← Back
Three families
19 TOMPKINS PLACE
BROOKLYN · BIN 3004017
💬 Discuss this project
1840Year Built
3Stories
C0Building Class
R6Zoning
3,575 sfGross Floor Area
3Units
Rent Stabilized11 Open Violations ▸
Three families · 2,813 sf lot · 1.27 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof20p · 3 filings · 20 docs
Floor 319p · 1 filing · 20 docs
Floor 223p · 2 filings · 20 docs
Floor 121p · 2 filings · 20 docs
Cellar67p · 3 filings · 20 docs
Basement62p · 1 filing · 20 docs
2 jobs · most recent 11/15/2023
General Wiring
FiledStatusContractorScope
11/15/2023CompleteM F ELEC'L SVC CO., INCGeneral Wiring
02/09/2023CompleteSOLAS ELECTRICAL CORP—
Building Lifecycle
All (102)Filed (21)Permit Issued (18)Signed Off (12)Violation (13)Inspection (8)Special Inspection (30)
05/06/2026
Violation issued (HPD, open)
A
01/29/2026
Signed off — Alteration CO
B00668083-I1
11/20/2025
Violation issued (HPD, open)
I
07/29/2025
Signed off — Alteration CO
B00668083-S3
07/25/2025
Signed off — Alteration
B00666610-I1
07/25/2025
Permit issued — Foundation
B00668083-S3-FO
07/23/2025
Signed off — Alteration CO
B00668083-S4
07/17/2025
Signed off — Alteration CO
B00668083-S2
07/17/2025
Signed off — Alteration CO
B00668083-S1
07/01/2025
Signed off — Alteration
INSTALLATION OF SPRINKLER SYSTEM.
B00734579-I1
06/11/2025
Violation issued (HPD, open)
A
05/15/2025
Signed off — Alteration
INSTALLATION OF NEW HVAC SYSTEMS.
B00734502-I1
05/15/2025
Signed off — Alteration
INSTALLATION OF PLUMBING SYSTEM AND FIXTURES.
B00734577-I1
05/09/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Devin Mills
12/26/2024
Special inspection requirement — Fenestration areas
Devin Mills
12/26/2024
Special inspection requirement — Fenestration air leakage
Devin Mills
12/26/2024
Special inspection requirement — Interior lighting power
Devin Mills
12/26/2024
Special inspection requirement — Insulation placement and R values
Devin Mills
12/26/2024
Special inspection requirement — Maintenance information
Devin Mills
12/26/2024
Special inspection requirement — Air barrier - visual inspection
Devin Mills
12/26/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Devin Mills
12/26/2024
Special inspection requirement — Permanent certificate
Devin Mills
12/26/2024
Special inspection requirement — Fire-Resistance Rated Construction
Devin Mills
12/26/2024
Special inspection requirement — Energy Code Compliance Inspections
Devin Mills
12/13/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
12/04/2024
Signed off — Alteration
installation of temporary constructionfence
B00737074-I1
11/29/2024
Violation issued (HPD, open)
I
06/12/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/30/2024
Filed — Alteration CO
B00668083-P5
04/25/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/12/2024
Violation issued (HPD, open)
A
04/05/2024
Permit issued — Sprinklers
B00734579-I1-EW-SP
11/30/2023
Special inspection requirement — Mechanical Systems
NICHOLAS AZADIAN
11/30/2023
Special inspection requirement — Final
NICHOLAS AZADIAN
11/30/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
NICHOLAS AZADIAN
11/30/2023
Special inspection requirement — HVAC-R and service water heating equipment
NICHOLAS AZADIAN
11/30/2023
Special inspection requirement — HVAC-R and service water heating system controls
NICHOLAS AZADIAN
11/22/2023
Violation issued (HPD, open)
I
11/13/2023
Filed — Alteration
INSTALLATION OF NEW HVAC SYSTEMS.
