← Back
BuildNYC
Walk-up apt, over six families with stores
Williamsburg Houses
190 TEN EYCK STREET · BIN 3327888
💬 Discuss this project
1938Year Built
4Stories
C7Building Class
R6Zoning
345,248 sfGross Floor Area
486Units
LL97 CoveredRent Stabilized0 Active ViolationsFDNY Report ↗
Walk-up apt, over six families with stores · Owner of record: Williamsburg Pact · 283,200 sf lot · 1.22 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofWilliamsburg Pact LLC63p · 2 filings · 20 docs
BulkheadWilliamsburg Pact LLC1p · 1 filing · 14 docs
Floor 4Williamsburg Pact LLC62p · 3 filings · 20 docs
Floor 3Williamsburg Pact LLC62p · 3 filings · 20 docs
Floor 2Williamsburg Pact LLC62p · 3 filings · 20 docs
Floor 1Williamsburg Pact LLC65p · 4 filings · 20 docs
CellarWilliamsburg Pact LLC34p · 4 filings · 20 docs
BasementWilliamsburg Pact LLC1p · 1 filing · 14 docs
Sub-BasementWilliamsburg Pact LLC34p · 1 filing · 14 docs
Site & exteriorWilliamsburg Pact LLC37p · 2 filings · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Williamsburgh Pact3407/08/2026
New York City Housing Authority1403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Dibari Engineering709/10/2024
Joel Phagoo P.E106/09/2023
Newman Design Architects305/09/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Charis Consulting1203/21/2026
William Vitacco Associates603/21/2026
DVA Advisors103/21/2026
A1 Expediting Service203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Tradeline PlumbingPlumbing507/08/2026
SNS OrgnizationGeneral Contractor407/08/2026
Yarks NYCScaffold303/21/2026
Zone Plumbing & HeatingPlumbing307/08/2026
MDG Design & ConstructionGeneral Contractor207/08/2026
KTB ElectricElectrical203/22/2026
A1 Expediting ServiceElectrical103/21/2026
KTB ElectricGeneral Contractor103/22/2026
KTB ElectricElectrical103/21/2026
Jemco Electric ContractorsElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Lorjan Agalliu Architect6104909/10/2024
Building Lifecycle
All (108)Filed (11)Permit Issued (10)Signed Off (7)Violation (44)Inspection (4)Objection (10)Special Inspection (22)
10/01/2025
Violation issued (ECB, closed)
Boilers
03/14/2025
Signed off — Alteration
New 30' wide curb cut to access trash enclosure.
B00678242-I1
02/27/2025
Signed off — Alteration
Replacement of boilers & associated ducts/piping as shown on drawings. No change in use, egress, or occupancy.
B00479261-I1
11/09/2024
Violation issued (HPD, closed)
B
11/09/2024
Violation issued (HPD, closed)
B
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/18/2024
Signed off — Alteration
All plumbing work in tank room of boiler room associated plumbing piping (Domestic Hot & Cold Valves) install (3) new Turbo Max, (2) HWCP (Hot Water Circulating Pumps), Mixing Valves (TMV1 & TMV2) & Water submeter. No change in use, egress / occupancy.
B00727252-I1
09/10/2024
Filed — Alteration
Replacement of boilers & associated ducts/piping as shown on drawings. No change in use, egress, or occupancy.
