← Back
School or academy
190 BEACH 67 STREET
QUEENS · BIN 4623219
💬 Discuss this project
2023Year Built
2Stories
W3Building Class
R6Zoning
36,020 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
School or academy · Owner of record: ARVERNE COMMUNITY CENTER CORP. · 65,073 sf lot · 0.55 FAR built · Flood zone AE
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneralOther
Roof8p · 3 filings · 20 docs
Floor 315p · 4 filings · 20 docs
Floor 216p · 3 filings · 20 docs
Floor 119p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ARVERNE COMMUNITY CENTER GROUP5907/08/2026
ARVERNE COMMUNITY CENTER CORP1603/22/2026
OCEAN WAY 3103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
URBAHN ARCHITECTS602/24/2026
O&S ASSOCIATES1902/10/2026
MAITRA ASSOCIATES303/07/2024
SOLOMON ROSENZWEIG P.E P.C.203/13/2023
YSRAEL A. SEINUK, P.C.103/03/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ROCKAWAY BEACH BLVD CONSTRUCITON6203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RACANELLI CONSTRUCTION COGeneral Contractor807/08/2026
ROCKAWAY BEACH BLVD CON CGeneral Contractor807/08/2026
S & L PLUMBING & HEATINGPlumbing707/08/2026
A & F FIRE PROTECTION COFire Protection407/08/2026
DONNELLY MECHANICAL CORPGeneral Contractor204/09/2026
JD MASTERS PLBG & HTGPlumbing207/08/2026
TF ELECTRICAL CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HARDIE & ASSOCIATES, CONS37602002/10/2026
Z & T ENGINEERING, P.C.591110/29/2025
SOIL MECHANICS DRILLING C2325103/07/2024
SHL ENGINEERING, P.C.6109203/01/2023
Building Lifecycle
All (155)Filed (31)Permit Issued (31)Signed Off (10)Violation (2)Inspection (19)Objection (32)Special Inspection (30)
07/15/2026
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
07/13/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
06/29/2026
Permit issued — Standpipe
Q00352423-I1-PL
05/18/2026
Signed off — Alteration
Filed in conjunction with NB 421961513. Filing for Mechanical work for a new 3 story charter school
Q00354098-I1
04/07/2026
Signed off — Alteration
Herewith filing Fuel Storage in conjunction with NB: 421961513 and Generator Q01239652
Q01245765-I1
04/06/2026
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
03/20/2026
Signed off — Alteration
Installation of New Gas Boiler
Q01321771-S1
03/19/2026
Signed off — Alteration
Installation of New Gas Boiler
Q01321771-I1
03/16/2026
Special inspection requirement — Public Assembly Emergency Lighting
ELLIOTT HARDIE
03/16/2026
Special inspection requirement — Public Assembly Emergency Lighting
ELLIOTT HARDIE
03/05/2026
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
03/02/2026
Signed off — Alteration
Q01239652-I1
02/24/2026
Filed — No Work
Q01216246-P1
02/24/2026
Filed — No Work
Q01216216-P1
02/24/2026
Special inspection requirement — Public Assembly Emergency Lighting
ELLIOTT HARDIE
02/23/2026
Permit issued — Boiler Equipment
Q01321771-S1-BE
02/16/2026
Special inspection requirement — Maintenance information
ELLIOTT HARDIE
02/16/2026
Special inspection requirement — Sprinkler Systems
ELLIOTT HARDIE
02/16/2026
Special inspection requirement — Fire-Resistance Rated Construction
ELLIOTT HARDIE
02/16/2026
Special inspection requirement — HVAC insulation and sealing
ELLIOTT HARDIE
02/16/2026
Special inspection requirement — Standpipe Systems
ELLIOTT HARDIE
02/16/2026
Special inspection requirement — Electrical motors
ELLIOTT HARDIE
02/10/2026
Filed — Alteration
Installation of New Gas Boiler
Q01321771-S1
02/10/2026
Filed — Alteration
Filed in conjunction with NB # 421961513. Filing for Plumbing, Sprinkler and Standpipe for a New 3 Story Charter School.
