← Back
BuildNYC
Over six families without stores
190 HARMAN STREET
BROOKLYN · BIN 3325688
💬 Discuss this project
1982Year Built
3Stories
C1Building Class
R6Zoning
74,280 sfGross Floor Area
72Units
LL97 CoveredRent Stabilized0 Active Violations 5 likely answered ▸FDNY Report ↗
Over six families without stores · Owner of record: Hope Gardens 1 · 105,175 sf lot · 0.71 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
CellarHVAC system installationUnder Construction30p · 2 filings · 20 docs
Site & exteriorHVAC system installationUnder Construction33p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Pennrose2808/28/2026
New York City Housing Authority1003/21/2026
Hope Gardens I603/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Cameron Engineering704/01/2026
IMEG Consulting101/18/2024
Christopher Compton105/02/2022
Scalar Architecture110/25/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE Design Solution203/21/2026
JM Zoning1403/21/2026
ECC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Procida ConstructionGeneral Contractor607/08/2026
J-J PlumbingPlumbing307/08/2026
Dudley & Associates Lic. ElectricElectrical103/21/2026
?John SR MariElectrical103/21/2026
Dudley JamalElectrical103/21/2026
Procida ConstructionScaffold107/08/2026
Selectric Electrical Cont Co IElectrical103/21/2026
Interstate ElectricElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Tectonic Engineering Cons106904/01/2026
Environmental Code Consulting5516105/02/2022
Building Lifecycle
All (86)Filed (10)Permit Issued (8)Signed Off (3)Violation (29)Inspection (6)Special Inspection (30)
08/31/2026
Signed off — Alteration
DECOMMISSION AND ABANDON IN PLACE EXISTING INDIRECT DOMESTIC WATER HEATERS, RECIRCULATION PUMP, AND ASSOCIATED PIPING WITH VALVES; PROVIDE NEW DOMESTIC WATER AND GAS PIPING FROM THE CEL TO A NEW BOILER POD. NO CHANGES TO USE, EGRESS, OR OCCUPANCY.
B00962006-S4
07/29/2026
Signed off — Alteration
RENOVATION OF 3-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: PROVIDE SUPPORT FOR NEW EXTERIOR BOILER ROOM POD; NO CHANGES TO USE, EGRESS OR OCCUPANCY.
B00961991-I1
04/01/2026
Filed — Alteration
DECOMMISSION AND ABANDON IN PLACE EXISTING INDIRECT DOMESTIC WATER HEATERS, RECIRCULATION PUMP, AND ASSOCIATED PIPING WITH VALVES; PROVIDE NEW DOMESTIC WATER AND GAS PIPING FROM THE CEL TO A NEW BOILER POD. NO CHANGES TO USE, EGRESS, OR OCCUPANCY.
B00962006-P4
04/01/2026
Special inspection requirement — Sprinkler Systems
GEORGE GHEBRYAL
04/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
04/01/2026
Special inspection requirement — Tenant Protection Plan Compliance
03/13/2026
Special inspection requirement — Tenant Protection Plan Compliance
03/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
03/13/2026
Special inspection requirement — Sprinkler Systems
GEORGE GHEBRYAL
02/12/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/12/2026
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
01/27/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/14/2026
Permit issued — Plumbing
B00962006-S2-PL
12/12/2025
Filed — Alteration
DECOMMISSION AND ABANDON IN PLACE EXISTING INDIRECT DOMESTIC WATER HEATERS, RECIRCULATION PUMP, AND ASSOCIATED PIPING WITH VALVES; PROVIDE NEW DOMESTIC WATER AND GAS PIPING FROM THE CEL TO A NEW BOILER POD. NO CHANGES TO USE, EGRESS, OR OCCUPANCY.
B00962006-P3
12/11/2025
Special inspection requirement — Tenant Protection Plan Compliance
GEORGE GHEBRYAL
12/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
12/09/2025
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
12/09/2025
Special inspection requirement — Sprinkler Systems
GEORGE GHEBRYAL
12/01/2025
Permit issued — Mechanical Systems
B00962006-I1-MS
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/11/2025
Filed — Alteration
DECOMMISSION AND ABANDON IN PLACE EXISTING INDIRECT DOMESTIC WATER HEATERS, RECIRCULATION PUMP, AND ASSOCIATED PIPING WITH VALVES; PROVIDE NEW DOMESTIC WATER AND GAS PIPING FROM THE CEL TO A NEW BOILER POD. NO CHANGES TO USE, EGRESS, OR OCCUPANCY.
