← Back
Walk-up cooperative
191-05 35 AVENUE
QUEENS · BIN 4119112
💬 Discuss this project
1932Year Built
3Stories
C6Building Class
R5BZoning
16,200 sfGross Floor Area
16Units
2 Open Violations ▸FDNY Report ↗
Walk-up cooperative · Owner of record: 35TH AVE TENANTS CORP · 10,000 sf lot · 1.62 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Floor 27p · 1 filing · 20 docs
Floor 17p · 1 filing · 20 docs
Cellar1p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
35TH AVE TENANTS CORP803/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Manetta architecture design pllc803/21/2026
NEW YORK ENGINEERING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GUARANTEED HOME IMPROVEMEGeneral Contractor303/21/2026
ROCCO BROS. CONSTRUCTIONGeneral Contractor203/21/2026
FULTON PLBG & HTG CORPPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW YORK ENGINEERING ASSO851208/03/2022
NEW AGE ENGINEERING PLLC7746105/31/2022
FRANK J. QUATELA, ARCHITE1632405/11/2022
Building Lifecycle
All (42)Filed (7)Permit Issued (5)Signed Off (2)Violation (3)Inspection (5)Special Inspection (20)
03/06/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/28/2023
Permit issued — Plumbing
Q00687196-S1-PL
09/28/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/28/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/06/2022
Signed off — Alteration
REPLACE BOILER AND REINSTALL EXISTING OIL BURNER.
Q00715466-I1
08/23/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
08/05/2022
Special inspection requirement — Heating Systems
LOUIS ARENA
08/05/2022
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
08/05/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
08/05/2022
Special inspection requirement — Maintenance information
LOUIS ARENA
08/05/2022
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
08/03/2022
Filed — Alteration
REPLACE BOILER AND REINSTALL EXISTING OIL BURNER.
Q00715466-P1
07/19/2022
Signed off — Alteration
INSTALL NEW CHIMNEY LINER AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00741107-I1
06/13/2022
Permit issued — Boiler Equipment
Q00715466-I1-BE
06/03/2022
Permit issued — Mechanical Systems
Q00741107-I1-MS
05/31/2022
Filed — Alteration
INSTALL NEW CHIMNEY LINER AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00741107-I1
05/20/2022
Filed — Alteration
REPLACE BOILER AND REINSTALL EXISTING OIL BURNER.
Q00715466-I1
05/18/2022
Special inspection requirement — Final
Stephen Shishko
05/18/2022
Special inspection requirement — Chimneys and vents
Stephen Shishko
05/18/2022
Special inspection requirement — Mechanical Systems
Stephen Shishko
05/12/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/11/2022
Filed — Alteration
INTERIOR RENOVATIONS AT UNIT N FIRST AND SECOND FLOOR TO INCLUDE FINISHES AND PARTITIONS. NO CHANGE TO THE USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00687196-P1
05/11/2022
Filed — Alteration
INTERIOR RENOVATIONS AT UNIT N FIRST AND SECOND FLOOR TO INCLUDE FINISHES AND PARTITIONS. NO CHANGE TO THE USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00687196-P2
05/11/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
FRANK QUATELA
05/11/2022
Special inspection requirement — Energy Code Compliance Inspections
FRANK QUATELA
05/11/2022
Special inspection requirement — Interior lighting power
FRANK QUATELA
05/11/2022
Special inspection requirement — Energy Code Compliance Inspections
FRANK QUATELA
05/11/2022
Special inspection requirement — Fire-Resistance Rated Construction
FRANK QUATELA
05/11/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
FRANK QUATELA
05/04/2022
Special inspection requirement — Fire-Resistance Rated Construction
FRANK QUATELA
05/04/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
FRANK QUATELA
05/04/2022
Special inspection requirement — Energy Code Compliance Inspections
FRANK QUATELA
05/04/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
FRANK QUATELA
05/04/2022
Special inspection requirement — Energy Code Compliance Inspections
FRANK QUATELA
05/04/2022
