Office only, 7-19 stories
191 JORALEMON STREET
BROOKLYN · Brooklyn Heights · BIN 3002244
💬 Discuss this project
1925Year Built
14Stories
O3Building Class
C5-2AZoning
76,916 sfGross Floor Area
2Units
LL97 Covered3 Open Violations ▸FISP: SAFE
Office only, 7-19 stories · 5,494 sf lot · 14 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Roof1 filing · 8 docs
Bulkhead1p · 1 filing · 8 docs
Floor 81 filing
Floor 7
Floor 61 filing
Floor 51 filing · 12 docs
Floor 4
Floor 31 filing · 6 docs
Floor 22p · 4 filings
Floor 113p · 2 filings
Mezzanine2p · 2 filings · 20 docs
Cellar2p · 1 filing · 6 docs
Site & exterior4 filings · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
44 COURT ST LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LEWSAN CONSULTING1003/21/2026
P WOLFE CONSULTANTS1403/21/2026
AE DESIGN SOLUTION1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CRAINE AIR CONDITIONING INCGeneral Contractor807/08/2026
EMPIRE NY INSTALLATIONS INCGeneral Contractor407/08/2026
JOHN GALLIN & SON, INCGeneral Contractor307/08/2026
MAC FELDER INCPlumbing207/08/2026
DEMARI SERVICES INCGeneral Contractor207/08/2026
POWERS BRIDGING & SCAFFOLDINGGeneral Contractor203/21/2026
EOS ELECTRICAL CORPElectrical103/22/2026
RAEL AUTOMATIC SPR.CO INCFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EC SPECIAL INSPECTIONS8355205/30/2024
ASR ENGINEERING PC8404105/13/2024
CL ENGINEERING P.C.6781304/27/2023
M. INT'L ENGINEERING PLLC3129504/11/2022
THE EIPEL ENGINEERING GRO2714103/11/2021
Building Lifecycle
All (182)Filed (18)Permit Issued (20)Signed Off (12)Facade (FISP) (22)Violation (60)Inspection (8)Objection (12)Special Inspection (30)
09/10/2026
Cycle 10 facade report submitted
09/08/2026
Cycle 10 facade report signed — SAFE
09/02/2026
Cycle 10 facade inspection completed
07/13/2026
Cycle 9 facade report signed — SAFE
06/24/2026
Cycle 9 facade inspection completed
02/25/2026
Cycle 9 facade report submitted
01/28/2026
Signed off — Alteration
FILING FOR FACADE REPAIR, WORK TO INCLUDE REMOVE & REPLACE CRACKED AND/OR SPALLED MASONRY SECTION, DETERIORATED STEEL LINTELS, CRACKED AND/OR SPALLED WINDOW SILL, BLDG CORNER REPLACEMENT, PARAPET WALL REPLACEMENT, ORNAMENTAL STONE PATCHING & REPLACEMENT.
B01047436-I1
12/29/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/22/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01030009-I1
09/22/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00944715-I1
06/20/2025
Permit issued — General Construction
B01047436-I1-GC
06/03/2025
Permit issued — Suspended Scaffold
B01042951-I1-SC
04/17/2025
Permit issued — Supported Scaffold
B01030009-I1-SF
09/20/2024
Permit issued — Sidewalk Shed
B00944715-I1-SH
07/26/2024
Permit issued — Suspended Scaffold
B01042951-P1-SC
07/22/2024
Filed — Alteration
INSTALLATION OF SUSPENDED SCAFFOLD FOR FACADE WORK OR INSPECTION. AMEND#1, CHANGE IN TIEBACK AND ADDED TIEBACK DETAIL.
