← Back
One story retail building
190 WEST 231 STREET
BRONX · Kingsbridge-Marble Hill · BIN 2016124
💬 Discuss this project
1925Year Built
1Stories
K1Building Class
R6Zoning
11,520 sfGross Floor Area
2Units
0 Open Violations
One story retail building · Owner of record: 231ST RIVERDALE LLC · 8,250 sf lot · 1.4 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanical
Roof4p · 3 filings · 20 docs
Floor 13p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ACHS MANAGMENT3007/08/2026
DUANE READE INC303/22/2026
231 ST RIVERDALE LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARC CONSULTING ENGINEERS106/10/2025
SQUARE ARCH, LLC102/02/2025
HUAN DESIGN INC.101/12/2025
NATIONAL ENGINEERING, LTD412/07/2023
A2 ARCHITECT, PC403/15/2022
CONCEPT DESIGN GROUP201/06/2022
CCPE106/29/2021
HBC ARCHITECTS106/28/2021
HC ARCHITECT, PC106/24/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J A EXPEDITING2003/21/2026
JP EXPEDITE203/21/2026
H Z BUILDING CONSULTING603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ACTION CONSTRUCTION MGMTGeneral Contractor707/08/2026
WATSON'S PLBG, HTG, & BDGPlumbing507/08/2026
J. CAIAZZO PLBG & HTG CORPFire Protection207/08/2026
J. CAIAZZO PLBG & HTG CORPlumbing207/08/2026
OM ELECTRIC, INCElectrical103/22/2026
SIGNS CADScaffold107/08/2026
KALE CONSTRUCTION INCGeneral Contractor107/08/2026
SIENIA CONSTRUCTION INCGeneral Contractor107/08/2026
INPRO PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ARC CONSULTING ENGINEERS,4083106/10/2025
HUAN DESIGN INC7669202/02/2025
WALTER T. GORMAN, P.E., P268412/07/2023
A2 ARCHITECT, PC2504403/15/2022
CDG ARCHITECTS LLC /DBA:1327201/06/2022
Building Lifecycle
All (110)Filed (16)Permit Issued (12)Signed Off (9)Violation (24)Inspection (19)Special Inspection (30)
05/01/2026
Signed off — Alteration
INTERIOR RENOVATION ERECT MINOR WALL PARTITION & INSTALL COOKING EQUIPMENT AND PLUMBING FIXTURES AT THE 1ST. FLOOR. NO CHANGE IN USE, OCCUPANCY & EGRESS.
X01157995-I1
01/19/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/12/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/07/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/07/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/05/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/10/2025
Filed — Alteration
INTERIOR RENOVATION ERECT MINOR WALL PARTITION & INSTALL COOKING EQUIPMENT AND PLUMBING FIXTURES AT THE 1ST. FLOOR. NO CHANGE IN USE, OCCUPANCY & EGRESS.
X01157995-P1
06/05/2025
Special inspection requirement — Energy Code Compliance Inspections
JAN PEREZ
06/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAN PEREZ
04/10/2025
Permit issued — Plumbing
X01157995-I1-PL
02/10/2025
Permit issued — General Construction
X01156065-I1-GC
02/02/2025
Filed — Alteration
INTERIOR RENOVATION ERECT MINOR WALL PARTITION & INSTALL COOKING EQUIPMENT AND PLUMBING FIXTURES AT THE 1ST. FLOOR. NO CHANGE IN USE, OCCUPANCY & EGRESS.
X01157995-I1
01/12/2025
Filed — Alteration
X01156065-I1
01/26/2024
Signed off — Alteration
HEREBY FILING FOR THE INSTALLATION OF MECHANICAL EQUIPMENT. NO CHANGE TO USE OCCUPANCY OR EGRESS
X00528846-I1
12/08/2023
Special inspection requirement — HVAC-R and service water heating equipment
Abbas Family
12/08/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Abbas Family
12/08/2023
Special inspection requirement — Maintenance information
Abbas Family
12/08/2023
Special inspection requirement — Electrical motors and elevators
Abbas Family
12/08/2023
Special inspection requirement — Mechanical Systems
Abbas Family
12/08/2023
Special inspection requirement — Final
Abbas Family
12/08/2023
Special inspection requirement — Energy Code Compliance Inspections
Abbas Family
12/08/2023
Special inspection requirement — HVAC-R and service water heating system controls
Abbas Family
12/07/2023
Filed — Alteration
HEREBY FILING FOR THE INSTALLATION OF MECHANICAL EQUIPMENT. NO CHANGE TO USE OCCUPANCY OR EGRESS
X00528846-P1
12/01/2022
Signed off — Alteration
HEREBY FILING FOR THE INSTALLATION OF PLUMBING FIXTURES. NO CHANGE TO USE OCCUPANCY OR EGRESS
X00528853-I1
11/30/2022
Signed off — Alteration
HEREBY FILING FOR INSTALLATION OF SPRINKLER HEADS. NO CHANGE TO USE OCCUPANCY OR EGRESS
X00528860-I1
10/04/2022
Signed off — Alteration
modify existing gas piping. Install new meter and piping to split existing HVAC units.
