← Back
Three families
191 CARLTON AVENUE
BROOKLYN · Fort Greene · BIN 3058316
💬 Discuss this project
1899Year Built
3Stories
C0Building Class
R6BZoning
3,544 sfGross Floor Area
3Units
Rent Stabilized13 Open Violations ▸FDNY Report ↗
Three families · 2,100 sf lot · 1.69 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction51p · 1 filing · 20 docs
Floor 3Under Construction48p · 1 filing · 20 docs
Floor 2Under Construction49p · 1 filing · 20 docs
Floor 1Under Construction49p · 1 filing · 20 docs
CellarUnder Construction54p · 1 filing · 20 docs
BasementUnder Construction47p · 1 filing · 20 docs
Site & exteriorUnder Construction61p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
THREE STAR CONSTRUCTION307/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/11/2025$3.2M—Private party → Private party$903/sf building
10/02/2015$480K—— → —$135/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ANZALONE ARCHITECTURE1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AZ INTERIORS NY LLCGeneral Contractor608/26/2026
THREE STAR CONSTRUCTION GGeneral Contractor207/08/2026
ZAPAS CONSTRUCTION CORPFire Protection107/08/2026
DYNAMIC BLUE WATER MECHPlumbing106/27/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CELIN MUNOZ CONSULTING EN1064504/29/2026
EMPIRE DESIGN CORP5474104/16/2026
ANZ CONSULTING ENGINEERIN3946405/28/2025
Building Lifecycle
All (91)Filed (9)Permit Issued (10)Violation (28)Objection (14)Special Inspection (30)
07/14/2026
Permit issued — General Construction
B01201546-I1-GC
06/02/2026
Permit issued — Sprinklers
B01201546-S3-EW-SP
05/11/2026
Special inspection requirement — Structural Wood Frame
Celin Munoz
05/11/2026
Special inspection requirement — Final
Celin Munoz
05/11/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Celin Munoz
05/11/2026
Special inspection requirement — Structural Steel - High Strength Bolting
Celin Munoz
05/11/2026
Special inspection requirement — Post-installed Anchors
Celin Munoz
05/11/2026
Special inspection requirement — Concrete - Cast-In-Place
Celin Munoz
05/11/2026
Special inspection requirement — Structural Steel - Details
Celin Munoz
05/11/2026
Special inspection requirement — Masonry
Celin Munoz
05/11/2026
Special inspection requirement — Structural Steel - Welding
Celin Munoz
05/11/2026
Special inspection requirement — Structural Cold-Formed Steel
Celin Munoz
05/04/2026
Violation issued (HPD, open)
A
04/29/2026
Filed — Alteration CO
MECHANICAL WORK FILED IN CONJUNCTION WITH CONVERSION OF EXISTING BUILDING FROM 3- TO 1-FAMILY INCLUDING 1-STORY REAR ADDITION. INSTALL SPLIT NEW HVAC SYSTEM, DUCTWORK AND DIFFUSERS. INSTALL TOILET, KITCHEN AND DRYER EXHAUST.
B01201546-P1
04/16/2026
Filed — Alteration
INSTALLATION OF NEW SIDEWALK SHED WITH PIPE SCAFFOLD AT 191 CARLTON AVENUE, BROOKLYN, AS PER PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01383576-I1
04/16/2026
Permit issued — Supported Scaffold
B01383576-I1-SF
04/16/2026
Permit issued — Sidewalk Shed
B01383576-I1-SH
04/06/2026
Special inspection requirement — Post-installed Anchors
Md Rashid
04/03/2026
Special inspection requirement — Structural Wood Frame
Celin Munoz
04/03/2026
Special inspection requirement — Concrete - Cast-In-Place
Celin Munoz
04/03/2026
Special inspection requirement — Masonry
Celin Munoz
04/03/2026
Special inspection requirement — Post-installed Anchors
Celin Munoz
04/03/2026
Special inspection requirement — Structural Cold-Formed Steel
Celin Munoz
04/03/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Celin Munoz
04/03/2026
Special inspection requirement — Structural Steel - Details
Celin Munoz
04/03/2026
Special inspection requirement — Structural Steel - High Strength Bolting
Celin Munoz
04/03/2026
Special inspection requirement — Structural Steel - Welding
Celin Munoz
04/03/2026
Special inspection requirement — Final
Celin Munoz
11/26/2025
Permit issued — Plumbing
B01201546-S2-PL
10/16/2025
Permit issued — General Construction
B01201546-I1-GC
10/10/2025
Permit issued — Mechanical Systems
B01201546-S1-MS
10/10/2025
Permit issued — Foundation
B01201546-S5-FO
10/10/2025
Permit issued — Construction Fence
B01201546-S6-FN
10/10/2025
Permit issued — Structural
B01201546-S4-ST
06/23/2025
Objection resolved — Addressed
06/18/2025
Objection raised — Energy
06/12/2025
Objection resolved — Addressed
06/12/2025
Objection resolved — Addressed
06/11/2025
Objection resolved — Addressed
06/10/2025
Objection resolved — Addressed
06/09/2025
Violation issued (HPD, open)
A
06/09/2025
Objection raised — Scope
06/09/2025
Objection raised — Mechanical
06/09/2025
Special inspection requirement — Permanent certificate
BRENT BUCK
06/09/2025
Special inspection requirement — Lighting controls
BRENT BUCK
06/09/2025
Special inspection requirement — Maintenance information
BRENT BUCK
06/09/2025
Special inspection requirement — Interior lighting power
BRENT BUCK
06/05/2025
Objection resolved — Addressed
06/05/2025
Objection resolved — Addressed
06/04/2025
Objection raised — Fire_Protection
06/04/2025
Objection raised — Mechanical
06/04/2025
Objection raised — Structural
06/04/2025
Objection raised — Fire_Protection
05/28/2025
Filed — Alteration CO
MECHANICAL WORK FILED IN CONJUNCTION WITH CONVERSION OF EXISTING BUILDING FROM 3- TO 1-FAMILY INCLUDING 1-STORY REAR ADDITION. INSTALL SPLIT NEW HVAC SYSTEM, DUCTWORK AND DIFFUSERS. INSTALL TOILET, KITCHEN AND DRYER EXHAUST.
