Two stories - detached, small or mid-size
190-17 DORMANS ROAD
QUEENS · BIN 4221223
💬 Discuss this project
1930Year Built
2.5Stories
A1Building Class
R2Zoning
1,983 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 4,897 sf lot · 0.4 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC103/25/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN SOLAR ELECTL CORPElectrical103/22/2026
SUNRUN INSTALLATION SVCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272103/25/2025
Building Lifecycle
All (7)Filed (1)Permit Issued (1)Special Inspection (5)
04/01/2025
Permit issued — Solar
Q01197417-I1-SL
03/25/2025
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01197417-I1
03/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
03/19/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
03/19/2025
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
03/19/2025
Special inspection requirement — Final
Walid Abdulla
03/19/2025
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC04/01/2025
1 project · most recent 03/25/2025
General Wiring
FiledStatusContractorScope
03/25/2025CompleteSUNRUN SOLAR ELECTL CORPGeneral Wiring
1 project · most recent 03/25/2025
FiledStatusContractorScope
03/25/2025Signed-offSUNRUN INSTALLATION SVC11 panels, 4.51 kw, 232.32 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
03/19/2025Fire-Resistant Penetrations and JointsWalid Abdullaspecial
03/19/2025Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
03/19/2025Energy Code Compliance InspectionsWalid Abdullaprogress
03/19/2025FinalWalid Abdullaprogress
03/19/2025Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/20/2026Q01197417-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026Q01197417-I1Open ↗
09/01/2026Q01197417-I1Open ↗
09/01/2026Q01197417-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026Q01197417-I1Open ↗
09/01/2026Q01197417-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/20/2026Q01197417-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/20/2026Q01197417-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01197417-I1Open ↗