← Back
Zoned residential, not Manhattan
191-20 102 AVENUE
QUEENS · BIN 4504515
💬 Discuss this project
0Year Built
—Stories
V0Building Class
R2Zoning
0 sfGross Floor Area
0Units
0 Open ViolationsFDNY Report ↗
Zoned residential, not Manhattan · 4,206 sf lot · 0 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 7 docs
Floor 22p · 1 filing · 20 docs
Floor 1
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GREEN RIVER ENVIRONMENTAL ENGINEERI109/08/2025
NMI ARCHITECTURE, PLLC507/21/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MIGLIORE RESTORATION403/21/2026
NMI ARCHITECTURE PLLC603/21/2026
NY State Solar LLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MIGLIORE RESTORATION INCGeneral Contractor303/21/2026
NYSS LLCGeneral Contractor104/09/2026
INNOVATION PLUMBING LLCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GREEN RIVER ENVIRONMENTAL7841109/08/2025
NMI ARCHITECTURE, PLLC6825507/21/2023
ROBERT HANNA5589307/21/2023
Building Lifecycle
All (49)Filed (6)Permit Issued (3)Signed Off (3)Violation (1)Inspection (6)Special Inspection (30)
11/28/2025
Signed off — Alteration
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS.
Q01283903-I1
09/09/2025
Permit issued — Solar
Q01283903-I1-SL
09/08/2025
Filed — Alteration
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS.
Q01283903-I1
09/08/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
ROBERT MASONE
09/08/2025
Special inspection requirement — Air barrier - visual inspection
ROBERT MASONE
09/08/2025
Special inspection requirement — Final
ROBERT MASONE
09/08/2025
Special inspection requirement — Energy Code Compliance Inspections
ROBERT MASONE
09/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ROBERT MASONE
08/17/2023
Signed off — Alteration
THIS PROJECT IS FILED TO REPAIR FIRE DAMAGE ON 1ST & 2ND FLOOR, REPAIR THE CEILING, FLOOR FINISH, AND WALL AREAS IN SOME PARTS OF THE BUILDING, REPLACE DAMAGED WOOD JOISTS & HEADERS IN SOME AREAS, NO CHANGE OF USE, EGRESS OR OCCUPANCY
Q00727428-I1
08/16/2023
Signed off — Alteration
THIS APPLICATION IS FILED FOR PLUMBING WORK AT CELLAR, 1ST & 2ND FLOOR, IN CONJUNCTION WITH ALT-2 #Q00727428-I1. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
Q00784027-I1
08/16/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
08/04/2023
Special inspection requirement — Energy Code Compliance Inspections
NASHAT IBRAHIM
08/04/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
NASHAT IBRAHIM
08/04/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
ROBERT HANNA
08/04/2023
Special inspection requirement — Fenestration areas
NASHAT IBRAHIM
08/04/2023
Special inspection requirement — Fenestration air leakage
NASHAT IBRAHIM
08/04/2023
Special inspection requirement — Insulation placement and R values
NASHAT IBRAHIM
08/04/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
NASHAT IBRAHIM
08/04/2023
Special inspection requirement — Final
NASHAT IBRAHIM
08/04/2023
Special inspection requirement — Fire-Resistance Rated Construction
NASHAT IBRAHIM
07/21/2023
Filed — Alteration
THIS PROJECT IS FILED TO REPAIR FIRE DAMAGE ON 1ST & 2ND FLOOR, REPAIR THE CEILING, FLOOR FINISH, AND WALL AREAS IN SOME PARTS OF THE BUILDING, REPLACE DAMAGED WOOD JOISTS & HEADERS IN SOME AREAS, NO CHANGE OF USE, EGRESS OR OCCUPANCY
Q00727428-P2
07/07/2023
Special inspection requirement — Fenestration air leakage
NASHAT IBRAHIM
07/07/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
NASHAT IBRAHIM
07/07/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
ROBERT HANNA
07/07/2023
Special inspection requirement — Energy Code Compliance Inspections
NASHAT IBRAHIM
07/07/2023
Special inspection requirement — Final
NASHAT IBRAHIM
07/07/2023
Special inspection requirement — Fire-Resistance Rated Construction
NASHAT IBRAHIM
07/07/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
NASHAT IBRAHIM
07/07/2023
Special inspection requirement — Fenestration areas
NASHAT IBRAHIM
07/07/2023
Special inspection requirement — Insulation placement and R values
NASHAT IBRAHIM
06/30/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
06/09/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/06/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/25/2023
Filed — Alteration
THIS APPLICATION IS FILED FOR PLUMBING WORK AT CELLAR, 1ST & 2ND FLOOR, IN CONJUNCTION WITH ALT-2 #Q00727428-I1. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
Q00784027-P1
05/25/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
NASHAT IBRAHIM
05/25/2023
Special inspection requirement — Energy Code Compliance Inspections
NASHAT IBRAHIM
05/17/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
NASHAT IBRAHIM
05/17/2023