B01201546-S6
05/28/2025
Filed — Alteration CO
MECHANICAL WORK FILED IN CONJUNCTION WITH CONVERSION OF EXISTING BUILDING FROM 3- TO 1-FAMILY INCLUDING 1-STORY REAR ADDITION. INSTALL SPLIT NEW HVAC SYSTEM, DUCTWORK AND DIFFUSERS. INSTALL TOILET, KITCHEN AND DRYER EXHAUST.
B01201546-S1
05/28/2025
Filed — Alteration CO
MECHANICAL WORK FILED IN CONJUNCTION WITH CONVERSION OF EXISTING BUILDING FROM 3- TO 1-FAMILY INCLUDING 1-STORY REAR ADDITION. INSTALL SPLIT NEW HVAC SYSTEM, DUCTWORK AND DIFFUSERS. INSTALL TOILET, KITCHEN AND DRYER EXHAUST.
B01201546-S3
05/28/2025
Filed — Alteration CO
MECHANICAL WORK FILED IN CONJUNCTION WITH CONVERSION OF EXISTING BUILDING FROM 3- TO 1-FAMILY INCLUDING 1-STORY REAR ADDITION. INSTALL SPLIT NEW HVAC SYSTEM, DUCTWORK AND DIFFUSERS. INSTALL TOILET, KITCHEN AND DRYER EXHAUST.
B01201546-I1
05/28/2025
Filed — Alteration CO
MECHANICAL WORK FILED IN CONJUNCTION WITH CONVERSION OF EXISTING BUILDING FROM 3- TO 1-FAMILY INCLUDING 1-STORY REAR ADDITION. INSTALL SPLIT NEW HVAC SYSTEM, DUCTWORK AND DIFFUSERS. INSTALL TOILET, KITCHEN AND DRYER EXHAUST.
B01201546-S2
05/28/2025
Filed — Alteration CO
MECHANICAL WORK FILED IN CONJUNCTION WITH CONVERSION OF EXISTING BUILDING FROM 3- TO 1-FAMILY INCLUDING 1-STORY REAR ADDITION. INSTALL SPLIT NEW HVAC SYSTEM, DUCTWORK AND DIFFUSERS. INSTALL TOILET, KITCHEN AND DRYER EXHAUST.
B01201546-S5
05/28/2025
Filed — Alteration CO
MECHANICAL WORK FILED IN CONJUNCTION WITH CONVERSION OF EXISTING BUILDING FROM 3- TO 1-FAMILY INCLUDING 1-STORY REAR ADDITION. INSTALL SPLIT NEW HVAC SYSTEM, DUCTWORK AND DIFFUSERS. INSTALL TOILET, KITCHEN AND DRYER EXHAUST.