B00479261-P1
09/10/2024
Special inspection requirement — Maintenance information
lorjan agalliu
09/10/2024
Special inspection requirement — Heating Systems
lorjan agalliu
09/10/2024
Special inspection requirement — HVAC-R and service water heating equipment
lorjan agalliu
09/10/2024
Special inspection requirement — HVAC-R and service water heating system controls
lorjan agalliu
08/28/2024
Special inspection requirement — HVAC-R and service water heating system controls
lorjan agalliu
08/28/2024
Special inspection requirement — HVAC-R and service water heating equipment
lorjan agalliu
08/28/2024
Special inspection requirement — Maintenance information
lorjan agalliu
08/28/2024
Special inspection requirement — Heating Systems
lorjan agalliu
08/23/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
08/19/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/15/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/02/2024
Signed off — Alteration
B00493454-I1
05/14/2024
Signed off — Alteration
B00492698-I1
05/07/2024
Permit issued — Curb Cut
B00678242-I1-CC
04/03/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
lorjan agalliu
03/27/2024
Filed — Alteration
B00493454-P3
03/26/2024
Signed off — Alteration
B00491962-I1
03/13/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
lorjan agalliu
02/28/2024
Violation issued (ECB, closed)
Construction
02/15/2024
Signed off — Alteration
B00849789-I1
02/02/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
01/22/2024
Permit issued — Plumbing
B00727252-I1-PL
01/08/2024
Permit issued — Plumbing
B00493454-I1-PL
01/02/2024
Permit issued — Mechanical Systems
B00492698-I1-MS
10/17/2023
Objection resolved — Addressed
09/20/2023
Objection resolved — Addressed
09/20/2023
Objection resolved — Addressed
09/18/2023
Permit issued — Mechanical Systems
B00492698-I1-MS
08/08/2023
Permit issued — General Construction
B00491962-I1-GC
07/26/2023
Filed — Alteration
All plumbing work in tank room of boiler room associated plumbing piping (Domestic Hot & Cold Valves) install (3) new Turbo Max, (2) HWCP (Hot Water Circulating Pumps), Mixing Valves (TMV1 & TMV2) & Water submeter. No change in use, egress / occupancy.
B00727252-I1
06/29/2023
Permit issued — Boiler Equipment
B00479261-I1-BE
06/09/2023
Filed — Alteration
B00849789-I1
06/09/2023
Permit issued — Sidewalk Shed
B00849789-I1-SH
06/06/2023
Objection resolved — Addressed
05/15/2023
Objection raised — Other
05/10/2023
Special inspection requirement — Final
lorjan agalliu
05/10/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
lorjan agalliu
05/10/2023
Special inspection requirement — Masonry
lorjan agalliu
05/10/2023
Special inspection requirement — Fire-Resistance Rated Construction
lorjan agalliu
05/10/2023
Special inspection requirement — Energy Code Compliance Inspections
lorjan agalliu
05/10/2023
Special inspection requirement — Exterior lighting power
lorjan agalliu
05/10/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
lorjan agalliu
05/10/2023
Special inspection requirement — Lighting controls
lorjan agalliu
05/10/2023
Special inspection requirement — Lighting in dwelling units
lorjan agalliu
05/10/2023
Special inspection requirement — Interior lighting power
lorjan agalliu
05/09/2023
Filed — Alteration
B00491962-P1
03/09/2023
Special inspection requirement — Tenant Protection Plan Compliance
lorjan agalliu
02/28/2023
Objection resolved — Addressed
12/27/2022
Objection raised — Other
12/27/2022
Objection raised — Scope
Latest 60 of 108 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offMDG Design & Construction05/07/2024
DOB NOWPlumbingSigned-offTradeline Plumbing01/22/2024
DOB NOWPlumbingSigned-offZone Plumbing & Heating01/08/2024
DOB NOWMechanical SystemsSigned-offSNS Orgnization01/02/2024
DOB NOWMechanical SystemsSigned-offSNS Orgnization09/18/2023
DOB NOWGeneral ConstructionSigned-offMDG Design & Construction08/08/2023
DOB NOWBoiler EquipmentSigned-offStuart N Schwartz06/29/2023
DOB NOWSidewalk ShedSigned-offYarks NYC06/09/2023
DOB NOWBoiler EquipmentSigned-offStuart N Schwartz12/14/2022
DOB NOWBoiler EquipmentSigned-offStuart N Schwartz07/07/2022
BISEQISSUEDUtb-United Technology12/21/2006
BISEQISSUEDUtb-United Technology09/27/2006
BISOTISSUEDUtb-United Technology06/13/2006
BISFSISSUEDJack Piccini03/09/2006
BISPLISSUEDRaytone Plumbing Spec03/02/2006