B00962006-P2
08/07/2025
Special inspection requirement — Tenant Protection Plan Compliance
08/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
08/07/2025
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
08/07/2025
Special inspection requirement — Sprinkler Systems
GEORGE GHEBRYAL
07/15/2025
Permit issued — General Construction
B00961991-I1-GC-CX
06/13/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
03/28/2025
Permit issued — Boiler Equipment
B00962006-S4-BE
03/17/2025
Inspection — Certified Gas-Gas-Piping-Underground
Certified
View inspection ↗
03/05/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/26/2025
Filed — Alteration
DECOMMISSION AND ABANDON IN PLACE EXISTING INDIRECT DOMESTIC WATER HEATERS, RECIRCULATION PUMP, AND ASSOCIATED PIPING WITH VALVES; PROVIDE NEW DOMESTIC WATER AND GAS PIPING FROM THE CEL TO A NEW BOILER POD. NO CHANGES TO USE, EGRESS, OR OCCUPANCY.
B00962006-S4
02/19/2025
Permit issued — Foundation
B00961991-I1-GC-CX
02/06/2025
Special inspection requirement — Maintenance information
GEORGE GHEBRYAL
02/06/2025
Special inspection requirement — HVAC-R and service water heating equipment
GEORGE GHEBRYAL
02/06/2025
Special inspection requirement — Tenant Protection Plan Compliance
GEORGE GHEBRYAL
02/06/2025
Special inspection requirement — Heating Systems
GEORGE GHEBRYAL
02/06/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
GEORGE GHEBRYAL
02/06/2025
Special inspection requirement — HVAC-R and service water heating system controls
GEORGE GHEBRYAL
01/09/2025
Permit issued — Plumbing
B00962006-S2-PL
12/12/2024
Permit issued — Mechanical Systems
B00962006-I1-MS
01/18/2024
Filed — Alteration
RENOVATION OF 3-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: PROVIDE SUPPORT FOR NEW EXTERIOR BOILER ROOM POD; NO CHANGES TO USE, EGRESS OR OCCUPANCY.
B00961991-I1
01/18/2024
Filed — Alteration
DECOMMISSION AND ABANDON IN PLACE EXISTING INDIRECT DOMESTIC WATER HEATERS, RECIRCULATION PUMP, AND ASSOCIATED PIPING WITH VALVES; PROVIDE NEW DOMESTIC WATER AND GAS PIPING FROM THE CEL TO A NEW BOILER POD. NO CHANGES TO USE, EGRESS, OR OCCUPANCY.
B00962006-P1
01/10/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
01/10/2024
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
01/10/2024
Special inspection requirement — Sprinkler Systems
GEORGE GHEBRYAL
01/10/2024
Special inspection requirement — Tenant Protection Plan Compliance
01/05/2024
Filed — Alteration
DECOMMISSION AND ABANDON IN PLACE EXISTING INDIRECT DOMESTIC WATER HEATERS, RECIRCULATION PUMP, AND ASSOCIATED PIPING WITH VALVES; PROVIDE NEW DOMESTIC WATER AND GAS PIPING FROM THE CEL TO A NEW BOILER POD. NO CHANGES TO USE, EGRESS, OR OCCUPANCY.
B00962006-I1
01/05/2024
Filed — Alteration
DECOMMISSION AND ABANDON IN PLACE EXISTING INDIRECT DOMESTIC WATER HEATERS, RECIRCULATION PUMP, AND ASSOCIATED PIPING WITH VALVES; PROVIDE NEW DOMESTIC WATER AND GAS PIPING FROM THE CEL TO A NEW BOILER POD. NO CHANGES TO USE, EGRESS, OR OCCUPANCY.
