← Back
BuildNYC
Over six families without stores
190 PALMETTO STREET
BROOKLYN · BIN 3326171
💬 Discuss this project
1983Year Built
3Stories
C1Building Class
R6Zoning
99,040 sfGross Floor Area
96Units
LL97 CoveredRent Stabilized26 Active Violations 4 likely answered ▸FDNY Report ↗
Over six families without stores · Owner of record: Hope Gardens 1 · 120,200 sf lot · 0.82 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1Unit 1A, Unit 1C, Unit 1D2p · 1 filing · 4 docs
CellarHope Gardens - Group D20p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Pennrose2010/04/2026
New York City Housing Authority1103/21/2026
Hope Gardens I303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Cameron Engineering409/18/2026
Christopher Compton304/12/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ECC603/21/2026
JM Zoning403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J-J PlumbingPlumbing303/21/2026
Miller Plumbing & HeatingPlumbing307/08/2026
Procida Constructionspecialty_contractor304/09/2026
New York Plumbing-Heating-CoolingPlumbing203/22/2026
Interstate Restorationspecialty_contractor107/08/2026
G.M.A. Plumbing & HeatingPlumbing107/08/2026
Bright Power InstallationGeneral Contractor106/26/2020
Procida ConstructionGeneral Contractor612/11/2020
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Tectonic Engineering106409/18/2026
Environmental Code Consulting5516304/12/2022
Building Lifecycle
10/17/2026
Permit expired, never signed off — Mechanical Systems
The city's record still shows this permit as issued, with no sign-off on its filing
B00963152-I1-MS
09/18/2026
Filed — Alteration
DECOMMISSION AND ABANDON IN PLACE EXISTING INDIRECT DOMESTIC WATER HEATERS, RECIRCULATION PUMP, AND ASSOCIATED PIPING WITH VALVES; PROVIDE NEW DOMESTIC WATER PIPING FROM THE CELLAR TO OUTSIDE; NO CHANGES TO USE, EGRESS, OR OCCUPANCY.
B00963152-P2
08/28/2026
Special inspection requirement — Tenant Protection Plan Compliance
08/28/2026
Special inspection requirement — Energy Code Compliance Inspections
GEORGE GHEBRYAL
08/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
87 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedProcida Construction10/17/2025
DOB NOWPlumbingPermit IssuedMiller Plumbing & Heating12/16/2024
DOB NOWMechanical SystemsPermit IssuedProcida Construction04/08/2024
DOB NOWGeneral ConstructionSigned-offInterstate Restoration05/05/2022
DOB NOWBoiler EquipmentSigned-offG.M.A. Plumbing & Heating01/13/2022
BISBLISSUEDJ-J Plumbing03/24/2022
BISPLISSUEDJ-J Plumbing02/07/2022
BISBLISSUEDJ-J Plumbing03/25/2021
BISPLISSUEDJ-J Plumbing12/28/2020
BISMHISSUEDProcida Construction12/11/2020
BISOTISSUEDProcida Construction12/11/2020
BISBLISSUEDJ-J Plumbing11/30/2020
BISOTISSUEDBright Power Installation06/26/2020
BISOTISSUEDProcida Construction05/05/2020
BISMHISSUEDProcida Construction05/05/2020
BISMHISSUEDProcida Construction10/03/2019
BISOTISSUEDProcida Construction10/03/2019
1 project · most recent 09/18/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
09/18/2026Permit IssuedMiller Plumbing & HeatingGas, Storm, Water/Sanitary
2 projects · most recent 05/28/2020
General Wiring
FiledStatusContractorScope
05/28/2020CompleteVenture Home Solar—
02/26/2020CompleteRamdeen's Electric ContractingGeneral Wiring
1 project · most recent 09/18/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
09/18/2026Permit IssuedProcida ConstructionTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
01/23/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/02/2022Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
08/28/2026Tenant Protection Plan Compliance—special
08/28/2026Energy Code Compliance InspectionsGEORGE GHEBRYALprogress
08/28/2026Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
08/28/2026Mechanical SystemsGEORGE GHEBRYALspecial
08/28/2026HVAC-R and service water piping design and insulationGEORGE GHEBRYALenergy_progress
08/28/2026FinalGEORGE GHEBRYALprogress
01/10/2024Energy Code Compliance InspectionsGEORGE GHEBRYALprogress
12/27/2023HVAC-R and service water piping design and insulationGEORGE GHEBRYALenergy_progress
12/27/2023Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
12/27/2023Post-installed AnchorsGEORGE GHEBRYALspecial
12/27/2023HVAC-R and service water piping design and insulationGEORGE GHEBRYALenergy_progress
12/27/2023Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
12/27/2023Post-installed AnchorsGEORGE GHEBRYALspecial
12/27/2023Energy Code Compliance InspectionsGEORGE GHEBRYALprogress
11/15/2023Tenant Protection Plan ComplianceGEORGE GHEBRYALspecial
11/15/2023FinalGEORGE GHEBRYALprogress
11/15/2023Tenant Protection Plan ComplianceGEORGE GHEBRYALspecial
11/15/2023Mechanical SystemsGEORGE GHEBRYALspecial
04/07/2022Heating SystemsCHRISTOPHER COMPTONspecial
03/10/2022Heating SystemsCHRISTOPHER COMPTONspecial
125 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account