← Back
Community center
Sephardic Community Center
1901 OCEAN PARKWAY · Name © OpenStreetMap contributors · BIN 3190468
💬 Discuss this project
1981Year Built
4Stories
P5Building Class
R5Zoning
82,559 sfGross Floor Area
1Units
LL97 Covered0 Open ViolationsFDNY Report ↗
Community center · Owner of record: SEPHARDIC COMMUNITY YOUTH CENTER, INC. · 34,525 sf lot · 2.39 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction10p · 5 filings · 20 docs
Floor 43p · 2 filings · 10 docs
Floor 3
Floor 2
Floor 1
Cellar5p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BREEZE NAT'L INC103/22/2026
SEPHARDIC103/21/2026
RTP REALTY203/21/2026
1901 OCEAN PARKWAY403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NEWTEC ENGINEERING206/25/2026
ETRECTE LLC104/01/2026
AHT ENGINEERING PLLC202/20/2026
JOSEPH BOTTA, PE, PC411/11/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STELLMAR PLBG & MECH.CORPPlumbing207/08/2026
BROOKLYN SOLAR PARTNERSGeneral Contractor107/08/2026
EMCOR SERVICES NY/NJ INCGeneral Contractor107/08/2026
DUAL FUEL PLUBING & HTINGPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
OBAID MIAN849106/12/2026
ETRECTE LLC8116104/01/2026
JOSEPH BOTTA, PE, PC1139411/11/2023
Building Lifecycle
All (89)Filed (9)Permit Issued (5)Violation (60)Inspection (4)Objection (11)
07/17/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/26/2026
Permit issued — Plumbing
B01418411-I1-PL
06/25/2026
Filed — Alteration
Reconnect gas piping to (4) gas fired chillers on the roof. The mechanical systems filing for chillers replacement filed and approved under job#B01403498-I1. No change in use egress and occupancy.
B01418411-I1
06/12/2026
Filed — Alteration
Direct replacement of (4) chillers on the roof on existing steel dunnage. All existing duct work to remain. No change in use egress and occupancy.
B01403498-I1
06/12/2026
Permit issued — Mechanical Systems
B01403498-I1-MS
04/16/2026
Permit issued — Solar
B01236167-I1-SL
04/07/2026
Objection resolved — Resolved
04/07/2026
Objection resolved — Resolved
04/01/2026
Filed — Alteration
INSTALLATION OF SOLAR PV SYSTEM ON THE EXISITNG ROOFTOP. NO CHANGES TO THE EGRESS, USE OR OCCUPANCY.
B01236167-I1
04/01/2026
Objection resolved — Resolved
04/01/2026
Objection resolved — Resolved
03/09/2026
Objection raised — Fire_Protection
03/09/2026
Objection raised — Admin
03/09/2026
Objection raised — Plumbing
03/09/2026
Objection raised — Fire_Protection
03/09/2026
Objection raised — Admin
03/09/2026
Objection raised — Cost
03/09/2026
Objection raised — Scope
02/20/2026
Filed — Alteration CO
B01326844-I1
11/11/2023
Filed — Alteration
Installation of two boilers for domestic hot water, one in cellar mechanical room one in rooftop mechanical room. No change in use, occupancy or egress.
B00888521-P2
10/31/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
10/30/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/27/2023
Filed — Alteration
Installation of two boilers for domestic hot water, one in cellar mechanical room one in rooftop mechanical room. No change in use, occupancy or egress.
B00888521-P1
10/11/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
08/30/2023
Filed — Alteration CO
B00926494-I1
07/27/2023
Permit issued — Plumbing
B00888521-S1-PL
07/27/2023
Permit issued — Boiler Equipment
B00888521-I1-BE
06/22/2023
Filed — Alteration
Installation of two boilers for domestic hot water, one in cellar mechanical room one in rooftop mechanical room. No change in use, occupancy or egress.
B00888521-S1
06/19/2023
Filed — Alteration
Installation of two boilers for domestic hot water, one in cellar mechanical room one in rooftop mechanical room. No change in use, occupancy or egress.