Q00352423-A2
02/10/2026
Permit issued — Boiler Equipment
Q01245765-I1-BE
02/10/2026
Permit issued — Mechanical Systems
Q01239652-I1-MS
02/10/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Rocco DeFelippis
02/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ELLIOTT HARDIE
02/10/2026
Special inspection requirement — Lowest Floor Elevation
Rocco DeFelippis
02/10/2026
Special inspection requirement — Heating Systems
ELLIOTT HARDIE
02/09/2026
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
02/05/2026
Violation issued (FDNY_ORDER, closed)
02/05/2026
Violation issued (FDNY_ORDER, closed)
02/03/2026
Special inspection requirement — Lowest Floor Elevation
Rocco DeFelippis
02/03/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Rocco DeFelippis
02/03/2026
Special inspection requirement — Heating Systems
ELLIOTT HARDIE
02/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ELLIOTT HARDIE
01/28/2026
Filed — Alteration
Installation of New Gas Boiler
Q01321771-P2
01/23/2026
Signed off — Alteration
The exterior plumbing work includes site water, storm, and sanitary lines from building to the City water and sewer systems. The site storm plumbing work also includes storm water management basins.. Filed in Conjunction with NB # 421961513
Q00827494-I1
01/23/2026
Signed off — Alteration
Q00505068-I1
01/21/2026
Signed off — Alteration
Q00346496-I1
01/13/2026
Filed — Alteration
Installation of New Gas Boiler
Q01321771-P1
01/09/2026
Objection resolved — Addressed
01/07/2026
Objection raised — Fire_Protection
12/29/2025
Permit issued — Boiler Equipment
Q01321771-I1-BE
12/18/2025
Filed — Alteration
Installation of New Gas Boiler
Q01321771-I1
12/17/2025
Filed — Alteration
Filed in conjunction with NB # 421961513. Filing for Plumbing, Sprinkler and Standpipe for a New 3 Story Charter School.
Q00352423-A1
12/15/2025
Special inspection requirement — Standpipe Systems
ELLIOTT HARDIE
12/15/2025
Special inspection requirement — Fire-Resistance Rated Construction
ELLIOTT HARDIE
12/15/2025
Special inspection requirement — Maintenance information
ELLIOTT HARDIE
12/15/2025
Special inspection requirement — Electrical motors
ELLIOTT HARDIE
12/15/2025
Special inspection requirement — Sprinkler Systems
ELLIOTT HARDIE
12/15/2025
Special inspection requirement — HVAC insulation and sealing
ELLIOTT HARDIE
11/18/2025
Filed — Alteration
Filed in conjunction with NB # 421961513. Filing for Plumbing, Sprinkler and Standpipe for a New 3 Story Charter School.
Q00352423-P9
11/17/2025
Special inspection requirement — Fire-Resistance Rated Construction
ELLIOTT HARDIE
11/17/2025
Special inspection requirement — Standpipe Systems
ELLIOTT HARDIE
11/17/2025
Special inspection requirement — Sprinkler Systems
ELLIOTT HARDIE
11/17/2025
Special inspection requirement — Electrical motors
ELLIOTT HARDIE
11/17/2025
Special inspection requirement — HVAC insulation and sealing
ELLIOTT HARDIE
11/17/2025
Special inspection requirement — Maintenance information
ELLIOTT HARDIE
Latest 60 of 155 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStandpipeSigned-offS & L PLUMBING & HEATING06/29/2026
DOB NOWBoiler EquipmentSigned-offJD MASTERS PLBG & HTG02/23/2026
DOB NOWBoiler EquipmentSigned-offOLYMPIAN FUEL OIL CORP02/10/2026
DOB NOWMechanical SystemsSigned-offRACANELLI CONSTRUCTION CO02/10/2026
DOB NOWBoiler EquipmentSigned-offJD MASTERS PLBG & HTG12/29/2025
DOB NOWPlumbingSigned-offS & L PLUMBING & HEATING06/27/2025
DOB NOWSprinklersSigned-offS & L PLUMBING & HEATING06/27/2025
DOB NOWMechanical SystemsSigned-offDONNELLY MECHANICAL CORP03/27/2025
DOB NOWPlumbingSigned-offADVANCED AUTO SPR.CO.,INC03/26/2025
DOB NOWPlumbingSigned-offADVANCED AUTO SPR.CO.,INC03/26/2025
DOB NOWConstruction FenceSigned-offRACANELLI CONSTRUCTION CO02/03/2025
DOB NOWConstruction FenceSigned-offRACANELLI CONSTRUCTION CO11/20/2024
DOB NOWConstruction FenceSigned-offRACANELLI CONSTRUCTION CO10/17/2024
DOB NOWPlumbingSigned-offS & L PLUMBING & HEATING10/02/2024
DOB NOWPlumbingSigned-offS & L PLUMBING & HEATING08/27/2024