B01042951-P1
07/17/2024
Signed off — Alteration
Installation of new Evaporators at 7th, 8th, 14 fl, Replacing 7th, 13th and 14 fl. Air Handler. New Package Unit at 9th fl. New heat pumps mounted on 8th fl and roof
B00847696-I1
07/17/2024
Signed off — Alteration
Installation of new Evaporators at 7th, 8th, 14 fl, Replacing 7th, 13th and 14 fl. Air Handler. New Package Unit at 9th fl. New heat pumps mounted on 8th fl and roof
B00847696-S1
07/17/2024
Signed off — Alteration
Installation of new Evaporators at 7th, 8th, 14 fl, Replacing 7th, 13th and 14 fl. Air Handler. New Package Unit at 9th fl. New heat pumps mounted on 8th fl and roof
B00847696-S2
07/17/2024
Permit issued — General Construction
B01047436-I1-GC
07/01/2024
Permit issued — Mechanical Systems
B00847696-S2-MS
06/18/2024
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00944715-P1
06/11/2024
Violation issued (ECB, closed)
Construction
05/30/2024
Filed — Alteration
Installation of new Evaporators at 7th, 8th, 14 fl, Replacing 7th, 13th and 14 fl. Air Handler. New Package Unit at 9th fl. New heat pumps mounted on 8th fl and roof
B00847696-S2
05/29/2024
Objection resolved — Addressed
05/29/2024
Objection resolved — Addressed
05/29/2024
Objection resolved — Addressed
05/20/2024
Objection raised — Scope
05/20/2024
Objection raised — Scope
05/20/2024
Objection raised — Other
05/16/2024
Permit issued — Suspended Scaffold
B01042951-I1-SC
05/15/2024
Objection raised — Other
05/15/2024
Objection resolved — Addressed
05/13/2024
Filed — Alteration
FILING FOR FACADE REPAIR, WORK TO INCLUDE REMOVE & REPLACE CRACKED AND/OR SPALLED MASONRY SECTION, DETERIORATED STEEL LINTELS, CRACKED AND/OR SPALLED WINDOW SILL, BLDG CORNER REPLACEMENT, PARAPET WALL REPLACEMENT, ORNAMENTAL STONE PATCHING & REPLACEMENT.
B01047436-I1
05/07/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
AKM RAHMAN
05/07/2024
Special inspection requirement — Post-installed Anchors
AKM RAHMAN
05/07/2024
Special inspection requirement — Masonry
AKM RAHMAN
05/07/2024
Special inspection requirement — Final
Hans Arntsen
04/29/2024
Filed — Alteration
INSTALLATION OF SUSPENDED SCAFFOLD FOR FACADE WORK OR INSPECTION. AMEND#1, CHANGE IN TIEBACK AND ADDED TIEBACK DETAIL.
B01042951-I1
04/08/2024
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01030009-I1
04/08/2024
Permit issued — Supported Scaffold
B01030009-I1-SF
02/29/2024
Cycle 9 facade report submitted
02/27/2024
Cycle 9 facade report signed — UNSAFE
02/26/2024
Cycle 9 facade inspection completed
11/29/2023
Permit issued — Mechanical Systems
B00847696-S1-MS
11/24/2023
Filed — Alteration
Installation of new Evaporators at 7th, 8th, 14 fl, Replacing 7th, 13th and 14 fl. Air Handler. New Package Unit at 9th fl. New heat pumps mounted on 8th fl and roof
B00847696-S1
10/25/2023
Special inspection requirement — HVAC-R and service water heating equipment
Steven Bendoraitis
10/25/2023
Special inspection requirement — Energy Code Compliance Inspections
Steven Bendoraitis
10/25/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
ABDALLAH ELCHERBINI
10/25/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Bendoraitis
10/25/2023
Special inspection requirement — Maintenance information
Steven Bendoraitis
10/25/2023
Special inspection requirement — HVAC-R and service water heating system controls
Steven Bendoraitis
10/17/2023
Permit issued — Sidewalk Shed
B00944715-I1-SH
10/16/2023
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00944715-I1
10/12/2023
Special inspection requirement — Final
Steven Bendoraitis
10/12/2023
Special inspection requirement — Mechanical Systems
ABDALLAH ELCHERBINI
05/02/2023
Permit issued — Mechanical Systems
B00847696-I1-MS
04/27/2023
Filed — Alteration
Installation of new Evaporators at 7th, 8th, 14 fl, Replacing 7th, 13th and 14 fl. Air Handler. New Package Unit at 9th fl. New heat pumps mounted on 8th fl and roof
B00847696-I1
04/13/2023
Special inspection requirement — Energy Code Compliance Inspections
