← Back
BRONX
190 EAST 138 STREET
BRONX · Mott Haven-Port Morris · BIN 2131122
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CIVIC ARCHITECTURE WORKSHOP106/03/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONVERSANO ASSOCIATES, INC.203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STAMFORD TENT & EQUIP COGeneral Contractor107/08/2026
Building Lifecycle
All (7)Filed (1)Permit Issued (1)Signed Off (1)Inspection (3)Special Inspection (1)
06/17/2026
Signed off — Alteration
INSTALLATION OF PERMANENT PREFABRICATED ACCESSORY SHADE STRUCTURE WITH ATTACHED BATTERY-CONNECTED SOLAR PANELS IN NYC PARK , NO CHANGE TO USE, OCCUPANCY OR EGRESS.
X01234098-I1
10/31/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/26/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/26/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/12/2025
Permit issued — General Construction
X01234098-I1-GC
06/03/2025
Filed — Alteration
INSTALLATION OF PERMANENT PREFABRICATED ACCESSORY SHADE STRUCTURE WITH ATTACHED BATTERY-CONNECTED SOLAR PANELS IN NYC PARK , NO CHANGE TO USE, OCCUPANCY OR EGRESS.
X01234098-I1
06/02/2025
Special inspection requirement — Final
Severn Clay-Youman
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offSTAMFORD TENT & EQUIP CO06/12/2025
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
10/31/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/26/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/26/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
06/02/2025FinalSevern Clay-Youmanprogress
▾Documents — 4 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/19/2026X01234098-I1Request digital key ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/19/2026X01234098-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/23/2026X01234098-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
08/13/2026X01234098-I1Open ↗