B01201546-S4
Latest 60 of 91 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedAZ INTERIORS NY LLC07/14/2026
DOB NOWSprinklersPermit IssuedZAPAS CONSTRUCTION CORP06/02/2026
DOB NOWSupported ScaffoldPermit IssuedTHREE STAR CONSTRUCTION G04/16/2026
DOB NOWSidewalk ShedPermit IssuedTHREE STAR CONSTRUCTION G04/16/2026
DOB NOWPlumbingPermit IssuedSUPER PLUMBERS CORP11/26/2025
DOB NOWGeneral ConstructionPermit IssuedAZ INTERIORS NY LLC10/16/2025
DOB NOWMechanical SystemsPermit IssuedAZ INTERIORS NY LLC10/10/2025
DOB NOWFoundationPermit IssuedAZ INTERIORS NY LLC10/10/2025
DOB NOWConstruction FencePermit IssuedAZ INTERIORS NY LLC10/10/2025
DOB NOWStructuralPermit IssuedAZ INTERIORS NY LLC10/10/2025
1 project · most recent 04/29/2026
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/29/2026Permit IssuedAZ INTERIORS NY LLCAir Conditioning Systems, Ventilation Systems
Cooling
Mitsubishi Electric MXZ-SM42NLHZ 48,000 BTU · Condensing Unit ×2
PUZ-AK30NLHZ 34,000 BTU · Condensing Unit ×1
Ventilation
Fantech FR 100 80 CFM · Exhaust Fan ×5
Neptronic CMU12B08CAD 750 CFM · Makeup Air ×1
Panasonic FV-05-11VK2 80 CFM · Exhaust Fan ×1
1 project · most recent 04/29/2026
Sprinkler System
FiledStatusContractorScope
04/29/2026Permit IssuedZAPAS CONSTRUCTION CORPSprinkler System
1 project · most recent 04/29/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
04/29/2026Permit IssuedDYNAMIC BLUE WATER MECHGas, Storm, Water/Sanitary
2 projects · most recent 09/09/2026
General Wiring
FiledStatusContractorScope
09/09/2026Permit IssuedGLENDALE ELECTL CONTNG INGeneral Wiring
04/08/2026Permit IssuedSUPREME ELECTRIC CORP—
1 project · most recent 04/29/2026
Steel Masonry Wood
FiledStatusContractorScope
04/29/2026Permit IssuedAZ INTERIORS NY LLCSteel, Masonry, Wood
2 projects · most recent 04/29/2026
Fence Scaffold Sidewalk Shed
FiledStatusContractorScope
04/29/2026Permit IssuedAZ INTERIORS NY LLCFence
04/16/2026Permit IssuedTHREE STAR CONSTRUCTION GScaffold, Sidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 52
DateRequirementInspectorRole
05/11/2026Structural Wood FrameCelin Munozprogress
05/11/2026FinalCelin Munozprogress
05/11/2026Structural Stability – Alterations of existing buildingsCelin Munozspecial
05/11/2026Structural Steel - High Strength BoltingCelin Munozspecial
05/11/2026Post-installed AnchorsCelin Munozspecial
05/11/2026Concrete - Cast-In-PlaceCelin Munozspecial
05/11/2026Structural Steel - DetailsCelin Munozspecial
05/11/2026MasonryCelin Munozspecial
05/11/2026Structural Steel - WeldingCelin Munozspecial
05/11/2026Structural Cold-Formed SteelCelin Munozspecial
04/06/2026Post-installed AnchorsMd Rashidspecial
04/03/2026Structural Wood FrameCelin Munozprogress
04/03/2026Concrete - Cast-In-PlaceCelin Munozspecial
04/03/2026MasonryCelin Munozspecial
04/03/2026Post-installed AnchorsCelin Munozspecial
04/03/2026Structural Cold-Formed SteelCelin Munozspecial
04/03/2026Structural Stability – Alterations of existing buildingsCelin Munozspecial
04/03/2026Structural Steel - DetailsCelin Munozspecial
04/03/2026Structural Steel - High Strength BoltingCelin Munozspecial
04/03/2026Structural Steel - WeldingCelin Munozspecial
04/03/2026FinalCelin Munozprogress
06/09/2025Permanent certificateBRENT BUCKenergy_progress
06/09/2025Lighting controlsBRENT BUCKenergy_progress
06/09/2025Maintenance informationBRENT BUCKenergy_progress
06/09/2025Interior lighting powerBRENT BUCKenergy_progress
Latest 25 of 52.
▾Documents — 88 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/17/2026B01383576-I1Request digital key ↗
08/17/2026B01201546-P1Request digital key ↗
08/17/2026B01201546-S1Request digital key ↗
Showing 3 of 9 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B01201546-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026B01201546-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026B01201546-I1Open ↗
▸Seals & Professional Certifications61
▸DOB NOWSpecial Inspector Seal & Signature27
08/29/2026B01201546-S2Open ↗
08/29/2026B01383576-I1Open ↗
08/26/2026B01201546-P1Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWProgress Inspector Seal & Signature25
08/29/2026B01201546-S2Open ↗
08/29/2026B01201546-S2Open ↗
08/29/2026B01201546-S2Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/17/2026B01383576-I1Open ↗
08/17/2026B01201546-P1Open ↗
08/17/2026B01201546-I1Open ↗
Showing 3 of 9 on file for this type
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026B01201546-I1Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form7
08/17/2026B01201546-S6Open ↗
08/17/2026B01201546-I1Open ↗
08/17/2026B01201546-S1Open ↗
Showing 3 of 7 on file for this type
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B01201546-S5Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026B01201546-S5Open ↗
▸Other Documents5
▸DOB NOWPlot Diagram2
08/13/2026B01201546-S5Open ↗
08/13/2026B01201546-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026B01201546-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B01201546-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/17/2026B01201546-I1Open ↗