Steven Bendoraitis
04/13/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
Latest 60 of 182 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offDEMARI SERVICES INC06/20/2025
DOB NOWSuspended ScaffoldPermit IssuedDEMARI SERVICES INC06/03/2025
DOB NOWSupported ScaffoldSigned-offEMPIRE NY INSTALLATIONS I04/17/2025
DOB NOWSidewalk ShedSigned-offEMPIRE NY INSTALLATIONS I09/20/2024
DOB NOWSuspended ScaffoldPermit IssuedDEMARI SERVICES INC07/26/2024
DOB NOWGeneral ConstructionSigned-offDEMARI SERVICES INC07/17/2024
DOB NOWMechanical SystemsSigned-offCRAINE AIR CONDITIONING I07/01/2024
DOB NOWSuspended ScaffoldPermit IssuedDEMARI SERVICES INC05/16/2024
DOB NOWSupported ScaffoldSigned-offEMPIRE NY INSTALLATIONS I04/08/2024
DOB NOWMechanical SystemsSigned-offCRAINE AIR CONDITIONING I11/29/2023
DOB NOWSidewalk ShedSigned-offEMPIRE NY INSTALLATIONS I10/17/2023
DOB NOWMechanical SystemsSigned-offCRAINE AIR CONDITIONING I05/02/2023
DOB NOWMechanical SystemsSigned-offCRAINE AIR CONDITIONING I12/21/2022
DOB NOWPlumbingSigned-offMAC FELDER INC07/19/2022
DOB NOWMechanical SystemsSigned-offCRAINE AIR CONDITIONING I11/15/2021
DOB NOWSprinklersSigned-offRAEL AUTOMATIC SPR.CO INC06/07/2021
DOB NOWPlumbingSigned-offMAC FELDER INC05/25/2021
DOB NOWStructuralSigned-offJOHN GALLIN SON05/24/2021
DOB NOWMechanical SystemsSigned-offJOHN GALLIN SON05/21/2021
DOB NOWSidewalk ShedPermit IssuedPOWERS BRIDGING & SCAFFOL11/03/2018
BISPLISSUEDPACE PLUMBING CORP02/09/2021
BISSPISSUEDPACE PLUMBING CORP02/09/2021
BISOTISSUEDALLIED CONSTRUCTION AND D10/09/2019
BISPLISSUEDPACE PLUMBING CORP09/30/2019
BISSPISSUEDPACE PLUMBING CORP09/30/2019
BISOTISSUEDALLIED CONSTRUCTION AND D10/10/2018
BISOTISSUEDADVANCED CHIMNEY INC10/24/2014
BISOTISSUEDVICTORIA CONSULTING & DEV02/13/2014
BISMHISSUEDVICTORIA CONSULTING & DEV02/13/2014
BISOTISSUEDADELPHI RESTORATION CORP03/26/2013
BISOTISSUEDADELPHI RESTORATION CORP03/07/2013
BISEQISSUEDEVEREST SCAFFOLDING INC12/28/2012
BISFBISSUEDRB HTG CONSULTING GROUP08/07/2012
BISOTISSUEDADELPHI RESTORATION CORP04/27/2012
BISEQISSUEDEVEREST SCAFFOLDING INC01/12/2012
BISEQISSUEDEVEREST SCAFFOLDING INC01/12/2012
BISMHISSUEDBLUE DIAMOND FUEL OIL CORP10/22/2008
BISMHISSUEDSTANDARD REFRIGERATORS IN08/15/2007
BISEQISSUEDROCKLEDGE SCAFFOLD CORP01/27/2006
BISEQISSUEDROCKLEDGE SCAFFOLD CORP01/23/2006
+ 5 more permits on file
7 projects · most recent 04/02/2025
General Wiring
FiledStatusContractorScope
04/02/2025CancelledVERTEX ELECTRIC CORP.General Wiring
10/10/2023CompleteMEGA ELEC'L CONTR'G, INC—
04/27/2022CompleteE-J ELEC. INSTALLATION COGeneral Wiring
05/12/2021CancelledP.E. STONE INCGeneral Wiring
08/21/2020CompleteEOS ELECTRICAL CORPGeneral Wiring
02/08/2019CompleteTUXEDO ELEC'L CONTR'G INCGeneral Wiring
10/25/2018CompleteOPTIMAL ELECTRIC, INC—
1 project · most recent 07/22/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
07/22/2024Permit IssuedDEMARI SERVICES INCSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
07/19/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/11/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/07/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/07/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/20/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/20/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/02/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/30/2021Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 34
DateRequirementInspectorRole
05/07/2024Structural Stability – Alterations of existing buildingsAKM RAHMANspecial
05/07/2024Post-installed AnchorsAKM RAHMANspecial
05/07/2024MasonryAKM RAHMANspecial
05/07/2024FinalHans Arntsenprogress
10/25/2023HVAC-R and service water heating equipmentSteven Bendoraitisenergy_progress
10/25/2023Energy Code Compliance InspectionsSteven Bendoraitisprogress
10/25/2023Fire-Resistant Penetrations and JointsABDALLAH ELCHERBINIspecial
10/25/2023HVAC-R and service water piping design and insulationSteven Bendoraitisenergy_progress