B00888521-I1
12/01/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/02/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/02/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/01/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/02/2021
Violation issued (FDNY_NOV, closed)
10/27/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/26/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/26/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/29/2021
Violation issued (ECB, closed)
Elevators
07/29/2021
Violation issued (ECB, closed)
Elevators
07/29/2021
Violation issued (ECB, closed)
Elevators
11/09/2020
Violation issued (FDNY_NOV, closed)
03/05/2020
Violation issued (FDNY_NOV, closed)
06/21/2019
Violation issued (FDNY_NOV, closed)
05/20/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/20/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/05/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/05/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/05/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/05/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/14/2018
Violation issued (ECB, closed)
Plumbing
08/14/2018
Violation issued (ECB, closed)
Plumbing
05/10/2017
Violation issued (ECB, closed)
Construction
05/30/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/30/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/03/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/01/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/28/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/28/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/31/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/31/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 89 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedDUAL FUEL PLUBING & HTING06/26/2026
DOB NOWMechanical SystemsPermit IssuedEMCOR SERVICES NY/NJ INC06/12/2026
DOB NOWSolarPermit IssuedBROOKLYN SOLAR PARTNERS04/16/2026
DOB NOWPlumbingPermit IssuedSTELLMAR PLBG & MECH.CORP07/27/2023
DOB NOWBoiler EquipmentPermit IssuedSTELLMAR PLBG & MECH.CORP07/27/2023
BISOTISSUEDBEST ENERGY POWER LLC05/25/2012
BISOTISSUEDBKSK ARCHITECTS LLP03/14/2011
BISOTISSUEDEMPIRE & R GENERAL CONSTR03/23/2010
BISPLISSUEDJ.E.S. PLBG & HTG CORP01/06/2010
BISSPISSUEDA & F FIRE PROTECTION CO05/11/2009
BISEQISSUEDE.W. HOWELL CO, LLC10/02/2008
BIS—ISSUEDE.W. HOWELL CO, LLC10/02/2008
BISSDISSUEDA & F FIRE PROTECTION CO05/12/2008
BISEQISSUEDE.W. HOWELL CO, LLC01/02/2008
BISOTISSUEDAPPROVED OIL CO BROOKLYN12/18/2007
BISPLISSUEDJ.E.S. PLBG & HTG CORP12/13/2007
BIS—ISSUEDE.W. HOWELL CO, LLC10/11/2007
BISEQISSUEDE.W. HOWELL CO, LLC10/11/2007
BISSDISSUEDA & F FIRE PROTECTION CO04/30/2007
BISEQISSUEDREGIONAL SCAFF. & HOIS.CO INC01/04/2007
BISPLISSUEDJ.E.S. PLBG & HTG CORP12/19/2006
BIS—ISSUEDE.W. HOWELL CO, LLC10/02/2006
BISEQISSUEDE.W. HOWELL CO, LLC10/02/2006
BIS—ISSUEDE.W. HOWELL CO, LLC05/19/2006
BIS—ISSUEDE.W. HOWELL CO, LLC04/24/2006
BIS—ISSUEDE.W. HOWELL CO, LLC04/24/2006
BISEQISSUEDE.W. HOWELL CO, LLC04/24/2006
BIS—ISSUEDE.W. HOWELL CO, LLC04/24/2006
BIS—ISSUEDE.W. HOWELL CO, LLC04/24/2006
BISEQISSUEDE.W. HOWELL CO, LLC04/11/2006
BISEQISSUEDBARR & BARR INC07/28/2004
BISEQISSUEDBARR & BARR INC07/28/2004
BISEQISSUEDBARR & BARR INC06/30/2003
BISEQISSUEDBARR & BARR INC01/23/2002
BISEQISSUEDBARR & BARR INC01/23/2002
BIS—ISSUEDBREEZE NATIONAL INC06/01/2001
BIS—ISSUEDBREEZE NATIONAL INC06/01/2001
BISEQISSUEDBREEZE NATIONAL INC06/01/2001
