← Back
Three families
19 SOUTH ELLIOTT PLACE
BROOKLYN · Fort Greene · BIN 3058799
💬 Discuss this project
1870Year Built
3Stories
C0Building Class
R6BZoning
3,620 sfGross Floor Area
3Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Three families · Owner of record: 19 S ELLIOTT PL., LLC · 2,000 sf lot · 1.81 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof22p · 1 filing · 20 docs
Floor 319p · 1 filing · 20 docs
Floor 218p · 1 filing · 20 docs
Floor 118p · 1 filing · 20 docs
Cellar25p · 1 filing · 20 docs
Basement18p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
19 SOUTH ELLIOTT PLACE2907/08/2026
19 S ELLIOTT PL., LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/04/2022$3.5M—— → —$970/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CELMER ARCHITECTURE PLLC1001/15/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
COMMERCIAL CAPITAL USA2003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KAPLAN HOME IMPROVEMENT CGeneral Contractor1507/08/2026
ORBIT SPRINKLER CORPFire Protection107/08/2026
ORBIT PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SD TESTING & INSPECTION S70101001/15/2025
Building Lifecycle
All (69)Filed (9)Permit Issued (11)Signed Off (3)Violation (8)Inspection (8)Special Inspection (30)
06/10/2025
Violation issued (HPD, closed)
A
04/11/2025
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
01/31/2025
Signed off — Alteration CO
Mechanical systems filed in conjunction with GC B00756616-I1: Including electric, ductless split system
B00756616-S1
01/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIUCHENG LI
01/23/2025
Special inspection requirement — Energy Code Compliance Inspections
XIUCHENG LI
01/23/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
XIUCHENG LI
01/23/2025
Special inspection requirement — Post-installed Anchors
XIUCHENG LI
01/23/2025
Special inspection requirement — Sprinkler Systems
XIUCHENG LI
01/17/2025
Signed off — Alteration CO
Mechanical systems filed in conjunction with GC B00756616-I1: Including electric, ductless split system
B00756616-S2
01/16/2025
Signed off — Alteration CO
Mechanical systems filed in conjunction with GC B00756616-I1: Including electric, ductless split system
B00756616-S3
01/15/2025
Filed — Alteration CO
Mechanical systems filed in conjunction with GC B00756616-I1: Including electric, ductless split system
B00756616-P6
01/13/2025
Special inspection requirement — Sprinkler Systems
XIUCHENG LI
01/13/2025
Special inspection requirement — Post-installed Anchors
XIUCHENG LI
01/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIUCHENG LI
01/13/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
XIUCHENG LI
01/13/2025
Special inspection requirement — Energy Code Compliance Inspections
XIUCHENG LI
12/13/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/27/2024
Violation issued (HPD, closed)
I
10/30/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
XIUCHENG LI
10/30/2024
Special inspection requirement — HVAC-R and service water heating equipment
XIUCHENG LI
10/30/2024
Special inspection requirement — Ventilation and air distribution system
XIUCHENG LI
10/30/2024
Special inspection requirement — Permanent certificate
XIUCHENG LI
10/30/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
XIUCHENG LI
10/30/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIUCHENG LI
10/30/2024
Special inspection requirement — Mechanical Systems
XIUCHENG LI
10/30/2024
Special inspection requirement — Final
XIUCHENG LI
10/30/2024
Special inspection requirement — Energy Code Compliance Inspections
XIUCHENG LI
10/30/2024
Special inspection requirement — Permanent certificate
XIUCHENG LI
10/30/2024
Special inspection requirement — Maintenance information
XIUCHENG LI
10/30/2024
Special inspection requirement — Ventilation and air distribution system
XIUCHENG LI
10/30/2024
Special inspection requirement — HVAC-R and service water heating equipment
XIUCHENG LI
10/30/2024
Special inspection requirement — HVAC-R and service water heating system controls
XIUCHENG LI
10/30/2024
