← Back
Two family converted from one family
190-41 111 ROAD
QUEENS · BIN 4234508
💬 Discuss this project
1930Year Built
2.5Stories
B3Building Class
R3XZoning
1,760 sfGross Floor Area
2Units
1 Open Violation ▸FDNY Report ↗
Two family converted from one family · Owner of record: A & J 190 41 111TH ROAD MANAGEMENT · 4,000 sf lot · 0.44 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
A J 19041 111TH ROAD MANAGMENT903/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/09/2020$600K—— → —$341/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DINGS ENGINEERING P.C.307/15/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DINGS ENGINEERING PC603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BAHALS CUSTOM HOMES INCGeneral Contractor203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DINGS ENGINEERING PC2051307/15/2022
Building Lifecycle
All (13)Filed (3)Permit Issued (1)Signed Off (1)Violation (2)Special Inspection (6)
07/25/2022
Signed off — Alteration
TO LEGALIZE EXCAVATION WORK; AND INSTALL 14'X3'-4" 5' DEEP MASONRY STEPS AND A DOOR OPENING TO CELLAR,TO DISMISS DOB VIOLATION V090721C21-01021 VPW 090721C39047055Z, NO CHANGE OF BULK, MAJOR EGRESS, AND USE.
Q00611518-I1
07/15/2022
Filed — Alteration
TO LEGALIZE EXCAVATION WORK; AND INSTALL 14'X3'-4" 5' DEEP MASONRY STEPS AND A DOOR OPENING TO CELLAR,TO DISMISS DOB VIOLATION V090721C21-01021 VPW 090721C39047055Z, NO CHANGE OF BULK, MAJOR EGRESS, AND USE.
Q00611518-P3
07/15/2022
Special inspection requirement — Masonry
Yanqi Ding
07/15/2022
Special inspection requirement — Final
Yanqi Ding
07/15/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
Yanqi Ding
10/27/2021
Permit issued — Earth Work
Q00611518-I1-GC-CX
10/26/2021
Filed — Alteration
TO LEGALIZE EXCAVATION WORK; AND INSTALL 14'X3'-4" 5' DEEP MASONRY STEPS AND A DOOR OPENING TO CELLAR,TO DISMISS DOB VIOLATION V090721C21-01021 VPW 090721C39047055Z, NO CHANGE OF BULK, MAJOR EGRESS, AND USE.
Q00611518-P2
10/25/2021
Special inspection requirement — Final
Yanqi Ding
10/25/2021
Special inspection requirement — Masonry
Yanqi Ding
10/25/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
Yanqi Ding
10/18/2021
Filed — Alteration
TO LEGALIZE EXCAVATION WORK; AND INSTALL 14'X3'-4" 5' DEEP MASONRY STEPS AND A DOOR OPENING TO CELLAR,TO DISMISS DOB VIOLATION V090721C21-01021 VPW 090721C39047055Z, NO CHANGE OF BULK, MAJOR EGRESS, AND USE.
Q00611518-I1
09/07/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/07/2021
Violation issued (DOB, open)
VPW-VIOLATION UNSERVED ECB-WORK WITHOUT PERMIT-ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWEarth WorkSigned-offBAHALS CUSTOM HOMES INC10/27/2021
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
07/15/2022MasonryYanqi Dingspecial
07/15/2022FinalYanqi Dingprogress
07/15/2022Fenestration and door U-factor and product ratingsYanqi Dingenergy_progress
10/25/2021FinalYanqi Dingprogress
10/25/2021MasonryYanqi Dingspecial
10/25/2021Fenestration and door U-factor and product ratingsYanqi Dingenergy_progress
▾Documents — 17 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/26/2026Q00611518-P3Request digital key ↗
08/26/2026Q00611518-I1Request digital key ↗
08/26/2026Q00611518-P2Request digital key ↗
▸Seals & Professional Certifications9
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026Q00611518-I1Open ↗
09/01/2026Q00611518-I1Open ↗
08/22/2026Q00611518-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/13/2026Q00611518-I1Open ↗
08/13/2026Q00611518-P3Open ↗
08/13/2026Q00611518-P2Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026Q00611518-I1Open ↗
08/22/2026Q00611518-P2Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/13/2026Q00611518-P2Open ↗
08/13/2026Q00611518-P3Open ↗
08/13/2026Q00611518-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00611518-I1Open ↗
▸Other Documents1
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00611518-I1Open ↗