X00634852-I1
09/09/2022
Signed off — Alteration
HEREBY FILING TENANT INTERIOR AND EXTERIOR ALTERATION. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
X00528845-I1
07/21/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/18/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/13/2022
Signed off — Alteration
Installation of partitions and vent fan for new bathroom. No change in use, egress or occupancy.
X00645170-I1
04/13/2022
Signed off — Alteration
Installation of bathroom fixtures for new bathroom. No change in use, egress or occupancy.
X00645239-I1
03/29/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/15/2022
Filed — Alteration
Installation of partitions and vent fan for new bathroom. No change in use, egress or occupancy.
X00645170-P1
03/15/2022
Filed — Alteration
Installation of bathroom fixtures for new bathroom. No change in use, egress or occupancy.
X00645239-P1
03/15/2022
Special inspection requirement — Final
Ann Macklin
03/15/2022
Special inspection requirement — Lighting in dwelling units
Ann Macklin
03/15/2022
Special inspection requirement — Energy Code Compliance Inspections
Ann Macklin
03/15/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ann Macklin
03/15/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ann Macklin
03/15/2022
Special inspection requirement — Mechanical Systems
Ann Macklin
02/23/2022
Special inspection requirement — Final
Ann Macklin
02/23/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ann Macklin
02/23/2022
Special inspection requirement — Mechanical Systems
Ann Macklin
02/23/2022
Special inspection requirement — Energy Code Compliance Inspections
Ann Macklin
02/23/2022
Special inspection requirement — Lighting in dwelling units
Ann Macklin
02/23/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ann Macklin
02/02/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/27/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/21/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
01/20/2022
Permit issued — Plumbing
X00645239-I1-PL
01/12/2022
Permit issued — General Construction
X00645170-I1-GC-CX
01/11/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/10/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Yongho Kim
01/07/2022
Filed — Alteration
Installation of partitions and vent fan for new bathroom. No change in use, egress or occupancy.
X00645170-I1
01/07/2022
Filed — Alteration
Installation of bathroom fixtures for new bathroom. No change in use, egress or occupancy.
X00645239-I1
01/06/2022
Filed — Alteration
modify existing gas piping. Install new meter and piping to split existing HVAC units.
X00634852-P1
12/30/2021
Permit issued — Sprinklers
X00528860-I1-EW-SP
12/27/2021
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
12/16/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/10/2021
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
Latest 60 of 110 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offWATSON'S PLBG, HTG, & BDG04/10/2025
DOB NOWGeneral ConstructionPermit IssuedKALE CONSTRUCTION INC02/10/2025
DOB NOWPlumbingSigned-offINPRO PLUMBING CORP01/20/2022
DOB NOWGeneral ConstructionSigned-offSIENIA CONSTRUCTION INC01/12/2022
DOB NOWSprinklersSigned-offANTHONY CAIAZZO12/30/2021
DOB NOWPlumbingSigned-offJ. CAIAZZO PLBG & HTG COR12/01/2021
DOB NOWGeneral ConstructionSigned-offACTION CONSTRUCTION MGMT10/14/2021
DOB NOWMechanical SystemsSigned-offACTION CONSTRUCTION MGMT10/14/2021
DOB NOWSprinklersSigned-offANTHONY CAIAZZO07/26/2021
DOB NOWPlumbingSigned-offJ. CAIAZZO PLBG & HTG COR07/26/2021
DOB NOWGeneral ConstructionSigned-offACTION CONSTRUCTION MGMT07/09/2021
DOB NOWSignSigned-offSIGNS CAD CORP06/24/2021
BISOTISSUEDDABOCO INC. & DUANE READE INC.03/12/1998
BIS—ISSUEDUNIVERSAL UNLIMITED12/15/1993
BISPLISSUEDJAY MARCO PLG. & HTG. CORP.11/10/1993
BISEQISSUEDONE-TECH INC.09/08/1993
BISOTISSUEDONE-TECH INC.09/08/1993
BISMHISSUEDHOLMES MECHANICAL CORP.04/16/1991
BISEQISSUEDR. C. STOREFRONTS08/30/1990
BISOTISSUEDR. C. STOREFRONTS08/30/1990
5 projects · most recent 11/29/2021
General Wiring
FiledStatusContractorScope
11/29/2021CompleteFISHER ELECL CONTNG LLCGeneral Wiring
11/23/2021Permit IssuedHIGH LEG 208 VOLTS ELECLGeneral Wiring
11/08/2021CompleteOM ELECTRIC, INCGeneral Wiring
08/12/2021CompleteSIGNS CAD CORP—