BISOTISSUEDUtb-United Technology12/28/2005
BISBLISSUEDDouglas Simmons10/21/2005
BISFBISSUEDDouglas Simmons10/21/2005
BISPLISSUEDNY Plumbing & Spkler02/15/2005
BISSPISSUEDV. C. Vitanza Sons04/16/2003
BISFBISSUEDMaric Plumbing & Heating05/03/2002
BISFBISSUEDDouglas Simmons05/04/1999
BISPLISSUEDNY Plumbing & Spkler04/30/1999
BISBLISSUEDMaric Mechanical04/19/1999
BISFBISSUEDB.G. National Plumbing & Heating02/03/1995
BISPLISSUEDB.G. National Plumbing & Heating02/03/1995
6 projects · most recent 07/20/2026
General Wiring
FiledStatusContractorScope
07/20/2026CompleteDelco ElectricalGeneral Wiring
07/20/2026CompleteDelco ElectricalGeneral Wiring
10/29/2025CompleteKTB ElectricGeneral Wiring
10/29/2025CompleteKTB ElectricGeneral Wiring
01/16/2024CompleteDelco ElectricalGeneral Wiring
10/09/2020CompleteJemco Electric Contractors—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
08/23/2024Pass-Final Boiler Equipment InspectionPassView ↗
08/19/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/15/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/02/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
09/10/2024Maintenance informationlorjan agalliuenergy_progress
09/10/2024Heating Systemslorjan agalliuspecial
09/10/2024HVAC-R and service water heating equipmentlorjan agalliuenergy_progress
09/10/2024HVAC-R and service water heating system controlslorjan agalliuenergy_progress
08/28/2024HVAC-R and service water heating system controlslorjan agalliuenergy_progress
08/28/2024HVAC-R and service water heating equipmentlorjan agalliuenergy_progress
08/28/2024Maintenance informationlorjan agalliuenergy_progress
08/28/2024Heating Systemslorjan agalliuspecial
04/03/2024Fire-Resistant Penetrations and Jointslorjan agalliuspecial
03/13/2024Fire-Resistant Penetrations and Jointslorjan agalliuspecial
05/10/2023Finallorjan agalliuprogress
05/10/2023Fire-Resistant Penetrations and Jointslorjan agalliuspecial
05/10/2023Masonrylorjan agalliuspecial
05/10/2023Fire-Resistance Rated Constructionlorjan agalliuprogress
05/10/2023Energy Code Compliance Inspectionslorjan agalliuprogress
05/10/2023Exterior lighting powerlorjan agalliuenergy_progress
05/10/2023Fenestration and door U-factor and product ratingslorjan agalliuenergy_progress
05/10/2023Lighting controlslorjan agalliuenergy_progress
05/10/2023Lighting in dwelling unitslorjan agalliuenergy_progress
05/10/2023Interior lighting powerlorjan agalliuenergy_progress
03/09/2023Tenant Protection Plan Compliancelorjan agalliuspecial
07/08/2022Fire-Resistant Penetrations and Jointslorjan agalliuspecial
▾Documents — 69 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/31/2026B00492698-I1Request digital key ↗
08/31/2026B00493454-P3Request digital key ↗
08/31/2026B00493454-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits9
▸DOB NOWLPC Approval/Permit8
08/13/2026B00727252-I1Open ↗
08/13/2026B00492698-I1Open ↗
08/13/2026B00491962-P1Open ↗
Showing 3 of 8 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION1
02/05/2021302223038Open ↗
▸Seals & Professional Certifications25
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/31/2026B00492698-I1Open ↗
08/31/2026B00493454-P3Open ↗
08/31/2026B00493454-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/01/2026B00479261-P1Open ↗
09/01/2026B00479261-P1Open ↗
09/01/2026B00479261-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026B00479261-P1Open ↗
08/30/2026B00493454-I1Open ↗
08/26/2026B00493454-P3Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/31/2026B00479261-P1Open ↗
08/31/2026B00479261-I1Open ↗
08/13/2026B00727252-I1Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/31/2026B00492698-I1Open ↗
08/31/2026B00493454-I1Open ↗
08/31/2026B00491962-I1Open ↗
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis.2
08/31/2026B00479261-I1Open ↗
08/13/2026B00491962-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/31/2026B00479261-I1Open ↗
▸Approvals, Objections & Sign-offs15
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter11
08/31/2026B00492698-I1Open ↗
08/31/2026B00493454-P3Open ↗
08/31/2026B00493454-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDEP Variance (V5) letter3
08/31/2026B00492698-I1Open ↗
08/31/2026B00493454-I1Open ↗
08/31/2026B00491962-I1Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
09/21/2020301493355Open ↗