DOB NOWPlumbingSigned-offADVANCED AUTO SPR.CO.,INC01/31/2024
DOB NOWPlumbingSigned-offADVANCED AUTO SPR.CO.,INC01/30/2024
DOB NOWMechanical SystemsSigned-offDONNELLY MECHANICAL CORP01/30/2024
DOB NOWStructuralSigned-offRACANELLI CONSTRUCTION CO11/29/2023
DOB NOWStandpipeSigned-offS & L PLUMBING & HEATING09/25/2023
DOB NOWPlumbingSigned-offS & L PLUMBING & HEATING08/23/2023
DOB NOWCurb CutSigned-offRACANELLI CONSTRUCTION CO06/14/2023
DOB NOWCurb CutSigned-offRACANELLI CONSTRUCTION CO06/14/2023
DOB NOWConstruction FenceSigned-offRACANELLI CONSTRUCTION CO03/28/2023
DOB NOWConstruction FenceSigned-offROCKAWAY BEACH BLVD CON04/26/2022
DOB NOWConstruction FenceSigned-offROCKAWAY BEACH BLVD CON03/08/2022
DOB NOWConstruction FenceSigned-offROCKAWAY BEACH BLVD CON12/20/2021
DOB NOWConstruction FenceSigned-offROCKAWAY BEACH BLVD CON06/01/2021
DOB NOWConstruction FenceSigned-offROCKAWAY BEACH BLVD CON03/31/2021
DOB NOWConstruction FenceSigned-offROCKAWAY BEACH BLVD CON12/03/2020
DOB NOWConstruction FenceSigned-offROCKAWAY BEACH BLVD CON07/08/2020
BIS—ISSUEDRACANELLI CONSTRUCTION CO02/02/2026
BIS—ISSUEDRACANELLI CONSTRUCTION CO02/03/2025
BIS—ISSUEDRACANELLI CONSTRUCTION CO02/03/2025
BIS—ISSUEDRACANELLI CONSTRUCTION CO01/30/2024
BIS—ISSUEDRACANELLI CONSTRUCTION CO01/30/2024
BIS—ISSUEDRACANELLI CONSTRUCTION CO01/30/2024
BIS—ISSUEDRACANELLI CONSTRUCTION CO06/15/2023
BIS—ISSUEDRACANELLI CONSTRUCTION CO04/20/2023
BIS—RE-ISSUEDRACANELLI CONSTRUCTION CO04/11/2023
+ 4 more permits on file
1 project · most recent 09/22/2023
Air Conditioning Systems Associated Ducts and Piping Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/22/2023Signed-offDONNELLY MECHANICAL CORPAir Conditioning Systems, Associated Ducts and Piping, Heating Systems, Ventilation Systems
Cooling
Daikin NA 50 BTU ×2
Heating
Sterling JVB-SS19 25 29 1 BTU ×40
Ventilation
Trane Unit 1 # OAND360A3D1B400LNA7KODAL8JN4F52C00500 Unit 2 # OADG017C1DAB10BK00-L1AJE1AE3-41D40B03A-A00C00A00-A02A00000-00AK00000 Unit 3 # OAND360A3D1B400LNA7KODAL8JN4F52C00500 480,000 BTU · Rooftop Unit ×2
Ducts & Piping
N/A NA 480,000 BTU · Ductwork ×3
1 project · most recent 02/10/2026
FiledStatusContractorScope
02/10/2026Signed-offA & F FIRE PROTECTION CO1,215 heads, 3 outlets
1 project · most recent 02/10/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
02/10/2026Signed-offS & L PLUMBING & HEATINGGas, Storm, Water/Sanitary
2 projects · most recent 10/12/2024
General Wiring
FiledStatusContractorScope
10/12/2024CompleteTF ELECTRICAL CORPGeneral Wiring
06/01/2023CompleteHELLMAN ELECTRIC LLCGeneral Wiring
▾Field Inspections (DOB CAP) — 19
DateTypeResultReport
07/15/2026Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
07/13/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/06/2026Pass-Final Boiler Equipment InspectionPassView ↗
03/05/2026Pass-Final Boiler Equipment InspectionPassView ↗
02/09/2026Pass-Final Boiler Equipment InspectionPassView ↗
10/30/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
10/06/2025Fail-Final Curb Cut Non-Directive 14FailView ↗
09/10/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
08/26/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/26/2025Certified StandPipe - SD - Fire StandPipe - SD - RoughingCertifiedView ↗
08/26/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
09/05/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/18/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/27/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/08/2024Pass-Final PL - UndergroundPassView ↗
12/22/2023Pass-Final PL - UndergroundPassView ↗
12/18/2023Fail-Final PL - UndergroundFailView ↗
10/23/2023Pass-Final PL - UndergroundPassView ↗
10/18/2023Fail-Final PL - UndergroundFailView ↗
▾Special Inspection Requirements (DOB NOW) — 90
DateRequirementInspectorRole
03/16/2026Public Assembly Emergency LightingELLIOTT HARDIEprogress
03/16/2026Public Assembly Emergency LightingELLIOTT HARDIEprogress
02/24/2026Public Assembly Emergency LightingELLIOTT HARDIEprogress
02/16/2026Electrical motorsELLIOTT HARDIEenergy_progress
