← Back
BuildNYC
Three families
191 CARLTON AVENUE
BROOKLYN · Fort Greene · BIN 3058316
💬 Discuss this project
1899Year Built
3Stories
C0Building Class
R6BZoning
3,544 sfGross Floor Area
3Units
Rent Stabilized7 Active Violations ▸FDNY Report ↗
Three families · 2,100 sf lot · 1.69 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofRenovation & Conversion of Existing Building From 3 to 1 FamUnder Construction49p · 1 filing · 20 docs
BulkheadRenovation & Conversion of Existing Building From 3 to 1 FamUnder Construction2p · 1 filing · 20 docs
Floor 3Renovation & Conversion of Existing Building From 3 to 1 FamUnder Construction46p · 1 filing · 20 docs
Floor 2Renovation & Conversion of Existing Building From 3 to 1 FamUnder Construction47p · 1 filing · 20 docs
Floor 1Renovation & Conversion of Existing Building From 3 to 1 FamUnder Construction47p · 1 filing · 20 docs
CellarRenovation & Conversion of Existing Building From 3 to 1 FamUnder Construction52p · 1 filing · 20 docs
BasementRenovation & Conversion of Existing Building From 3 to 1 FamUnder Construction45p · 1 filing · 20 docs
Site & exteriorRenovation & Conversion of Existing Building From 3 to 1 FamUnder Construction59p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/11/2025$3.2M—Private party → Private party$903/sf building
10/02/2015$480K—Private party → Private party$135/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Celin Munoz Consulting Engineering304/29/2026
Empire Design104/16/2026
Anz Consulting Engineering305/28/2025
Brent Buck Architects205/28/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Anzalone Architecture1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AZ Interiors NYGeneral Contractor810/28/2026
AZ Interiors NYScaffold210/28/2026
Three Star Construction GScaffold207/08/2026
Dynamic Blue Water MechanicalPlumbing106/27/2026
Zapas ConstructionFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Celin Munoz Consulting EN1064504/29/2026
Empire Design5474104/16/2026
Anz Consulting Engineering3946405/28/2025
Building Lifecycle
10/27/2026
Permit renewed — Foundation
Renewed without changes
B01201546-S5-FO
10/27/2026
Permit renewed — Mechanical Systems
Renewed without changes
B01201546-S1-MS
10/27/2026
Permit renewed — Construction Fence
Renewed without changes
B01201546-S6-FN
10/27/2026
Permit renewed — Structural
Renewed without changes
B01201546-S4-ST
07/15/2026
Permit expired, never signed off — Sidewalk Shed
The city's record still shows this permit as issued, with no sign-off on its filing
B01383576-I1-SH
87 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationPermit IssuedAZ Interiors NY10/27/2026
DOB NOWMechanical SystemsPermit IssuedAZ Interiors NY10/27/2026
DOB NOWConstruction FencePermit IssuedAZ Interiors NY10/27/2026
DOB NOWStructuralPermit IssuedAZ Interiors NY10/27/2026
DOB NOWGeneral ConstructionPermit IssuedAZ Interiors NY07/14/2026
DOB NOWSprinklersPermit IssuedZapas Construction06/02/2026
DOB NOWSupported ScaffoldPermit IssuedThree Star Construction G04/16/2026
DOB NOWSidewalk ShedPermit IssuedThree Star Construction G04/16/2026
DOB NOWPlumbingPermit IssuedSuper Plumbers11/26/2025
DOB NOWGeneral ConstructionPermit IssuedAZ Interiors NY10/16/2025
DOB NOWConstruction FencePermit IssuedAZ Interiors NY10/10/2025
DOB NOWFoundationPermit IssuedAZ Interiors NY10/10/2025
DOB NOWMechanical SystemsPermit IssuedAZ Interiors NY10/10/2025
DOB NOWStructuralPermit IssuedAZ Interiors NY10/10/2025
1 project · most recent 04/29/2026
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScope
04/29/2026Permit IssuedAZ Interiors NYAir Conditioning Systems, Ventilation Systems
1 project · most recent 04/29/2026
Sprinkler System
FiledStatusContractorScope
04/29/2026Permit IssuedZapas ConstructionSprinkler System
1 project · most recent 04/29/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
04/29/2026Permit IssuedDynamic Blue Water MechanicalGas, Storm, Water/Sanitary
2 projects · most recent 09/09/2026
General Wiring
FiledStatusContractorScope
09/09/2026Permit IssuedGlendale Electl ContngGeneral Wiring
04/08/2026Permit IssuedSupreme Electric—
1 project · most recent 04/29/2026
Steel Masonry Wood
FiledStatusContractorScope
04/29/2026Permit IssuedAZ Interiors NYSteel, Masonry, Wood
2 projects · most recent 04/29/2026
Fence Scaffold Sidewalk Shed
FiledStatusContractorScope
04/29/2026Permit IssuedAZ Interiors NYFence
04/16/2026Permit IssuedThree Star Construction GScaffold, Sidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 52
DateRequirementInspectorRole
05/11/2026Post-installed AnchorsCelin Munozspecial
05/11/2026Structural Steel - High Strength BoltingCelin Munozspecial
05/11/2026Structural Wood FrameCelin Munozprogress
05/11/2026Structural Stability – Alterations of existing buildingsCelin Munozspecial
05/11/2026Structural Cold-Formed SteelCelin Munozspecial
05/11/2026Structural Steel - WeldingCelin Munozspecial
05/11/2026FinalCelin Munozprogress
05/11/2026MasonryCelin Munozspecial
05/11/2026Structural Steel - DetailsCelin Munozspecial
05/11/2026Concrete - Cast-In-PlaceCelin Munozspecial
04/06/2026Post-installed AnchorsMd Rashidspecial
04/03/2026Structural Stability – Alterations of existing buildingsCelin Munozspecial
04/03/2026Structural Steel - High Strength BoltingCelin Munozspecial
04/03/2026Structural Steel - WeldingCelin Munozspecial
04/03/2026FinalCelin Munozprogress
04/03/2026Structural Wood FrameCelin Munozprogress
04/03/2026Concrete - Cast-In-PlaceCelin Munozspecial
04/03/2026MasonryCelin Munozspecial
04/03/2026Post-installed AnchorsCelin Munozspecial
04/03/2026Structural Cold-Formed SteelCelin Munozspecial
04/03/2026Structural Steel - DetailsCelin Munozspecial
06/09/2025Interior lighting powerBRENT BUCKenergy_progress
06/09/2025Lighting controlsBRENT BUCKenergy_progress
06/09/2025Maintenance informationBRENT BUCKenergy_progress
06/09/2025Permanent certificateBRENT BUCKenergy_progress
Latest 25 of 52.
88 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account