Special inspection requirement — Duct leakage testing, insulation and design
XIUCHENG LI
10/30/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
XIUCHENG LI
10/30/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
10/30/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIUCHENG LI
10/30/2024
Special inspection requirement — Mechanical Systems
XIUCHENG LI
10/30/2024
Special inspection requirement — Energy Code Compliance Inspections
XIUCHENG LI
09/10/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/06/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/04/2024
Filed — Alteration CO
Mechanical systems filed in conjunction with GC B00756616-I1: Including electric, ductless split system
B00756616-P5
08/28/2024
Filed — Alteration CO
Mechanical systems filed in conjunction with GC B00756616-I1: Including electric, ductless split system
B00756616-P3
08/08/2024
Filed — Alteration CO
Mechanical systems filed in conjunction with GC B00756616-I1: Including electric, ductless split system
B00756616-P1
08/08/2024
Filed — Alteration CO
Mechanical systems filed in conjunction with GC B00756616-I1: Including electric, ductless split system
B00756616-P4
04/11/2024
Violation issued (HPD, closed)
A
03/28/2024
Permit issued — General Construction
B00756616-I1-GC
03/28/2024
Permit issued — Mechanical Systems
B00756616-S2-MS
03/28/2024
Permit issued — Structural
B00756616-S3-ST
12/11/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/20/2023
Violation issued (HPD, closed)
I
11/08/2023
Permit issued — Structural
B00756616-S3-ST
11/08/2023
Permit issued — Mechanical Systems
B00756616-S2-MS
11/08/2023
Permit issued — General Construction
B00756616-I1-GC
11/02/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/31/2023
Permit issued — Plumbing
B00756616-S1-EW-SP
08/09/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/07/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/18/2023
Permit issued — General Construction
B00756616-I1-GC
04/18/2023
Permit issued — Structural
B00756616-S3-ST
04/18/2023
Permit issued — Mechanical Systems
B00756616-S2-MS
Latest 60 of 69 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedKAPLAN HOME IMPROVEMENT C03/28/2024
DOB NOWMechanical SystemsSigned-offKAPLAN HOME IMPROVEMENT C03/28/2024
DOB NOWStructuralSigned-offKAPLAN HOME IMPROVEMENT C03/28/2024
DOB NOWStructuralSigned-offKAPLAN HOME IMPROVEMENT C11/08/2023
DOB NOWMechanical SystemsSigned-offKAPLAN HOME IMPROVEMENT C11/08/2023
DOB NOWGeneral ConstructionPermit IssuedKAPLAN HOME IMPROVEMENT C11/08/2023
DOB NOWPlumbingSigned-offORBIT SPRINKLER CORP10/31/2023
DOB NOWGeneral ConstructionPermit IssuedKAPLAN HOME IMPROVEMENT C04/18/2023
DOB NOWStructuralSigned-offKAPLAN HOME IMPROVEMENT C04/18/2023
DOB NOWMechanical SystemsSigned-offKAPLAN HOME IMPROVEMENT C04/18/2023
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC04/18/2023
BISPLISSUEDJOHN HLAD PLUMBING & HEATING06/28/1994
BIS—ISSUEDDORF CONSTRUCTION CORP.05/31/1994
1 project · most recent 01/15/2025
Associated Ducts and Piping Heating and Air Conditioning Systems Others Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
01/15/2025Permit IssuedKAPLAN HOME IMPROVEMENT CAssociated Ducts and Piping, Heating and Air Conditioning Systems, Others, Ventilation Systems
Heat / Cool
Mitsubishi Electric MXZ-SM48NAMHZ 48,000 BTU · Rooftop Unit ×3
Ventilation
Greenheck SP-A110 75 CFM · Exhaust Fan ×6
CUBE-100HP-4 250 CFM · Kitchen Exhaust ×2
SP-A90 100 CFM · Exhaust Fan ×2
Ducts & Piping
Anemostat S15H0 100 CFM · Ductwork ×1
Other
Qmark sed2024 2 kW · Electric Heater ×6
1 project · most recent 04/19/2023
General Wiring
FiledStatusContractorScope
04/19/2023CompleteFSM ELECTRICAL CORPORATIOGeneral Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
04/11/2025Fail-Final Curb Cut Non-Directive 14FailView ↗
12/13/2024Pass-Final CND-Occupancy InspectionPassView ↗
09/10/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/06/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/11/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/02/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/09/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/07/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 53
