← Back
BuildNYC
Two family converted from one family
190 BURBANK AVENUE
STATEN ISLAND · BIN 5052557
💬 Discuss this project
1940Year Built
2Stories
B3Building Class
R3XZoning
2,581 sfGross Floor Area
2Units
Rent Stabilized2 Active Violations ▸FDNY Report ↗
Two family converted from one family · 4,000 sf lot · 0.65 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof4p · 1 filing · 20 docs
Attic15p · 1 filing · 20 docs
Floor 219p · 1 filing · 20 docs
Floor 120p · 1 filing · 20 docs
Cellar19p · 1 filing · 20 docs
Site & exterior15p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Yang Engineering304/09/2025
Jimenez Building Consulting410/04/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SD Design Studio1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Kle ConstructionGeneral Contractor107/08/2026
John Fitzgerald Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
G Engineering7778604/09/2025
SD Testing & Inspection S7010106/18/2023
Building Lifecycle
11/26/2025
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · open
06/12/2025
Closed: Work without permit, inadequate housekeeping.
DOB violation · closed on the city's record
05/28/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/25/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIONGCAI GU
63 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offJohn Fitzgerald Plumbing & Heating12/20/2023
DOB NOWGeneral ConstructionSigned-offKle Construction12/11/2023
1 project · most recent 04/09/2025
Water/Sanitary
FiledStatusContractorScope
04/09/2025Signed-offJohn Fitzgerald Plumbing & HeatingWater/Sanitary
3 projects · most recent 03/18/2024
General Wiring
FiledStatusContractorScope
03/18/2024CompleteKJK Electric—
12/19/2023CompleteKJK ElectricGeneral Wiring
12/07/2022CompleteAmber Lite ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
05/28/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/25/2025Pass-Final General Construction Non-Directive 14PassView ↗
03/13/2025Fail-Final General Construction Non-Directive 14FailView ↗
03/07/2025Fail-Final General Construction Non-Directive 14FailView ↗
09/25/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/25/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 54
DateRequirementInspectorRole
04/23/2025Fire-Resistant Penetrations and JointsXIONGCAI GUspecial
04/23/2025Structural Stability – Alterations of existing buildingsXIONGCAI GUspecial
04/23/2025Concrete - Cast-In-PlaceXIONGCAI GUspecial
04/23/2025Exterior Insulation and Finish Systems (EIFS)XIONGCAI GUspecial
04/23/2025Energy Code Compliance InspectionsXIONGCAI GUprogress
04/23/2025Fire-Resistance Rated ConstructionXIONGCAI GUprogress
04/23/2025Permanent certificateXIONGCAI GUenergy_progress
04/23/2025Fenestration and door U-factor and product ratingsXIONGCAI GUenergy_progress
04/23/2025Insulation placement and R valuesXIONGCAI GUenergy_progress
04/23/2025Interior lighting powerXIONGCAI GUenergy_progress
04/23/2025Air barrier - visual inspectionXIONGCAI GUenergy_progress
04/23/2025Fenestration areasXIONGCAI GUenergy_progress
04/23/2025Fenestration air leakageXIONGCAI GUenergy_progress
04/09/2025Fenestration air leakageXIONGCAI GUenergy_progress
04/09/2025Concrete - Cast-In-PlaceXIONGCAI GUspecial
04/09/2025Exterior Insulation and Finish Systems (EIFS)XIONGCAI GUspecial
04/09/2025Fire-Resistant Penetrations and JointsXIONGCAI GUspecial
04/09/2025Structural Stability – Alterations of existing buildingsXIONGCAI GUspecial
04/09/2025Energy Code Compliance InspectionsXIONGCAI GUprogress
04/09/2025Fire-Resistance Rated ConstructionXIONGCAI GUprogress
04/09/2025Fenestration and door U-factor and product ratingsXIONGCAI GUenergy_progress
04/09/2025Air barrier - visual inspectionXIONGCAI GUenergy_progress
04/09/2025Fenestration areasXIONGCAI GUenergy_progress
04/09/2025Permanent certificateXIONGCAI GUenergy_progress
04/09/2025Interior lighting powerXIONGCAI GUenergy_progress
Latest 25 of 54.
66 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account