BIS—ISSUEDBREEZE NATIONAL INC03/27/2001
BIS—ISSUEDBREEZE NATIONAL INC03/27/2001
+ 2 more permits on file
1 project · most recent 06/12/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/12/2026Permit IssuedEMCOR SERVICES NY/NJ INCHeating and Air Conditioning Systems
Heat / Cool
Yazaki CH-K100 1,200,000 BTU · Chiller ×4
2 projects · most recent 06/25/2026
Gas
FiledStatusContractorScope
06/25/2026Permit IssuedDUAL FUEL PLUBING & HTINGGas
11/11/2023Permit IssuedSTELLMAR PLBG & MECH.CORPGas
1 project · most recent 04/21/2025
FiledStatusContractorScope
04/21/2025Permit IssuedBERGER QUALITY ELEC'L CON—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
07/17/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/31/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
10/30/2023Pass-Final CND-Occupancy InspectionPassView ↗
10/11/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
05/18/2026Mechanical SystemsObaid Mianspecial
05/18/2026HVAC-R and service water piping design and insulationObaid Mianenergy_progress
05/18/2026Maintenance informationObaid Mianenergy_progress
05/18/2026HVAC-R and service water heating system controlsObaid Mianenergy_progress
05/18/2026HVAC-R and service water heating equipmentObaid Mianenergy_progress
05/18/2026FinalObaid Mianprogress
11/14/2023Maintenance informationJOSEPH BOTTAenergy_progress
11/14/2023Post-installed AnchorsJOSEPH BOTTAspecial
11/14/2023HVAC-R and service water piping design and insulationJOSEPH BOTTAenergy_progress
11/14/2023HVAC-R and service water heating system controlsJOSEPH BOTTAenergy_progress
11/14/2023HVAC-R and service water heating equipmentJOSEPH BOTTAenergy_progress
10/18/2023Post-installed AnchorsJOSEPH BOTTAspecial
10/18/2023HVAC-R and service water heating equipmentJOSEPH BOTTAenergy_progress
10/18/2023HVAC-R and service water piping design and insulationJOSEPH BOTTAenergy_progress
10/18/2023HVAC-R and service water heating system controlsJOSEPH BOTTAenergy_progress
10/18/2023Maintenance informationJOSEPH BOTTAenergy_progress
06/12/2023HVAC-R and service water heating system controlsJOSEPH BOTTAenergy_progress
06/12/2023HVAC-R and service water heating equipmentJOSEPH BOTTAenergy_progress
06/12/2023HVAC-R and service water piping design and insulationJOSEPH BOTTAenergy_progress
06/12/2023Maintenance informationJOSEPH BOTTAenergy_progress
06/12/2023Fire-Resistant Penetrations and JointsJOSEPH BOTTAspecial
▾Documents — 198 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/26/2026B00926494-I1Request digital key ↗
08/26/2026B00888521-S1Request digital key ↗
08/26/2026B00888521-P2Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits38
▸BISPLAN / WORK APPROVAL APPLICATION17
08/07/2023321527353Open ↗
03/20/2017321527353Open ↗
04/08/2013320373779Open ↗
Showing 3 of 17 on file for this type
▸BISPLACE OF ASSEMBLY11
06/10/2016302401452Open ↗
06/08/2016302401416Open ↗
06/08/2016302401452Open ↗
Showing 3 of 11 on file for this type
▸BISWORK PERMIT APPLICATION8
05/29/2012320373779Open ↗
03/15/2011310161062Open ↗
03/23/2010320133663Open ↗
Showing 3 of 8 on file for this type
▸BISPLACE OF ASSEMBLY APPLICATION2
09/18/2009320065638Open ↗
09/18/2009320065521Open ↗
▸Seals & Professional Certifications54
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION20
03/29/2017321527353Open ↗
03/20/2017321527353Open ↗
03/11/2011310161062Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWProgress Inspector Seal & Signature17
09/23/2026B00888521-I1Open ↗