02/16/2026Fire-Resistance Rated ConstructionELLIOTT HARDIEprogress
02/16/2026Standpipe SystemsELLIOTT HARDIEspecial
02/16/2026Sprinkler SystemsELLIOTT HARDIEspecial
02/16/2026Maintenance informationELLIOTT HARDIEenergy_progress
02/16/2026HVAC insulation and sealing ELLIOTT HARDIEenergy_progress
02/10/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)Rocco DeFelippisspecial
02/10/2026Lowest Floor ElevationRocco DeFelippisprogress
02/10/2026Fire-Resistant Penetrations and JointsELLIOTT HARDIEspecial
02/10/2026Heating SystemsELLIOTT HARDIEspecial
02/03/2026Heating SystemsELLIOTT HARDIEspecial
02/03/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)Rocco DeFelippisspecial
02/03/2026Lowest Floor ElevationRocco DeFelippisprogress
02/03/2026Fire-Resistant Penetrations and JointsELLIOTT HARDIEspecial
12/15/2025Maintenance informationELLIOTT HARDIEenergy_progress
12/15/2025Standpipe SystemsELLIOTT HARDIEspecial
12/15/2025Sprinkler SystemsELLIOTT HARDIEspecial
12/15/2025Fire-Resistance Rated ConstructionELLIOTT HARDIEprogress
12/15/2025HVAC insulation and sealing ELLIOTT HARDIEenergy_progress
12/15/2025Electrical motorsELLIOTT HARDIEenergy_progress
11/17/2025Standpipe SystemsELLIOTT HARDIEspecial
11/17/2025Fire-Resistance Rated ConstructionELLIOTT HARDIEprogress
Latest 25 of 90.
▾Documents — 340 on file (BIS + DOB NOW)
▸Plans & Drawings53
▸DOB NOWPlans/Sketch - Sprinkler11
08/20/2026Q00352423-I1Request digital key ↗
08/20/2026Q00352423-P6Request digital key ↗
08/20/2026Q00352423-P7Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch11
08/27/2026Q00505068-I1Request digital key ↗
08/24/2026Q00827494-I1Request digital key ↗
08/24/2026Q00827494-P1Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Plumbing11
08/20/2026Q00352423-P3Request digital key ↗
08/20/2026Q00352423-P2Request digital key ↗
08/20/2026Q00352423-P1Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Standpipe11
08/20/2026Q00352423-I1Request digital key ↗
08/20/2026Q00352423-A1Request digital key ↗
08/20/2026Q00352423-A2Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly4
08/20/2026Q01216246-I1Request digital key ↗
08/20/2026Q01216246-P1Request digital key ↗
08/20/2026Q01216216-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/26/2026Q00354098-P1Request digital key ↗
08/15/2026Q00354098-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence2
08/25/2026Q00362353-I1Request digital key ↗
08/25/2026Q00362353-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
08/27/2026Q00346496-I1Request digital key ↗
▸Applications & Permits30
▸BISPLAN / WORK APPROVAL APPLICATION22
11/19/2025421961513Open ↗
11/18/2025421961513Open ↗
11/17/2025421961513Open ↗
Showing 3 of 22 on file for this type
▸BISWORK PERMIT APPLICATION7
10/02/2023421961513Open ↗
09/15/2023421961513Open ↗
09/15/2023421961513Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
08/29/2025421961513Open ↗
▸Zoning, Tax Lot & Property Records6
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
04/20/2021440671113Open ↗
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
04/29/2020421961513Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
04/06/2021421961513Open ↗
▸BISVERIFY TAX LOT1
10/17/2025421961513Open ↗
▸BISFLOOD ZONE COMPLIANCE1
11/05/2025421961513Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
04/06/2021421961513Open ↗
▸Seals & Professional Certifications120
▸DOB NOWProgress Inspector Seal & Signature52
09/23/2026Q01321771-I1Open ↗
09/07/2026Q00346496-I1Open ↗
09/03/2026Q01321771-S1Open ↗
Showing 3 of 52 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature32
08/24/2026Q00827494-P1Open ↗
08/24/2026Q00827494-I1Open ↗
08/20/2026Q01216246-I1Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature31
09/23/2026Q01321771-I1Open ↗
09/23/2026Q01321771-I1Open ↗
09/23/2026Q01321771-I1Open ↗
Showing 3 of 31 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
06/06/2022421961513Open ↗
06/06/2022421961513Open ↗
06/06/2022421961513Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
05/14/2021440671113Open ↗
▸Trade Schedules & Equipment6
▸BISFIRE PROTECTION PLAN (FPP): FDNY APPROVAL1