DateRequirementInspectorRole
01/23/2025Fire-Resistant Penetrations and JointsXIUCHENG LIspecial
01/23/2025Energy Code Compliance InspectionsXIUCHENG LIprogress
01/23/2025HVAC-R and service water piping design and insulationXIUCHENG LIenergy_progress
01/23/2025Post-installed AnchorsXIUCHENG LIspecial
01/23/2025Sprinkler SystemsXIUCHENG LIspecial
01/13/2025Sprinkler SystemsXIUCHENG LIspecial
01/13/2025Post-installed AnchorsXIUCHENG LIspecial
01/13/2025Fire-Resistant Penetrations and JointsXIUCHENG LIspecial
01/13/2025HVAC-R and service water piping design and insulationXIUCHENG LIenergy_progress
01/13/2025Energy Code Compliance InspectionsXIUCHENG LIprogress
10/30/2024HVAC-R and service water piping design and insulationXIUCHENG LIenergy_progress
10/30/2024HVAC-R and service water heating equipmentXIUCHENG LIenergy_progress
10/30/2024Ventilation and air distribution systemXIUCHENG LIenergy_progress
10/30/2024Permanent certificateXIUCHENG LIenergy_progress
10/30/2024Structural Stability – Alterations of existing buildingsXIUCHENG LIspecial
10/30/2024Fire-Resistant Penetrations and JointsXIUCHENG LIspecial
10/30/2024Mechanical SystemsXIUCHENG LIspecial
10/30/2024FinalXIUCHENG LIprogress
10/30/2024Energy Code Compliance InspectionsXIUCHENG LIprogress
10/30/2024Permanent certificateXIUCHENG LIenergy_progress
10/30/2024Maintenance informationXIUCHENG LIenergy_progress
10/30/2024Ventilation and air distribution systemXIUCHENG LIenergy_progress
10/30/2024HVAC-R and service water heating equipmentXIUCHENG LIenergy_progress
10/30/2024HVAC-R and service water heating system controlsXIUCHENG LIenergy_progress
10/30/2024Duct leakage testing, insulation and designXIUCHENG LIenergy_progress
Latest 25 of 53.
▾Documents — 77 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/24/2026B00756616-I1Request digital key ↗
08/24/2026B00756616-P6Request digital key ↗
08/24/2026B00756616-P5Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits13
▸DOB NOWLPC Approval/Permit10
08/13/2026B00756616-S2Open ↗
08/13/2026B00756616-I1Open ↗
08/13/2026B00756616-P1Open ↗
Showing 3 of 10 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION2
10/07/2024340867431Open ↗
09/27/2022340867431Open ↗
▸BISBPP-15 - Application for waiver of Builders pavement requirements1
09/27/2022340867431Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00756616-I1Open ↗
▸Seals & Professional Certifications37
▸DOB NOWSpecial Inspector Seal & Signature13
09/27/2026B00756616-P2Open ↗
09/25/2026B00756616-S3Open ↗
09/25/2026B00756616-S3Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/27/2026B00756616-P2Open ↗
09/27/2026B00756616-P2Open ↗
09/25/2026B00756616-S3Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/24/2026B00756616-P1Open ↗
08/24/2026B00756616-P6Open ↗
08/24/2026B00756616-P5Open ↗
Showing 3 of 10 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
09/27/2022340867431Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/27/2022340867431Open ↗
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist2
08/24/2026B00756616-I1Open ↗
08/24/2026B00756616-P3Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00756616-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00756616-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00756616-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/24/2026B00756616-S3Open ↗
08/24/2026B00756616-S2Open ↗
08/24/2026B00756616-S1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00756616-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISLANDMARKS APPROVAL1
09/27/2022340867431Open ↗
▸Filing & Intake Forms2
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
09/27/2022340867431Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
09/27/2022340867431Open ↗
▸Other Documents3
▸DOB NOWProperty Ownership Certification2
08/24/2026B00756616-I1Open ↗
08/24/2026B00756616-P3Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00756616-I1Open ↗