Special inspection requirement — Interior lighting power
FRANK QUATELA
04/28/2022
Permit issued — Plumbing
Q00687196-S1-PL
03/18/2022
Permit issued — General Construction
Q00687196-I1-GC
03/07/2022
Filed — Alteration
INTERIOR RENOVATIONS AT UNIT N FIRST AND SECOND FLOOR TO INCLUDE FINISHES AND PARTITIONS. NO CHANGE TO THE USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00687196-S1
03/03/2022
Filed — Alteration
INTERIOR RENOVATIONS AT UNIT N FIRST AND SECOND FLOOR TO INCLUDE FINISHES AND PARTITIONS. NO CHANGE TO THE USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00687196-I1
06/07/1994
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/19/1993
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/26/1988
Violation issued (FDNY_NOV, closed)
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedFULTON PLBG & HTG CORP02/28/2023
DOB NOWBoiler EquipmentSigned-offRANSHAW PLBG & HTG LLC06/13/2022
DOB NOWMechanical SystemsSigned-offGUARANTEED HOME IMPROVEME06/03/2022
DOB NOWPlumbingPermit IssuedFULTON PLBG & HTG CORP04/28/2022
DOB NOWGeneral ConstructionPermit IssuedROCCO BROS. CONSTRUCTION03/18/2022
BISPLISSUEDPLUMBING & HTG DOCTOR INC06/22/2007
BISOTISSUEDPIEDRA CUSTOM CABINETS05/31/2007
BISFBISSUEDRANSHAW PLBG & HTG LLC05/08/2006
BISOTISSUEDPETROLEUM TANK CLEANERS01/14/2000
BISOTISSUEDCOLUMBIA UTILTIES HEATING CORP04/07/1993
BISFBISSUEDCOLUMBIA UTILITIES HEATING CORP.09/04/1990
1 project · most recent 05/11/2022
Gas Water/Sanitary
FiledStatusContractorScope
05/11/2022Permit IssuedFULTON PLBG & HTG CORPGas, Water/Sanitary
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
03/06/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/28/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/28/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/23/2022Pass-Final Boiler Equipment InspectionPassView ↗
05/12/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
08/05/2022Heating SystemsLOUIS ARENAspecial
08/05/2022HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
08/05/2022HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
08/05/2022Maintenance informationLOUIS ARENAenergy_progress
08/05/2022HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
05/18/2022FinalStephen Shishkoprogress
05/18/2022Chimneys and ventsStephen Shishkospecial
05/18/2022Mechanical SystemsStephen Shishkospecial
05/11/2022Fire-Resistant Penetrations and JointsFRANK QUATELAspecial
05/11/2022Energy Code Compliance InspectionsFRANK QUATELAprogress
05/11/2022Interior lighting powerFRANK QUATELAenergy_progress
05/11/2022Energy Code Compliance InspectionsFRANK QUATELAprogress
05/11/2022Fire-Resistance Rated ConstructionFRANK QUATELAprogress
05/11/2022Fire-Resistant Penetrations and JointsFRANK QUATELAspecial
05/04/2022Fire-Resistance Rated ConstructionFRANK QUATELAprogress
05/04/2022Fire-Resistant Penetrations and JointsFRANK QUATELAspecial
05/04/2022Energy Code Compliance InspectionsFRANK QUATELAprogress
05/04/2022Fire-Resistant Penetrations and JointsFRANK QUATELAspecial
05/04/2022Energy Code Compliance InspectionsFRANK QUATELAprogress
05/04/2022Interior lighting powerFRANK QUATELAenergy_progress
▾Documents — 37 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/26/2026Q00687196-I1Request digital key ↗
08/26/2026Q00687196-P1Request digital key ↗
08/26/2026Q00687196-S1Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications22
▸DOB NOWProgress Inspector Seal & Signature8
09/23/2026Q00715466-I1Open ↗
09/01/2026Q00741107-I1Open ↗
08/31/2026Q00687196-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/26/2026Q00687196-I1Open ↗
08/26/2026Q00687196-P2Open ↗
08/26/2026Q00687196-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/23/2026Q00715466-I1Open ↗
09/01/2026Q00741107-I1Open ↗
09/01/2026Q00741107-I1Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/26/2026Q00687196-I1Open ↗
08/26/2026Q00687196-P2Open ↗
08/26/2026Q00687196-S1Open ↗
Showing 3 of 7 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026Q00715466-I1Open ↗