10/17/2025421961513Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
02/06/2026421961513Open ↗
▸BISFIRE ALARM/SIGNAL SYSTEM (FA) SIGNOFF1
12/03/2025421961513Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
02/06/2026421961513Open ↗
▸BISSPRINKLER SYSTEMS1
09/30/2025421961513Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
10/17/2025421961513Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST2
06/06/2022421961513Open ↗
04/06/2021421961513Open ↗
▸BISSTREET TREES SITE PLAN1
10/17/2025421961513Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
12/17/2021421961513Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
06/06/2022421961513Open ↗
06/06/2022421961513Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
07/30/2025421961513Open ↗
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT1
04/06/2021421961513Open ↗
▸BISINTERIOR LIGHTING POWER1
09/30/2025421961513Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
07/30/2025421961513Open ↗
▸BISFENESTRATION AREAS1
07/30/2025421961513Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
09/08/2020421961513Open ↗
▸BISEMERGENCY LIGHTING - PA1
09/30/2025421961513Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
09/30/2025421961513Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00354098-I1Open ↗
▸Inspections & Test Reports13
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
07/19/2022421961513Open ↗
06/07/2022421961513Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF1
05/27/2021421961513Open ↗
▸BISSUBSURFACE / SOILS-FILL PLACEMENT IN-PLACE DENSITY1
08/14/2025421961513Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
08/14/2025421961513Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
01/27/2026421961513Open ↗
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS/TEST PITS)1
01/27/2026421961513Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
05/03/2023421961513Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
09/30/2025421961513Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
09/30/2025421961513Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
08/14/2025421961513Open ↗
▸BISPOST-INSTALLED ANCHORS1
08/14/2025421961513Open ↗
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
04/20/2021440671113Open ↗
▸Approvals, Objections & Sign-offs20
▸BISSCHEDULE A - OCCUPANCY / USE16
11/19/2025421961513Open ↗
11/18/2025421961513Open ↗
11/17/2025421961513Open ↗
Showing 3 of 16 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
06/23/2023421961513Open ↗
06/14/2023421961513Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff2
07/31/2023440671113Open ↗
04/20/2021440671113Open ↗
▸Cost, Insurance & Ownership2
▸BISPROJECT-SPECIFIC GL INSURANCE2
10/05/2022421961513Open ↗
06/07/2022421961513Open ↗
▸Filing & Intake Forms25
▸BISADDITIONAL INFORMATION15
09/29/2025421961513Open ↗
07/31/2023440671113Open ↗
06/02/2023421961513Open ↗
Showing 3 of 15 on file for this type
▸BISBOROUGH INTAKE FORM8
10/02/2023421961513Open ↗
09/15/2023421961513Open ↗
09/15/2023421961513Open ↗
Showing 3 of 8 on file for this type
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
05/14/2021440671113Open ↗
▸BISEFILING COVER SHEET1
04/29/2020421961513Open ↗
▸Other Documents20
▸BISBPP - SUPPORTING DOCUMENTATION6
08/09/2023440671113Open ↗
08/09/2023440671113Open ↗
07/31/2023440671113Open ↗
Showing 3 of 6 on file for this type
▸BISPLOT DIAGRAM4
04/06/2021421961513Open ↗
09/08/2020421961513Open ↗
09/08/2020421961513Open ↗
Showing 3 of 4 on file for this type
▸BISNYS DEC COASTAL EROSION HAZARD MAP2
04/20/2021440671113Open ↗
04/06/2021421961513Open ↗
▸BISPRELIMINARY1
01/12/2026421961513Open ↗
▸BISSHUTOFF DAMPERS1
09/30/2025421961513Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
01/10/2022421961513Open ↗
▸BISLOWEST FLOOR ELEVATION1
11/05/2025421961513Open ↗
▸BISVESTIBULES1
09/30/2025421961513Open ↗
▸BISSTRUCTURAL COLD-FORMED STEEL1
08/14/2025421961513Open ↗
▸BISMAINTENANCE INFORMATION1
02/06/2026421961513Open ↗
▸BISHVAC & SERVICE WATER PIPING DESIGN AND INSULATION1
07/30/2025421961513Open ↗