10/25/2023Maintenance informationSteven Bendoraitisenergy_progress
10/25/2023HVAC-R and service water heating system controlsSteven Bendoraitisenergy_progress
10/12/2023FinalSteven Bendoraitisprogress
10/12/2023Mechanical SystemsABDALLAH ELCHERBINIspecial
04/13/2023Energy Code Compliance InspectionsSteven Bendoraitisprogress
04/13/2023Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
04/13/2023HVAC-R and service water heating system controlsSteven Bendoraitisenergy_progress
04/13/2023HVAC-R and service water heating equipmentSteven Bendoraitisenergy_progress
04/13/2023HVAC-R and service water piping design and insulationSteven Bendoraitisenergy_progress
04/13/2023Maintenance informationSteven Bendoraitisenergy_progress
03/21/2023Mechanical SystemsCHRISTIAN LOZADAspecial
03/21/2023FinalSteven Bendoraitisprogress
12/04/2022HVAC-R and service water piping design and insulationSteven Bendoraitisenergy_progress
12/04/2022Maintenance informationSteven Bendoraitisenergy_progress
12/04/2022HVAC-R and service water heating system controlsSteven Bendoraitisenergy_progress
12/04/2022Energy Code Compliance InspectionsSteven Bendoraitisprogress
12/04/2022Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
Latest 25 of 34.
▾Documents — 366 on file (BIS + DOB NOW)
▸Plans & Drawings20
▸DOB NOWPlans/Sketch14
09/02/2026B00091470-I1Request digital key ↗
09/01/2026B00472564-I1Request digital key ↗
08/31/2026B00607398-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler2
09/01/2026B00472543-I1Request digital key ↗
08/15/2026B00472543-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/01/2026B00472564-I1Request digital key ↗
08/15/2026B00472564-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/01/2026B00472554-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/01/2026B00449565-I1Request digital key ↗
▸Applications & Permits64
▸BISPLAN / WORK APPROVAL APPLICATION36
12/09/2021340799602Open ↗
12/09/2021340799602Open ↗
06/08/2021321752643Open ↗
Showing 3 of 36 on file for this type
▸BISWORK PERMIT APPLICATION17
05/24/2021340799602Open ↗
10/10/2019321752643Open ↗
11/08/2018321752643Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWLPC Approval/Permit10
08/13/2026B00847696-I1Open ↗
08/13/2026B00449565-I1Open ↗
08/13/2026B00472554-I1Open ↗
Showing 3 of 10 on file for this type
▸BISCERTIFICATE OF OCCUPANCY APPLICATION1
08/14/2014320949239Open ↗
▸Seals & Professional Certifications92
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION30
10/15/2018321752643Open ↗
10/15/2018321752643Open ↗
07/31/2018321752643Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWProgress Inspector Seal & Signature20
09/29/2026B00472564-P1Open ↗
09/08/2026B01047436-I1Open ↗
08/26/2026B08037722-I1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
09/02/2026B00091470-I1Open ↗
09/01/2026B00472554-I1Open ↗
09/01/2026B00472564-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/29/2026B00472564-P1Open ↗
09/08/2026B01047436-I1Open ↗
08/26/2026B08037722-I1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
08/02/2014320949239Open ↗
08/08/2012320532367Open ↗
Showing 2 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
08/08/2012320532367Open ↗
Showing 1 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
06/15/2021340799602Open ↗
10/23/2014340190830Open ↗
Showing 2 of 3 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
10/23/2014340190830Open ↗
06/03/2014320949239Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
02/24/2021340799602Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
10/23/2014340190830Open ↗
▸Trade Schedules & Equipment18
▸BISFA - FDNY APPROVAL : FD-FAA5
12/20/2022321792093Open ↗
02/19/2016320949211Open ↗
01/29/2016320949211Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING4
06/08/2021321752643Open ↗
06/04/2021321752643Open ↗
04/26/2021321752643Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
07/31/2018321752643Open ↗
