0Building Class
R6BZoning
2,052 sfGross Floor Area
3Units
Rent Stabilized55 Open Violations ▸FDNY Report ↗
Three families · 1,800 sf lot · 1.14 FAR built · Flood zone X
Locations of Work
Architecture
Floor 31p · 1 filing · 8 docs
Floor 2
Floor 1
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TIDERUNNER ENGINEERING & DESIGN, PC106/17/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ENKAY DESIGN CONSULTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EAST END CONSTRUCTION & RGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LAURIA ASSOCIATES7570106/17/2022
Building Lifecycle
All (75)Filed (1)Permit Issued (1)Signed Off (1)Violation (56)Objection (8)Special Inspection (8)
05/05/2026
Violation issued (HPD, open)
A
11/18/2025
Violation issued (HPD, open)
I
06/10/2025
Violation issued (HPD, open)
A
11/25/2024
Violation issued (HPD, open)
I
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/11/2024
Violation issued (HPD, open)
A
11/17/2023
Violation issued (HPD, open)
I
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/24/2023
Violation issued (HPD, open)
A
11/07/2022
Violation issued (HPD, open)
I
11/04/2022
Signed off — Alteration
REPAIR & RECONSTRUCTION OF EXT'G FIRE-DAMAGED AREAS IN EXTG RESIDENTIAL BLDG, WITH MINOR INTER. & EXTER. WORK. REPLACEMENT INTER. FINISHES. REPLACEMENT OF PORTION OF ROOF FINISH, SKYLIGHTS & WINDOWS AS DAMAGED. NO CHANGE TO USE, EGRESS AND OCCUPANCY.
B00748700-I1
10/26/2022
Permit issued — General Construction
B00748700-I1-GC
08/12/2022
Special inspection requirement — Air barrier - visual inspection
Louis Schwartz
08/12/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
Louis Schwartz
08/12/2022
Special inspection requirement — Fenestration areas
Louis Schwartz
08/05/2022
Objection raised — Energy
08/05/2022
Objection resolved — Addressed
06/29/2022
Objection raised — Scope
06/29/2022
Objection resolved — Addressed
06/29/2022
Objection raised — Other
06/29/2022
Objection resolved — Addressed
06/29/2022
Objection raised — Inspections
06/29/2022
Objection resolved — Addressed
06/17/2022
Filed — Alteration
REPAIR & RECONSTRUCTION OF EXT'G FIRE-DAMAGED AREAS IN EXTG RESIDENTIAL BLDG, WITH MINOR INTER. & EXTER. WORK. REPLACEMENT INTER. FINISHES. REPLACEMENT OF PORTION OF ROOF FINISH, SKYLIGHTS & WINDOWS AS DAMAGED. NO CHANGE TO USE, EGRESS AND OCCUPANCY.
B00748700-I1
06/01/2022
Special inspection requirement — Energy Code Compliance Inspections
Louis Schwartz
06/01/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
EDWARD LAURIA
06/01/2022
Special inspection requirement — Fenestration air leakage
Louis Schwartz
06/01/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
EDWARD LAURIA
06/01/2022
Special inspection requirement — Final
Louis Schwartz
03/01/2022
Violation issued (HPD, open)
I
03/01/2022
Violation issued (HPD, open)
A
05/19/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/12/2021
Violation issued (HPD, open)
A
04/12/2021
Violation issued (HPD, open)
I
11/08/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/31/2019
Violation issued (HPD, open)
I
10/19/2018
Violation issued (HPD, open)
I
04/06/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/28/2017
Violation issued (HPD, open)
I
02/24/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2016
Violation issued (HPD, open)
I
10/13/2015
Violation issued (HPD, open)
I
02/24/2015
Violation issued (HPD, open)
I
12/01/2003
Violation issued (HPD, open)
B
11/06/1996
Violation issued (HPD, closed)
A
08/29/1995
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/25/1994
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/19/1993
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/12/1990
Violation issued (HPD, open)
B
03/12/1990
Violation issued (HPD, open)
B
03/12/1990
Violation issued (HPD, open)
B
03/12/1990
Violation issued (HPD, open)
B
03/12/1990
Violation issued (HPD, open)
B
03/12/1990
Violation issued (HPD, open)
B
03/12/1990
Violation issued (HPD, open)
B
03/12/1990
Violation issued (HPD, open)
A
03/12/1990
Violation issued (HPD, open)
A
03/12/1990
Violation issued (HPD, open)
B
Latest 60 of 75 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offEAST END CONSTRUCTION & R10/26/2022
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
08/12/2022Air barrier - visual inspectionLouis Schwartzenergy_progress
08/12/2022Fenestration and door U-factor and product ratingsLouis Schwartzenergy_progress
08/12/2022Fenestration areasLouis Schwartzenergy_progress
06/01/2022Energy Code Compliance InspectionsLouis Schwartzprogress
06/01/2022Fire-Resistant Penetrations and JointsEDWARD LAURIAspecial
06/01/2022Fenestration air leakageLouis Schwartzenergy_progress
06/01/2022Structural Stability – Alterations of existing buildingsEDWARD LAURIAspecial
06/01/2022FinalLouis Schwartzprogress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/15/2026B00748700-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/27/2026B00748700-I1Open ↗
08/27/2026B00748700-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/27/2026B00748700-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026B00748700-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWHPD-3: Single Room Occupancy Multiple Dwelling (SRO MD) Anti-Harassment Checklist1
08/13/2026B00748700-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B00748700-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00748700-I1Open ↗