09/23/2026B00888521-I1Open ↗
09/23/2026B00888521-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/26/2026B00926494-I1Open ↗
08/26/2026B00888521-P2Open ↗
08/26/2026B00888521-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/23/2026B00888521-I1Open ↗
08/28/2026B01403498-I1Open ↗
08/24/2026B00888521-S1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
03/23/2010320133663Open ↗
02/15/2008310092324Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
03/23/2010320133663Open ↗
02/15/2008310092324Open ↗
▸BISPC FULL REPORT1
02/15/2008310092324Open ↗
▸Trade Schedules & Equipment6
▸BISFA - FDNY APPROVAL : FD-FAA2
08/17/2010310130621Open ↗
08/17/2010310130649Open ↗
▸BISSCHEDULE B - PLUMBING1
04/14/2009320000716Open ↗
▸BISSPRINKLER INSP REPORT : FP-851
09/22/2009320000716Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
09/22/2009320000716Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
11/27/2007310055613Open ↗
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/13/2026B00926494-I1Open ↗
08/13/2026B01326844-I1Open ↗
▸Environmental & Asbestos14
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'6
04/14/2009320000716Open ↗
04/22/2008310130621Open ↗
04/22/2008310130649Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER4
03/20/2017321527353Open ↗
04/09/2012320373779Open ↗
10/14/2009320081077Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/26/2026B00888521-P2Open ↗
08/26/2026B00888521-P1Open ↗
08/26/2026B00888521-S1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance5
▸BISTR8: Energy Code Progress Inspections2
02/26/2013320373779Open ↗
04/27/2012320373779Open ↗
▸BISSOLAR TAX ABATEMENT APPLICATION (PTA4)2
02/27/2013320373779Open ↗
04/09/2012320373779Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
03/20/2017321527353Open ↗
▸Inspections & Test Reports2
▸BISHYDRO FLOW TEST LETTER1
04/15/2009320000716Open ↗
▸BISLetter to Change Work Order (Prior to Inspection)1
01/26/2011320065647Open ↗
▸Approvals, Objections & Sign-offs39
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST12
03/15/2011310161062Open ↗
03/11/2011310161062Open ↗
12/02/2010320133663Open ↗
Showing 3 of 12 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION11
02/26/2013320373779Open ↗
03/11/2011310161062Open ↗
01/26/2011320065647Open ↗
Showing 3 of 11 on file for this type
▸BISADMINISTRATIVE OBJECTIONS8
03/23/2010320133663Open ↗
10/14/2009320081077Open ↗
04/14/2009320000716Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter7
08/16/2026B01403498-I1Open ↗
08/13/2026B00888521-P2Open ↗
08/13/2026B00888521-I1Open ↗
Showing 3 of 7 on file for this type
▸BISUtility Company PV System Interconnection Acknowledgement Letter1
02/26/2013320373779Open ↗
▸Cost, Insurance & Ownership15
▸BISCOST AFFIDAVIT15
03/20/2017321527353Open ↗
02/26/2013320373779Open ↗
04/27/2012320373779Open ↗
Showing 3 of 15 on file for this type
▸Filing & Intake Forms11
▸BISEFILING COVER SHEET6
03/20/2017321527353Open ↗
03/23/2010320133663Open ↗
10/14/2009320081077Open ↗
Showing 3 of 6 on file for this type
▸BISADDITIONAL INFORMATION3
09/05/2017321527353Open ↗
05/15/2012320373779Open ↗
02/23/2010320065638Open ↗
▸BISeFiling Job Application Cover Sheet2
04/09/2012320373779Open ↗
06/02/2008310130649Open ↗
▸Other Documents4
▸DOB NOWProperty Ownership Certification2
08/26/2026B00926494-I1Open ↗
08/15/2026B01326844-I1Open ↗
▸BISTax Abatement Miscellaneous1
02/27/2013320373779Open ↗
▸BISFIRE SUPP ANSUL APPROVL- FD-FSS1
11/15/2010320081077Open ↗