← Back
Two stories - detached, small or mid-size
190-20 118 AVENUE
QUEENS · St. Albans · BIN 4271481
💬 Discuss this project
1925Year Built
2.5Stories
A1Building Class
R3AZoning
1,248 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 2,500 sf lot · 0.5 FAR built · Flood zone X
Locations of Work
Electrical
Permit Issued — active, not yet Signed-off
RoofUnder Construction2p · 1 filing · 8 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/13/2022$495K—Private party → —$397/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC106/19/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272106/19/2026
Building Lifecycle
All (7)Filed (1)Permit Issued (1)Special Inspection (5)
06/26/2026
Permit issued — Solar
Q01412263-I1-SL
06/19/2026
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01412263-I1
06/19/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
06/19/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
06/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
06/04/2026
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
06/04/2026
Special inspection requirement — Final
Walid Abdulla
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedSUNRUN INSTALLATION SVC06/26/2026
2 projects · most recent 06/26/2026
General Wiring
FiledStatusContractorScope
06/26/2026CompleteCUNNINGHAM ELECTRIC CORPGeneral Wiring
06/18/2026Permit IssuedSUNRUN SOLAR ELECTL CORP—
1 project · most recent 06/19/2026
FiledStatusContractorScope
06/19/2026Permit IssuedSUNRUN INSTALLATION SVC13 panels, 5.85 kw, 273 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
06/19/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
06/19/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
06/04/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
06/04/2026Energy Code Compliance InspectionsWalid Abdullaprogress
06/04/2026FinalWalid Abdullaprogress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/16/2026Q01412263-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/31/2026Q01412263-I1Open ↗
08/31/2026Q01412263-I1Open ↗
08/31/2026Q01412263-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/31/2026Q01412263-I1Open ↗
08/31/2026Q01412263-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/16/2026Q01412263-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/16/2026Q01412263-I1Open ↗