07/25/2018321752643Open ↗
05/07/2018321752643Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT3
10/03/2014320949239Open ↗
Showing 1 of 3 on file for this type
▸BISEQUIPMENT USE PERMITS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
08/08/2012320532367Open ↗
▸Safety & Tenant Protection1
▸BISTPP1: TENANT PROTECTION PLAN1
05/27/2021340799602Open ↗
▸Environmental & Asbestos25
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
09/01/2026B00472554-I1Open ↗
09/01/2026B00472564-I1Open ↗
09/01/2026B00472543-I1Open ↗
Showing 3 of 12 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'6
03/02/2012320441606Open ↗
03/02/2012320441606Open ↗
Showing 2 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
07/31/2018321752643Open ↗
07/25/2018321752643Open ↗
10/23/2014340190830Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM3
10/03/2014320949239Open ↗
06/03/2014320949211Open ↗
09/04/2012320532367Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
02/24/2021340799602Open ↗
▸Energy Compliance25
▸BISAS-BUILT ENERGY ANALYSIS9
05/04/2015340190830Open ↗
08/14/2014320949239Open ↗
08/14/2014320949239Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS8
05/04/2015340190830Open ↗
09/23/2014320949239Open ↗
09/23/2014320949239Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026B00472564-I1Open ↗
08/13/2026B00472554-I1Open ↗
08/13/2026B00607398-I1Open ↗
▸BISTR8: Energy Code Progress Inspections2
10/03/2014320949239Open ↗
09/22/2014320949239Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
10/23/2014340190830Open ↗
▸BISTECHNICAL REPORT: ENERGY1
03/02/2012320441606Open ↗
▸BISNYCECC EXEMPTION1
02/08/2021340799602Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY6
07/23/2021321752643Open ↗
07/23/2021321752643Open ↗
07/23/2021321752643Open ↗
Showing 3 of 6 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
06/14/2022340799602Open ↗
▸Approvals, Objections & Sign-offs60
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST18
06/15/2022340799602Open ↗
07/28/2021321752643Open ↗
02/19/2016320949211Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter14
09/02/2026B00091470-I1Open ↗
09/01/2026B00472554-I1Open ↗
09/01/2026B00472564-I1Open ↗
Showing 3 of 14 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION10
01/29/2016320949211Open ↗
05/04/2015340190830Open ↗
05/04/2015340190830Open ↗
Showing 3 of 10 on file for this type
▸BISADMINISTRATIVE OBJECTIONS9
06/03/2014320949211Open ↗
08/08/2012320532367Open ↗
Showing 2 of 9 on file for this type
▸BISLANDMARKS APPROVAL6
02/18/2021340799602Open ↗
07/31/2018321752643Open ↗
02/19/2016320949211Open ↗
Showing 3 of 6 on file for this type
▸BISLANDMARKS SIGNOFF2
06/15/2022340799602Open ↗
07/23/2021321752643Open ↗
▸BISFINAL1
06/14/2022340799602Open ↗
▸Cost, Insurance & Ownership24
▸BISCOST AFFIDAVIT22
06/15/2021340799602Open ↗
07/31/2018321752643Open ↗
07/24/2018321792093Open ↗
Showing 3 of 22 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
03/02/2022340799602Open ↗
07/28/2021321752643Open ↗
▸Filing & Intake Forms22
▸BISEFILING COVER SHEET10
07/24/2018321792093Open ↗
05/17/2018321752643Open ↗
05/07/2018321752643Open ↗
Showing 3 of 10 on file for this type
▸BISADDITIONAL INFORMATION7
12/14/2021340799602Open ↗
06/01/2021321752643Open ↗
06/01/2021321752643Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
12/09/2021340799602Open ↗
10/23/2014340190830Open ↗
▸BISBOROUGH INTAKE FORM2
10/11/2018321752643Open ↗
07/05/2018321752643Open ↗
▸DOB NOWAI1 Form (from plan PDF)1
08/16/2026B00944715-P1Open ↗
▸Other Documents8
▸DOB NOWCalculations2
08/13/2026B01042951-I1Open ↗
08/13/2026B01042951-P1Open ↗
▸DOB NOWManufacturer's Specifications2
08/13/2026B01042951-I1Open ↗
08/13/2026B01042951-P1Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
07/23/2021321752643Open ↗
▸BISFEE EXEMPTION DOCUMENTATION1
10/23/2014340190830Open ↗
▸BISLUMINOUS EGRESS PATH MARKINGS1
06/14/2022340799602Open ↗
▸DOB NOWProof of Historic Building1
08/13/2026B01047436-I1Open ↗