B00734502-P1
11/01/2023
Special inspection requirement — Mechanical Systems
NICHOLAS AZADIAN
11/01/2023
Special inspection requirement — Final
NICHOLAS AZADIAN
11/01/2023
Special inspection requirement — HVAC-R and service water heating equipment
NICHOLAS AZADIAN
11/01/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
NICHOLAS AZADIAN
11/01/2023
Special inspection requirement — HVAC-R and service water heating system controls
NICHOLAS AZADIAN
10/16/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00825127-I1
10/16/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00825129-I1
10/16/2023
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
10/16/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
10/05/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
NICHOLAS AZADIAN
10/02/2023
Filed — Alteration
INSTALLATION OF PLUMBING SYSTEM AND FIXTURES.
B00734577-P1
09/22/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
NICHOLAS AZADIAN
07/21/2023
Permit issued — Construction Fence
B00737074-I1-FN
04/29/2023
Permit issued — Foundation
B00668083-S1-FO
04/28/2023
Permit issued — Structural
B00668083-S2-ST
04/21/2023
Permit issued — General Construction
B00668083-I1-GC
04/19/2023
Permit issued — Sprinklers
B00734579-I1-EW-SP
04/04/2023
Permit issued — General Construction
B00666610-I1-GC
03/28/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/27/2023
Violation issued (HPD, open)
A
Latest 60 of 102 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OWNERS REP503/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/14/2021$5.4M—— → —$1,504/sf building
08/27/2019$4.5M—Private party → Private party$1,252/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DEVIN MILLS ARCHITECT1304/30/2024
RAAD511/13/2023
PAUL PERDEK, PROF. ENG. PLLC202/08/2023
SITE SAFETY LLC105/18/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB BUILDING CONSULTING2603/21/2026
AE DESIGN SOLUTION403/21/2026
SITE-SAFETY203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HATCHET WORKS CORPGeneral Contractor2007/08/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor603/21/2026
ASHLAR MECHANICAL CORPFire Protection307/08/2026
ASPECT PLBNG&HTNG CO LLCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DEVIN MILLS ARCHITECT7906204/30/2024
RAAD7727511/13/2023
BILOW ENGINEERING LLC4095302/15/2023
INTEGRITY CONSULTING SERV666510/21/2022
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationSigned-offHATCHET WORKS CORP07/25/2025
DOB NOWSprinklersSigned-offASHLAR MECHANICAL CORP04/05/2024
DOB NOWConstruction FenceSigned-offHATCHET WORKS CORP07/21/2023
DOB NOWFoundationPermit IssuedHATCHET WORKS CORP04/29/2023
DOB NOWStructuralSigned-offHATCHET WORKS CORP04/28/2023
DOB NOWGeneral ConstructionPermit IssuedHATCHET WORKS CORP04/21/2023
DOB NOWSprinklersSigned-offASHLAR MECHANICAL CORP04/19/2023
DOB NOWGeneral ConstructionSigned-offHATCHET WORKS CORP04/04/2023
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC02/08/2023
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC02/08/2023
DOB NOWSupport of ExcavationSigned-offHATCHET WORKS CORP02/02/2023
DOB NOWSprinklersSigned-offASHLAR MECHANICAL CORP01/20/2023
DOB NOWPlumbingSigned-offASPECT PLBNG&HTNG CO LLC12/14/2022
DOB NOWMechanical SystemsSigned-offHATCHET WORKS CORP11/04/2022
DOB NOWStructuralSigned-offHATCHET WORKS CORP08/09/2022
DOB NOWFoundationPermit IssuedHATCHET WORKS CORP08/09/2022
DOB NOWConstruction FenceSigned-offHATCHET WORKS CORP05/19/2022
DOB NOWGeneral ConstructionSigned-offHATCHET WORKS CORP03/16/2022
BIS—ISSUEDAARON REZNY INC07/07/1997
BIS—ISSUEDAARON REZNY INC04/14/1993
BISPLISSUEDJOHN HLAD PLUMBING AND HEATING04/20/1992
BIS—ISSUEDN/A04/14/1992
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
05/09/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/13/2024Fail-Final General Construction Non-Directive 14FailView ↗
06/12/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/25/2024Pass-Final CND-Occupancy InspectionPassView ↗
10/16/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
10/16/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/28/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/09/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 55
DateRequirementInspectorRole
