Roof13p · 2 filings · 20 docs
PlumbingStructural
Issued Permit Scope
Plumbing · Structural
PLUMBING WORK IN CONJUNCTION WITH ALT-2 INTERIOR RENOVATION. REMOVE, RELOCATE, REPLACE & ADD BATHROOM, KITCHEN & LAUNDRY FIXTURES. ADD EXTERIOR FLOOR DRAINS. BOILERS TO BE REMOVED, EXISTING HOT WATER HEATER & METERS TO REMAIN. HEAT PROVIDED BY MECH SYSTEM
On file for this project
8 documents
INSTALL NEW STEEL POSTS AND STAIR STRINGER AT REAR YARD, ROOF DUNNAGE FOR HVAC, CONSTRUCT OPENINGS AT EAST WALL, CLOSE FLOOR OPENING AT FIRST FLOOR, AND CONSTRUCT BALCONY AND STRUCTURAL FRAMING. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
On file for this project
30 documents · 1 drawing sheet
Floor 351p · 5 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Install new sprinkler system, including sprinkler heads and associated piping along with new 2 incoming combined water service. No change in use, occupancy or egress.
On file for this project
10 documents · 3 drawing sheets
PLUMBING WORK IN CONJUNCTION WITH ALT-2 INTERIOR RENOVATION. REMOVE, RELOCATE, REPLACE & ADD BATHROOM, KITCHEN & LAUNDRY FIXTURES. ADD EXTERIOR FLOOR DRAINS. BOILERS TO BE REMOVED, EXISTING HOT WATER HEATER & METERS TO REMAIN. HEAT PROVIDED BY MECH SYSTEM
On file for this project
8 documents
RENOVATION OF EXISTING CELLAR + BASEMENT + 3 STORY HOUSE. DEMOLITION WORK TO INCLUDE PARTITIONS,MINOR CEILING, WINDOWS AND DOORS. PROPOSED WORK TO INCLUDE NEW PARTITIONS, DOORS AND WINDOWS NEW BULKHEAD AND ROOF DECK. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
On file for this project
30 documents
Latest 3 of 5 filings on this floor.
Floor 253p · 5 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Install new sprinkler system, including sprinkler heads and associated piping along with new 2 incoming combined water service. No change in use, occupancy or egress.
On file for this project
10 documents · 1 drawing sheet
PLUMBING WORK IN CONJUNCTION WITH ALT-2 INTERIOR RENOVATION. REMOVE, RELOCATE, REPLACE & ADD BATHROOM, KITCHEN & LAUNDRY FIXTURES. ADD EXTERIOR FLOOR DRAINS. BOILERS TO BE REMOVED, EXISTING HOT WATER HEATER & METERS TO REMAIN. HEAT PROVIDED BY MECH SYSTEM
On file for this project
8 documents
RENOVATION OF EXISTING CELLAR + BASEMENT + 3 STORY HOUSE. DEMOLITION WORK TO INCLUDE PARTITIONS,MINOR CEILING, WINDOWS AND DOORS. PROPOSED WORK TO INCLUDE NEW PARTITIONS, DOORS AND WINDOWS NEW BULKHEAD AND ROOF DECK. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
On file for this project
30 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 150p · 5 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Install new sprinkler system, including sprinkler heads and associated piping along with new 2 incoming combined water service. No change in use, occupancy or egress.
On file for this project
10 documents
PLUMBING WORK IN CONJUNCTION WITH ALT-2 INTERIOR RENOVATION. REMOVE, RELOCATE, REPLACE & ADD BATHROOM, KITCHEN & LAUNDRY FIXTURES. ADD EXTERIOR FLOOR DRAINS. BOILERS TO BE REMOVED, EXISTING HOT WATER HEATER & METERS TO REMAIN. HEAT PROVIDED BY MECH SYSTEM
On file for this project
8 documents
RENOVATION OF EXISTING CELLAR + BASEMENT + 3 STORY HOUSE. DEMOLITION WORK TO INCLUDE PARTITIONS,MINOR CEILING, WINDOWS AND DOORS. PROPOSED WORK TO INCLUDE NEW PARTITIONS, DOORS AND WINDOWS NEW BULKHEAD AND ROOF DECK. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
On file for this project
30 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Cellar53p · 5 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Install new sprinkler system, including sprinkler heads and associated piping along with new 2 incoming combined water service. No change in use, occupancy or egress.
On file for this project
10 documents · 1 drawing sheet
PLUMBING WORK IN CONJUNCTION WITH ALT-2 INTERIOR RENOVATION. REMOVE, RELOCATE, REPLACE & ADD BATHROOM, KITCHEN & LAUNDRY FIXTURES. ADD EXTERIOR FLOOR DRAINS. BOILERS TO BE REMOVED, EXISTING HOT WATER HEATER & METERS TO REMAIN. HEAT PROVIDED BY MECH SYSTEM
On file for this project
8 documents
RENOVATION OF EXISTING CELLAR + BASEMENT + 3 STORY HOUSE. DEMOLITION WORK TO INCLUDE PARTITIONS,MINOR CEILING, WINDOWS AND DOORS. PROPOSED WORK TO INCLUDE NEW PARTITIONS, DOORS AND WINDOWS NEW BULKHEAD AND ROOF DECK. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
On file for this project
30 documents · 3 drawing sheets
Latest 3 of 5 filings on this floor.
Basement1p · 1 filing · 8 docs
Plumbing
PLUMBING WORK IN CONJUNCTION WITH ALT-2 INTERIOR RENOVATION. REMOVE, RELOCATE, REPLACE & ADD BATHROOM, KITCHEN & LAUNDRY FIXTURES. ADD EXTERIOR FLOOR DRAINS. BOILERS TO BE REMOVED, EXISTING HOT WATER HEATER & METERS TO REMAIN. HEAT PROVIDED BY MECH SYSTEM
On file for this project
8 documents · 1 drawing sheet
Sub-Basement29p · 4 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Structural
Install new sprinkler system, including sprinkler heads and associated piping along with new 2 incoming combined water service. No change in use, occupancy or egress.
On file for this project
10 documents
PLUMBING WORK IN CONJUNCTION WITH ALT-2 INTERIOR RENOVATION. REMOVE, RELOCATE, REPLACE & ADD BATHROOM, KITCHEN & LAUNDRY FIXTURES. ADD EXTERIOR FLOOR DRAINS. BOILERS TO BE REMOVED, EXISTING HOT WATER HEATER & METERS TO REMAIN. HEAT PROVIDED BY MECH SYSTEM
On file for this project
8 documents
NEW AC SYSTEM INCLUDING HYPER HEAT AIR COOLED VARIABLE SPEED HEAT PUMP EQUIPMENT, REFRIGERANT PIPING, CONDENSATE DRAIN PIPING, GALVANIZED SHEET METAL DUCTWORK, DAMPERS, AIR OUTLETS, CONTROLS ETC. NEW EXHAUST SYSTEM FOR BATHROOMS.
On file for this project
4 documents
Latest 3 of 4 filings on this floor.
Site & exterior6p · 2 filings · 4 docs
ArchitectureEquipmentGeneral
Issued Permit Scope
Construction Fence · Sidewalk Shed
TEMPORARY CONSTRUCTION FENCE FILED IN CONJUNCTION WITH ALT-2 RENOVATION (B00518336).
On file for this project
2 documents · 3 drawing sheets
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 3 drawing sheets