Special inspection requirement — Energy Code Compliance Inspections
NASHAT IBRAHIM
05/11/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
03/16/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/03/2023
Permit issued — Plumbing
Q00784027-I1-PL
02/17/2023
Filed — Alteration
THIS APPLICATION IS FILED FOR PLUMBING WORK AT CELLAR, 1ST & 2ND FLOOR, IN CONJUNCTION WITH ALT-2 #Q00727428-I1. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
Q00784027-I1
01/19/2023
Filed — Alteration
THIS PROJECT IS FILED TO REPAIR FIRE DAMAGE ON 1ST & 2ND FLOOR, REPAIR THE CEILING, FLOOR FINISH, AND WALL AREAS IN SOME PARTS OF THE BUILDING, REPLACE DAMAGED WOOD JOISTS & HEADERS IN SOME AREAS, NO CHANGE OF USE, EGRESS OR OCCUPANCY
Q00727428-P1
01/19/2023
Special inspection requirement — Fenestration air leakage
NASHAT IBRAHIM
01/19/2023
Special inspection requirement — Fire-Resistance Rated Construction
NASHAT IBRAHIM
01/19/2023
Special inspection requirement — Final
NASHAT IBRAHIM
09/09/2022
Permit issued — Structural
Q00727428-I1-GC-CX
07/13/2022
Filed — Alteration
THIS PROJECT IS FILED TO REPAIR FIRE DAMAGE ON 1ST & 2ND FLOOR, REPAIR THE CEILING, FLOOR FINISH, AND WALL AREAS IN SOME PARTS OF THE BUILDING, REPLACE DAMAGED WOOD JOISTS & HEADERS IN SOME AREAS, NO CHANGE OF USE, EGRESS OR OCCUPANCY
Q00727428-I1
03/15/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offNYSS LLC09/09/2025
DOB NOWPlumbingSigned-offINNOVATION PLUMBING LLC03/03/2023
DOB NOWStructuralSigned-offMIGLIORE RESTORATION INC09/09/2022
1 project · most recent 09/08/2025
FiledStatusContractorScope
09/08/2025CompleteNY SOLAR ELECTRICAL LLC—
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
08/16/2023Pass-Final General Construction Non-Directive 14PassView ↗
06/30/2023Pass-Final General Construction Non-Directive 14PassView ↗
06/09/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/06/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/11/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
03/16/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 36
DateRequirementInspectorRole
09/08/2025Structural Stability – Alterations of existing buildingsROBERT MASONEspecial
09/08/2025Air barrier - visual inspectionROBERT MASONEenergy_progress
09/08/2025FinalROBERT MASONEprogress
09/08/2025Energy Code Compliance InspectionsROBERT MASONEprogress
09/08/2025Fire-Resistant Penetrations and JointsROBERT MASONEspecial
08/04/2023Energy Code Compliance InspectionsNASHAT IBRAHIMprogress
08/04/2023Fire-Resistant Penetrations and JointsNASHAT IBRAHIMspecial
08/04/2023Structural Stability – Alterations of existing buildingsROBERT HANNAspecial
08/04/2023Fenestration areasNASHAT IBRAHIMenergy_progress
08/04/2023Fenestration air leakageNASHAT IBRAHIMenergy_progress
08/04/2023Insulation placement and R valuesNASHAT IBRAHIMenergy_progress
08/04/2023Fenestration and door U-factor and product ratingsNASHAT IBRAHIMenergy_progress
08/04/2023FinalNASHAT IBRAHIMprogress
08/04/2023Fire-Resistance Rated ConstructionNASHAT IBRAHIMprogress
07/07/2023Fenestration air leakageNASHAT IBRAHIMenergy_progress
07/07/2023Fire-Resistant Penetrations and JointsNASHAT IBRAHIMspecial
07/07/2023Structural Stability – Alterations of existing buildingsROBERT HANNAspecial
07/07/2023Energy Code Compliance InspectionsNASHAT IBRAHIMprogress
07/07/2023FinalNASHAT IBRAHIMprogress
07/07/2023Fire-Resistance Rated ConstructionNASHAT IBRAHIMprogress
07/07/2023Fenestration and door U-factor and product ratingsNASHAT IBRAHIMenergy_progress
07/07/2023Fenestration areasNASHAT IBRAHIMenergy_progress
07/07/2023Insulation placement and R valuesNASHAT IBRAHIMenergy_progress
05/25/2023Fire-Resistant Penetrations and JointsNASHAT IBRAHIMspecial
05/25/2023Energy Code Compliance InspectionsNASHAT IBRAHIMprogress
Latest 25 of 36.
▾Documents — 54 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/26/2026Q00727428-P2Request digital key ↗
08/26/2026Q00727428-P1Request digital key ↗
08/26/2026Q00727428-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications40
▸DOB NOWProgress Inspector Seal & Signature25
09/01/2026Q00727428-I1Open ↗
09/01/2026Q00727428-I1Open ↗
09/01/2026Q00727428-I1Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/01/2026Q00727428-I1Open ↗
09/01/2026Q00727428-I1Open ↗
09/01/2026Q00727428-P2Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/26/2026Q00727428-P1Open ↗
08/26/2026Q00727428-I1Open ↗
08/25/2026Q00784027-I1Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/26/2026Q00727428-P1Open ↗
08/26/2026Q00727428-I1Open ↗
08/25/2026Q00784027-I1Open ↗
Showing 3 of 6 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026Q00727428-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01283903-I1Open ↗