12/26/2024Fire-Resistant Penetrations and JointsDevin Millsspecial
12/26/2024Fenestration areasDevin Millsenergy_progress
12/26/2024Fenestration air leakageDevin Millsenergy_progress
12/26/2024Interior lighting powerDevin Millsenergy_progress
12/26/2024Insulation placement and R valuesDevin Millsenergy_progress
12/26/2024Maintenance informationDevin Millsenergy_progress
12/26/2024Air barrier - visual inspectionDevin Millsenergy_progress
12/26/2024Fenestration and door U-factor and product ratingsDevin Millsenergy_progress
12/26/2024Permanent certificateDevin Millsenergy_progress
12/26/2024Fire-Resistance Rated ConstructionDevin Millsprogress
12/26/2024Energy Code Compliance InspectionsDevin Millsprogress
11/30/2023Mechanical SystemsNICHOLAS AZADIANspecial
11/30/2023FinalNICHOLAS AZADIANprogress
11/30/2023HVAC-R and service water piping design and insulationNICHOLAS AZADIANenergy_progress
11/30/2023HVAC-R and service water heating equipmentNICHOLAS AZADIANenergy_progress
11/30/2023HVAC-R and service water heating system controlsNICHOLAS AZADIANenergy_progress
11/01/2023Mechanical SystemsNICHOLAS AZADIANspecial
11/01/2023FinalNICHOLAS AZADIANprogress
11/01/2023HVAC-R and service water heating equipmentNICHOLAS AZADIANenergy_progress
11/01/2023HVAC-R and service water piping design and insulationNICHOLAS AZADIANenergy_progress
11/01/2023HVAC-R and service water heating system controlsNICHOLAS AZADIANenergy_progress
10/05/2023Fire-Resistant Penetrations and JointsNICHOLAS AZADIANspecial
09/22/2023Fire-Resistant Penetrations and JointsNICHOLAS AZADIANspecial
02/06/2023Structural Stability – Alterations of existing buildingsJONATHAN BILOWspecial
02/06/2023Structural Stability – Alterations of existing buildings—special
Latest 25 of 55.
▾Documents — 119 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch21
08/31/2026B00666610-P2Contact architect ↗
08/31/2026B00666610-I1Contact architect ↗
08/31/2026B00666610-P1Contact architect ↗
Showing 3 of 21 on file for this type
▸Applications & Permits11
▸DOB NOWLPC Approval/Permit11
08/29/2026B00734502-I1Open ↗
08/29/2026B00734577-I1Open ↗
08/29/2026B00734577-P1Open ↗
Showing 3 of 11 on file for this type
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026B00668083-P5Open ↗
08/13/2026B00668083-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026B00668083-P5Open ↗
08/13/2026B00668083-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00668083-I1Open ↗
▸Seals & Professional Certifications43
▸DOB NOWDPL-1: Design Professional Seal & Signature21
08/31/2026B00666610-P1Open ↗
08/31/2026B00666610-I1Open ↗
08/31/2026B00666610-P2Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/02/2026B00734502-I1Open ↗
09/01/2026B00734577-I1Open ↗
09/01/2026B00734579-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/02/2026B00734502-I1Open ↗
09/02/2026B00734502-I1Open ↗
09/01/2026B00734502-P1Open ↗
Showing 3 of 10 on file for this type
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026B00668083-P5Open ↗
08/13/2026B00668083-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/28/2026B00668083-I1Open ↗
08/28/2026B00668083-P5Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form9
08/31/2026B00666610-I1Open ↗
08/29/2026B00734577-I1Open ↗
08/28/2026B00668083-S2Open ↗
Showing 3 of 9 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026B00668083-I1Open ↗
08/13/2026B00734502-I1Open ↗
▸Other Documents24
▸DOB NOWPlot Diagram8
08/13/2026B00668083-P1Open ↗
08/13/2026B00668083-S3Open ↗
08/13/2026B00668083-P4Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProperty Ownership Certification6
08/28/2026B00668083-P5Open ↗
08/28/2026B00668083-S2Open ↗
08/28/2026B00668083-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProof of Historic Building3
08/13/2026B00666610-I1Open ↗
08/13/2026B00666610-P2Open ↗
08/13/2026B00666610-P1Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026B00668083-P5Open ↗
08/13/2026B00668083-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026B00668083-I1Open ↗
08/13/2026B00668083-P5Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00668083-I1Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026B00668083-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00668083-S4Open ↗