← Back
BuildNYC
Large suburban residence
1903 EAST 5TH STREET
BROOKLYN · BIN 3178680
💬 Discuss this project
1920Year Built
2.5Stories
A3Building Class
R2XZoning
3,950 sfGross Floor Area
1Units
Large suburban residence · Owner of record: Ezra Saul Ashkenazi 2002 Descendants Tru St · 4,000 sf lot · 0.99 FAR built · Flood zone X
Locations of Work
StructuralPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 33p · 2 filings · 20 docs
Floor 23p · 2 filings · 20 docs
Floor 13p · 2 filings · 20 docs
Cellar3p · 1 filing · 20 docs
Site & exteriorFence installation1p · 1 filing · 2 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/27/2021$5.5M—Private party → EZRA SAUL ASHKENAZI 2002 DESCENDANTS TRUST$1,390/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Bohn Architecture and Design808/28/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Code and Zoning Representative1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
M.N.C. General ContractorsScaffold407/08/2026
M.N.C. General ContractorsGeneral Contractor307/08/2026
Ness Mechanical P & HPlumbing207/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
City-Wide Testing416508/28/2026
BGM Engineering1514208/17/2023
Building Lifecycle
All (37)Filed (8)Permit Issued (8)Signed Off (2)Inspection (5)Special Inspection (14)
08/28/2026
Filed — Alteration
REMOVEAND INSTALL PLUMBING FIXTURES
B00875801-P4
08/26/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ELIAS RASABI
08/25/2026
Special inspection requirement — Energy Code Compliance Inspections
ELIAS RASABI
08/12/2026
Signed off — Alteration
PROPOSED INTERIOR DEMOLITION INCLUDING REMOVAL OF DAMAGED FLOORS, PARTITIONS WALLS. REPLACE WINDOWS
B00875783-I1
08/12/2026
Signed off — Alteration
B00861004-I1
08/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ELIAS RASABI
08/12/2026
Special inspection requirement — Energy Code Compliance Inspections
ELIAS RASABI
08/10/2026
Filed — Alteration
REMOVEAND INSTALL PLUMBING FIXTURES
B00875801-P3
08/06/2026
Special inspection requirement — Energy Code Compliance Inspections
ELIAS RASABI
08/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ELIAS RASABI
07/21/2026
Permit issued — Plumbing
B00875801-I1-PL
07/06/2026
Filed — Alteration
REMOVEAND INSTALL PLUMBING FIXTURES
B00875801-P2
12/15/2025
Permit issued — Construction Fence
B00861004-I1-FN
12/15/2025
Permit issued — Structural
B00875783-I1-GC-CX
05/20/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/30/2024
Permit issued — Structural
B00875783-I1-GC-CX
12/03/2024
Filed — Alteration
REMOVEAND INSTALL PLUMBING FIXTURES
B00875801-P1
11/15/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/15/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/04/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/30/2024
Permit issued — Plumbing
B00875801-I1-PL
05/29/2024
Permit issued — Construction Fence
B00861004-I1-FN
04/23/2024
Filed — Alteration
REMOVEAND INSTALL PLUMBING FIXTURES
B00875801-I1
08/17/2023
Filed — Alteration
PROPOSED INTERIOR DEMOLITION INCLUDING REMOVAL OF DAMAGED FLOORS, PARTITIONS WALLS. REPLACE WINDOWS
B00875783-P1
08/17/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
RAUL VELASQUEZ MARTINEZ
08/17/2023
Special inspection requirement — Structural Cold-Formed Steel
RAUL VELASQUEZ MARTINEZ
08/17/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
RAUL VELASQUEZ MARTINEZ
08/17/2023
Special inspection requirement — Final
RAUL VELASQUEZ MARTINEZ
08/15/2023
Special inspection requirement — Structural Cold-Formed Steel
08/15/2023
Special inspection requirement — Final
RAUL VELASQUEZ MARTINEZ
08/15/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
RAUL VELASQUEZ MARTINEZ
08/15/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
RAUL VELASQUEZ MARTINEZ
07/05/2023
Permit issued — Structural
B00875783-I1-GC-CX
06/08/2023
Filed — Alteration
PROPOSED INTERIOR DEMOLITION INCLUDING REMOVAL OF DAMAGED FLOORS, PARTITIONS WALLS. REPLACE WINDOWS
B00875783-I1
05/31/2023
Permit issued — Construction Fence
B00861004-I1-FN
04/18/2023
Filed — Alteration
B00861004-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedNess Mechanical P & H07/21/2026
DOB NOWConstruction FenceSigned-offMNC General Contracting12/15/2025
DOB NOWStructuralSigned-offMNC General Contracting12/15/2025
DOB NOWStructuralSigned-offMNC General Contracting12/30/2024
DOB NOWPlumbingPermit IssuedNess Mechanical P & H05/30/2024
DOB NOWConstruction FenceSigned-offMNC General Contracting05/29/2024
DOB NOWStructuralSigned-offMNC General Contracting07/05/2023
DOB NOWConstruction FenceSigned-offMNC General Contracting05/31/2023
1 project · most recent 08/28/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/28/2026Permit IssuedNess Mechanical P & HGas, Storm, Water/Sanitary
1 project · most recent 09/05/2023
General Wiring
FiledStatusContractorScope
09/05/2023Permit IssuedLens ElectricGeneral Wiring
1 project · most recent 08/17/2023
FiledStatusContractorScope
08/17/2023Signed-offMNC General Contracting2 scope_items
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
08/26/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/20/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/15/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/15/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/04/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
08/25/2026Fire-Resistant Penetrations and JointsELIAS RASABIspecial
08/25/2026Energy Code Compliance InspectionsELIAS RASABIprogress
08/12/2026Fire-Resistant Penetrations and JointsELIAS RASABIspecial
08/12/2026Energy Code Compliance InspectionsELIAS RASABIprogress
08/06/2026Energy Code Compliance InspectionsELIAS RASABIprogress
08/06/2026Fire-Resistant Penetrations and JointsELIAS RASABIspecial
08/17/2023Fire-Resistant Penetrations and JointsRAUL VELASQUEZ MARTINEZspecial
08/17/2023Structural Cold-Formed SteelRAUL VELASQUEZ MARTINEZspecial
08/17/2023Structural Stability – Alterations of existing buildingsRAUL VELASQUEZ MARTINEZspecial
08/17/2023FinalRAUL VELASQUEZ MARTINEZprogress
08/15/2023Structural Cold-Formed Steel—special
08/15/2023FinalRAUL VELASQUEZ MARTINEZprogress
08/15/2023Structural Stability – Alterations of existing buildingsRAUL VELASQUEZ MARTINEZspecial
08/15/2023Fire-Resistant Penetrations and JointsRAUL VELASQUEZ MARTINEZspecial
▾Documents — 32 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/27/2026B00861004-I1Request digital key ↗
08/27/2026B00875783-P1Request digital key ↗
08/27/2026B00875783-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications18
▸DOB NOWDPL-1: Design Professional Seal & Signature8
10/14/2026B00875801-P4Open ↗
08/27/2026B00861004-I1Open ↗
08/27/2026B00875783-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
10/14/2026B00875801-P4Open ↗
09/01/2026B00875801-P3Open ↗
08/29/2026B00875783-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
10/14/2026B00875801-P4Open ↗
09/01/2026B00875801-P3Open ↗
08/29/2026B00875783-I1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
10/14/2026B00875801-P4Open ↗
08/27/2026B00875783-I1Open ↗
08/27/2026B00875783-P1Open ↗
Showing 3 of 7 on file for this type