02/04/2021CompleteOM ELECTRIC, INCGeneral Wiring
▾Field Inspections (DOB CAP) — 19
DateTypeResultReport
01/19/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/12/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/07/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/07/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/05/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/21/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/18/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/29/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/02/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/27/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/21/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
01/11/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/27/2021No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
12/16/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/10/2021Fail-Final PL - Up to 3 Requested FloorsFailView ↗
12/10/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/21/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/16/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/16/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 41
DateRequirementInspectorRole
06/05/2025Energy Code Compliance InspectionsJAN PEREZprogress
06/05/2025Fire-Resistant Penetrations and JointsJAN PEREZspecial
12/08/2023HVAC-R and service water heating equipmentAbbas Familyenergy_progress
12/08/2023HVAC-R and service water piping design and insulationAbbas Familyenergy_progress
12/08/2023Maintenance informationAbbas Familyenergy_progress
12/08/2023Electrical motors and elevatorsAbbas Familyenergy_progress
12/08/2023Mechanical SystemsAbbas Familyspecial
12/08/2023FinalAbbas Familyprogress
12/08/2023Energy Code Compliance InspectionsAbbas Familyprogress
12/08/2023HVAC-R and service water heating system controlsAbbas Familyenergy_progress
03/15/2022FinalAnn Macklinprogress
03/15/2022Lighting in dwelling unitsAnn Macklinenergy_progress
03/15/2022Energy Code Compliance InspectionsAnn Macklinprogress
03/15/2022Fire-Resistant Penetrations and JointsAnn Macklinspecial
03/15/2022Fire-Resistant Penetrations and JointsAnn Macklinspecial
03/15/2022Mechanical SystemsAnn Macklinspecial
02/23/2022FinalAnn Macklinprogress
02/23/2022Fire-Resistant Penetrations and JointsAnn Macklinspecial
02/23/2022Mechanical SystemsAnn Macklinspecial
02/23/2022Energy Code Compliance InspectionsAnn Macklinprogress
02/23/2022Lighting in dwelling unitsAnn Macklinenergy_progress
02/23/2022Fire-Resistant Penetrations and JointsAnn Macklinspecial
01/10/2022Fire-Resistant Penetrations and JointsYongho Kimspecial
12/03/2021Electrical motors and elevatorsAbbas Familyenergy_progress
12/03/2021HVAC-R and service water heating equipmentAbbas Familyenergy_progress
Latest 25 of 41.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Chipotle Mexican GrillRestaurant / Food ServiceFloor 1, Roof
Project X00528846 Alteration · LOC Issued · 06/29/2021
Project X00528853 Alteration · LOC Issued · 06/29/2021
Project X00528860 Alteration · LOC Issued · 06/29/2021
Project X00528845 Alteration · LOC Issued · 06/28/2021
Project X00528754 Alteration · LOC Issued · 06/24/2021
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 86 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
08/25/2026X00528754-I1Request digital key ↗
08/25/2026X00528845-I1Request digital key ↗
08/25/2026X00528860-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸Seals & Professional Certifications56
▸DOB NOWProgress Inspector Seal & Signature29
09/01/2026X01157995-P1Open ↗
09/01/2026X00645170-P1Open ↗
09/01/2026X00645170-P1Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature15
08/25/2026X00528754-I1Open ↗
08/25/2026X00528845-I1Open ↗
08/25/2026X00528860-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/01/2026X01157995-P1Open ↗
09/01/2026X00645170-P1Open ↗
09/01/2026X00645170-P1Open ↗
Showing 3 of 12 on file for this type
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
08/25/2026X00528754-I1Open ↗
08/25/2026X00528845-I1Open ↗
08/25/2026X00528860-I1Open ↗
Showing 3 of 13 on file for this type
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis3
08/13/2026X00528846-I1Open ↗
08/13/2026X00645170-I1Open ↗
08/13/2026X00528845-I1Open ↗