Two family converted from one family
190-11 120 AVENUE
QUEENS · St. Albans · BIN 4272539
💬 Discuss this project
1950Year Built
2Stories
B3Building Class
R3AZoning
1,564 sfGross Floor Area
2Units
Two family converted from one family · 4,000 sf lot · 0.39 FAR built · Flood zone X
Locations of Work
ElectricalPlumbingGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction1 filing · 3 docs
Floor 1Under Construction1p · 1 filing · 3 docs
Cellar4p · 1 filing · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
19011 120 AVE103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/17/2014$350K—Private party → Private party$224/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TRINITY SOLAR LLC102/16/2026
WILLIAM OFORI-ATTA204/27/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ACA ASSOCIATES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GLENNS PLUMBING SVCS INCPlumbing307/08/2026
TRINITY SOLAR LLCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BITOPI CONSULTANTS LLC7036102/16/2026
ABEJA ENGINEERING PLLC7269204/27/2021
Building Lifecycle
All (15)Filed (3)Permit Issued (4)Special Inspection (8)
02/19/2026
Permit issued — Solar
Q01360233-I1-SL
02/16/2026
Filed — Alteration
Q01360233-I1
08/13/2021
Permit issued — Plumbing
Q00406035-I1-PL
07/13/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHANN VELEZ
07/13/2021
Special inspection requirement — Maintenance information
JOHANN VELEZ
07/13/2021
Special inspection requirement — HVAC and service water heating equipment
JOHANN VELEZ
07/13/2021
Special inspection requirement — HVAC and service water heating system controls
JOHANN VELEZ
04/27/2021
Filed — Alteration
OIL TO GAS CONVERSION. REMOVE THE EXISTING FORCED AIR SYSTEM AND REPLACE WITH (2) DIRECT VENT NAVIEN COMBO BOILERS WITH HW COIL. INSTALL 30FT OF 1" AND 30'OF 3/4" BLACK PIPE, AND 60' OF 3/4"GAS PIPING. UPGRADE THE (2)GAS METERS FROM OSP FOR THE DIRECT VEN
Q00406035-P1
04/21/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHANN VELEZ
04/21/2021
Special inspection requirement — HVAC and service water heating equipment
JOHANN VELEZ
04/21/2021
Special inspection requirement — HVAC and service water heating system controls
JOHANN VELEZ
04/21/2021
Special inspection requirement — Maintenance information
JOHANN VELEZ
02/22/2021
Permit issued — Plumbing
Q00406035-I1-PL
01/20/2021
Permit issued — Plumbing
Q00406035-I1-PL
10/15/2020
Filed — Alteration
OIL TO GAS CONVERSION. REMOVE THE EXISTING FORCED AIR SYSTEM AND REPLACE WITH (2) DIRECT VENT NAVIEN COMBO BOILERS WITH HW COIL. INSTALL 30FT OF 1" AND 30'OF 3/4" BLACK PIPE, AND 60' OF 3/4"GAS PIPING. UPGRADE THE (2)GAS METERS FROM OSP FOR THE DIRECT VEN
Q00406035-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedTRINITY SOLAR LLC02/19/2026
DOB NOWPlumbingPermit IssuedGLENNS PLUMBING SVCS INC08/13/2021
DOB NOWPlumbingPermit IssuedGLENNS PLUMBING SVCS INC02/22/2021
DOB NOWPlumbingPermit IssuedGLENNS PLUMBING SVCS INC01/20/2021
1 project · most recent 04/27/2021
Gas
FiledStatusContractorScope
04/27/2021Permit IssuedGLENNS PLUMBING SVCS INCGas
2 projects · most recent 02/12/2026
FiledStatusContractorScope
02/12/2026CancelledREDLINE ELECTRIC INC—
04/20/2022CompleteICAS ELECTRICAL SVCS INC3 meters, 1 new_meters
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
07/13/2021Fire-Resistant Penetrations and JointsJOHANN VELEZspecial
07/13/2021Maintenance informationJOHANN VELEZenergy_progress
07/13/2021HVAC and service water heating equipment JOHANN VELEZenergy_progress
07/13/2021HVAC and service water heating system controls JOHANN VELEZenergy_progress
04/21/2021Fire-Resistant Penetrations and JointsJOHANN VELEZspecial
04/21/2021HVAC and service water heating equipment JOHANN VELEZenergy_progress
04/21/2021HVAC and service water heating system controls JOHANN VELEZenergy_progress
04/21/2021Maintenance informationJOHANN VELEZenergy_progress
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch - Plumbing2
08/27/2026Q00406035-I1Request digital key ↗
08/15/2026Q00406035-P1Request digital key ↗
▸DOB NOWPlans/Sketch1
08/17/2026Q01360233-I1Request digital key ↗
▸Seals & Professional Certifications11
▸DOB NOWProgress Inspector Seal & Signature6
09/02/2026Q00406035-I1Open ↗
09/02/2026Q00406035-I1Open ↗
09/02/2026Q00406035-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/13/2026Q00406035-P1Open ↗
08/13/2026Q00406035-I1Open ↗
08/13/2026Q01360233-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/02/2026Q00406035-I1Open ↗
08/25/2026Q00406035-P1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWTenant Protection Plan2
08/13/2026Q00406035-P1Open ↗
08/13/2026Q00406035-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/13/2026Q00406035-P1Open ↗
08/13/2026Q01360233-I1Open ↗
08/13/2026Q00406035-I1Open ↗