B00962006-S2
12/14/2023
Special inspection requirement — Concrete - Cast-In-Place
GEORGE GHEBRYAL
12/14/2023
Special inspection requirement — Shutoff dampers
GEORGE GHEBRYAL
12/14/2023
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
GEORGE GHEBRYAL
12/14/2023
Special inspection requirement — Subgrade Inspections
GEORGE GHEBRYAL
12/14/2023
Special inspection requirement — Structural Steel - Welding
GEORGE GHEBRYAL
12/14/2023
Special inspection requirement — Structural Steel - High Strength Bolting
GEORGE GHEBRYAL
07/21/2023
Violation issued (HPD, closed)
C
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/29/2023
Violation issued (HPD, closed)
A
Latest 60 of 86 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offJ-J Plumbing01/14/2026
DOB NOWMechanical SystemsPermit IssuedProcida Construction12/01/2025
DOB NOWGeneral ConstructionSigned-offProcida Construction07/15/2025
DOB NOWBoiler EquipmentSigned-offJ-J Plumbing03/28/2025
DOB NOWFoundationSigned-offProcida Construction02/19/2025
DOB NOWPlumbingSigned-offJ-J Plumbing01/09/2025
DOB NOWMechanical SystemsPermit IssuedProcida Construction12/12/2024
DOB NOWConstruction FenceSigned-offProcida Construction10/29/2019
BISPLISSUEDPlumbing-It Mechanical11/09/2021
BISOTISSUEDProcida Construction04/26/2021
BISMHISSUEDProcida Construction04/26/2021
BISOTISSUEDBright Power02/16/2021
BISOTISSUEDBright Power02/16/2021
BISBLISSUEDPlumbing-It Mechanical11/04/2020
BISOTISSUEDBright Power Installation09/01/2020
BISBLISSUEDPlumbing-It Mechanical06/16/2020
BISPLISSUEDPlumbing-It Mechanical06/16/2020
BISOTISSUEDProcida Construction05/06/2020
BISMHISSUEDProcida Construction05/06/2020
BISOTISSUEDProcida Construction11/27/2019
BISMHISSUEDProcida Construction11/27/2019
BISBLISSUEDKings Plaza P & H04/04/2011
2 projects · most recent 04/01/2026
Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/01/2026Permit IssuedProcida ConstructionHeating Systems
Heating
Raypak H7-1257 1,250,000 BTU · Boiler ×2
05/02/2022——Ventilation Systems
Ventilation
__Junk__ COMBINATION FIRE / SMOKE DAMPER MODEL FA1 1 BTU ×1
1 project · most recent 04/01/2026
FiledStatusContractorScope
04/01/2026——25 heads
1 project · most recent 04/01/2026
Gas Plumbing-Sprinkler Water/Sanitary
FiledStatusContractorScope
04/01/2026Signed-offJ-J PlumbingGas, Plumbing-Sprinkler, Water/Sanitary
6 projects · most recent 01/12/2026
General Wiring
FiledStatusContractorScope
01/12/2026Permit IssuedHI-Lights Electrical—
06/28/2024Permit IssuedSNB Electrical Contng1 meters, 1 new_meters
12/17/2021CompleteMetropolitan Electric of NY I—
07/05/2021CompleteModern Trend Electrical Contracting—
01/05/2021Permit IssuedInterstate Electric1 meters, 1 new_meters
04/23/2020Permit IssuedE & M Electrical NYGeneral Wiring
1 project · most recent 01/18/2024
Steel
FiledStatusContractorScope
01/18/2024Signed-offProcida ConstructionSteel
2 projects · most recent 04/01/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
04/01/2026Signed-offJ-J PlumbingTenant Protection Plan 72 Hour
01/18/2024Signed-offProcida ConstructionTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
02/12/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/12/2026Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
01/27/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/13/2025Pass-Final Boiler Equipment InspectionPassView ↗
03/17/2025Certified Gas-Gas-Piping-UndergroundCertifiedView ↗
03/05/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 49
DateRequirementInspectorRole
04/01/2026Sprinkler SystemsGEORGE GHEBRYALspecial
04/01/2026Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
04/01/2026Tenant Protection Plan Compliance—special
03/13/2026Tenant Protection Plan Compliance—special
03/13/2026Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
03/13/2026Sprinkler SystemsGEORGE GHEBRYALspecial
12/11/2025Tenant Protection Plan ComplianceGEORGE GHEBRYALspecial
12/09/2025Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
12/09/2025Post-installed AnchorsGEORGE GHEBRYALspecial
12/09/2025Sprinkler SystemsGEORGE GHEBRYALspecial
08/07/2025Tenant Protection Plan Compliance—special
08/07/2025Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
08/07/2025Post-installed AnchorsGEORGE GHEBRYALspecial
08/07/2025Sprinkler SystemsGEORGE GHEBRYALspecial
02/06/2025Maintenance informationGEORGE GHEBRYALenergy_progress
02/06/2025HVAC-R and service water heating equipmentGEORGE GHEBRYALenergy_progress
02/06/2025Tenant Protection Plan ComplianceGEORGE GHEBRYALspecial
02/06/2025Heating SystemsGEORGE GHEBRYALspecial
02/06/2025HVAC-R and service water piping design and insulationGEORGE GHEBRYALenergy_progress
02/06/2025HVAC-R and service water heating system controlsGEORGE GHEBRYALenergy_progress
01/10/2024Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
01/10/2024Post-installed AnchorsGEORGE GHEBRYALspecial
01/10/2024Sprinkler SystemsGEORGE GHEBRYALspecial
01/10/2024Tenant Protection Plan Compliance—special
12/14/2023Concrete - Cast-In-PlaceGEORGE GHEBRYALspecial
Latest 25 of 49.
▾Documents — 164 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch9
08/29/2026B00718680-I1Request digital key ↗
08/26/2026B00961991-I1Request digital key ↗
08/17/2026B00962006-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00248829-I1Request digital key ↗
▸Applications & Permits20
▸BISPLAN / WORK APPROVAL APPLICATION13
11/30/2021321823078Open ↗
09/15/2021321958413Open ↗
06/11/2021321823078Open ↗
Showing 3 of 13 on file for this type
▸BISWORK PERMIT APPLICATION7
02/19/2021340759076Open ↗
09/01/2020340759076Open ↗
06/16/2020321823078Open ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications37
▸DOB NOWSpecial Inspector Seal & Signature10
08/24/2026B00962006-P2Open ↗
08/23/2026B00718680-I1Open ↗
08/22/2026B00961991-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/26/2026B00961991-I1Open ↗
08/17/2026B00962006-S2Open ↗
08/17/2026B00962006-I1Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
10/01/2019321823078Open ↗
10/01/2019321823078Open ↗
06/28/2019321823078Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/23/2026B00718680-I1Open ↗
08/22/2026B00961991-I1Open ↗
08/22/2026B00962006-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
08/25/2020340759076Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
02/28/2011320271497Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/25/2020340759076Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
02/28/2011320271497Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
08/25/2020340759076Open ↗
▸Trade Schedules & Equipment9
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
06/26/2019321823078Open ↗
05/15/2019321823078Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
05/15/2019321823078Open ↗
02/28/2011320271497Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
06/16/2022321958413Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
04/05/2022321823078Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
04/05/2022321823078Open ↗
▸BISHEATING SYSTEMS1
04/05/2022321823078Open ↗
▸BISSCHEDULE B - PLUMBING1
11/30/2021321823078Open ↗
▸Safety & Tenant Protection3
▸BISTENANT PROTECTION PLAN AND NOTES2
08/25/2020340759076Open ↗
05/15/2019321823078Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026B00248829-I1Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/17/2026B00962006-P4Open ↗
08/17/2026B00962006-I1Open ↗
08/17/2026B00962006-P3Open ↗
Showing 3 of 7 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
02/28/2011320271497Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
05/31/2019321958413Open ↗
▸Energy Compliance23
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
10/01/2019321823078Open ↗
10/01/2019321823078Open ↗
06/28/2019321823078Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
03/23/2022340759076Open ↗
08/25/2020340759076Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING2
04/05/2022321823078Open ↗
04/05/2022321823078Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
04/05/2022321823078Open ↗
▸BISINTERIOR LIGHTING POWER1
04/05/2022321823078Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
03/23/2022340759076Open ↗
▸BISFENESTRATION AREAS1
04/05/2022321823078Open ↗
▸BISLIGHTING IN DWELLING UNITS1
04/05/2022321823078Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
04/05/2022321823078Open ↗
▸BISELECTRIC MOTORS1
04/05/2022321823078Open ↗
▸BISLIGHTING CONTROLS1
04/05/2022321823078Open ↗
▸BIS* HVAC INSULATION AND SEALING1
04/05/2022321823078Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
04/05/2022321823078Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
08/25/2020340759076Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION1
04/05/2022321823078Open ↗
▸BISEXTERIOR LIGHTING POWER1
04/05/2022321823078Open ↗
▸BISFENESTRATION AIR LEAKAGE1
04/05/2022321823078Open ↗
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY2
03/23/2022340759076Open ↗
08/25/2020340759076Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
04/05/2022321823078Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
04/05/2022321823078Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
04/05/2022321823078Open ↗
▸BISMECHANICAL SYSTEMS1
04/05/2022321823078Open ↗
▸BISHIGH TEMPERATURE HOT WATER PIPING (WELDING)1
04/05/2022321823078Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00961991-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026B00961991-I1Open ↗
▸Approvals, Objections & Sign-offs18
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter10
08/13/2026B00962006-P3Open ↗
08/13/2026B00962006-I1Open ↗
08/13/2026B00962006-S4Open ↗
Showing 3 of 10 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
04/06/2022321823078Open ↗
03/25/2022340759076Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
08/31/2020321823078Open ↗
▸BISSUPERSEDING LETTER1
02/19/2021340759076Open ↗
▸BISFINAL1
04/05/2022321823078Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
02/28/2011320271497Open ↗
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)1
08/13/2026B00248829-I1Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)1
08/13/2026B00248829-I1Open ↗
▸Cost, Insurance & Ownership9
▸BISCOST AFFIDAVIT7
03/23/2022340759076Open ↗
05/10/2021340759076Open ↗
04/05/2021340759076Open ↗
Showing 3 of 7 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
07/26/2022321958413Open ↗
04/05/2022321823078Open ↗
▸Filing & Intake Forms15
▸BISADDITIONAL INFORMATION10
11/20/2021321823078Open ↗
11/20/2021321823078Open ↗
11/20/2021321823078Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING COVER SHEET4
05/31/2019321958413Open ↗
05/15/2019321823078Open ↗
05/15/2019321823078Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
08/25/2020340759076Open ↗
▸Other Documents2
▸BISSHUTOFF DAMPERS1
04/05/2022321823078Open ↗
▸BISMAINTENANCE INFORMATION1
04/05/2022321823078Open ↗