Public elementary, junior or senior high
P.S. 13 M. L. Lindemeyer
191 VERMONT AVENUE · BIN 5042776
💬 Discuss this project
1981Year Built
3Stories
W1Building Class
R3-2Zoning
76,623 sfGross Floor Area
1Units
12 Open Violations 4 unresolved · 8 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF EDUCATION · 142,107 sf lot · 0.54 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction10p · 3 filings · 20 docs
Floor 31p · 1 filing · 10 docs
Floor 21p · 1 filing · 20 docs
Floor 1Under Construction37p · 6 filings · 20 docs
CellarUnder Construction6p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC SCHOOL CONSTRUCTION AUTHORITY5209/21/2026
NYC DEPARTMENT OF EDUCATION103/22/2026
DEPARTMENT OF EDUCATION603/22/2026
DOE P.S.13603/22/2026
DEPT OF EDUC. PS 13203/22/2026
P.S. 13 D.O.E.703/22/2026
DOE PS 13 040603/22/2026
DOE 040403/22/2026
DOE PS 013 ML LINDEME040103/22/2026
PS #13 DEPT OF EDUCATION0303/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RA1803/21/2026
PRECISION 3SIXTY NYC, INC803/21/2026
LORING CONSULTING ENGINEERS603/21/2026
KNF SERVICES CROP303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BQE INDUSTRIES, INCGeneral Contractor2207/08/2026
AIRTONE CORPGeneral Contractor603/21/2026
I.M.P. PLBG. & HTG. CORPPlumbing307/08/2026
VARSITY PLBG AND HTG INCPlumbing206/28/2026
EMPIRE CONTROL ABATEMENTGeneral Contractor206/27/2026
A & S ELECTRIC INC.Electrical203/22/2026
GEMINI ELECTRIC CO., INC.Electrical103/22/2026
FRANCIS RICHARDSElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FUTURE TECH CONSULTANTS O589708/31/2026
JPC LOGISTICS DBA JPCL EN351608/14/2026
MUNICIPAL TESTING LABORAT230711/13/2025
Building Lifecycle
All (173)Filed (27)Permit Issued (24)Violation (60)Inspection (4)Objection (28)Special Inspection (30)
08/31/2026
Filed — Alteration
Remove, replace, and install new roof drains.
S00972612-P5
08/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Noel Tolentino
08/21/2026
Objection resolved — Resolved
08/14/2026
Filed — Alteration
INSTALLATION OF A NEW SPLIT AIR CONDITIONING SYSTEM IN THE GYM
S01383437-P1
08/14/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/07/2026
Objection resolved — Addressed
08/07/2026
Special inspection requirement — Duct leakage testing, insulation and design
08/05/2026
Objection raised — Other
08/05/2026
Objection raised — Other
08/03/2026
Special inspection requirement — Maintenance information
Asma Hashmi
08/03/2026
Special inspection requirement — Final
Asma Hashmi
08/03/2026
Special inspection requirement — Energy Code Compliance Inspections
Asma Hashmi
08/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Asma Hashmi
08/03/2026
Special inspection requirement — HVAC-R and service water heating system controls
Asma Hashmi
08/03/2026
Special inspection requirement — Post-installed Anchors
Asma Hashmi
08/03/2026
Special inspection requirement — HVAC-R and service water heating equipment
Asma Hashmi
08/03/2026
Special inspection requirement — Mechanical Systems
Asma Hashmi
08/03/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Asma Hashmi
07/31/2026
Filed — Alteration
Provide architectural finishes to facilitate removal of the existing walk-in freezer & installation of new walk-in freezer. Provide removal and re-installation of the ceiling in the cafeteria to facilitate the HVAC refrigerant piping routing.
S01431893-S1
07/22/2026
Filed — Alteration
Provide architectural finishes to facilitate removal of the existing walk-in freezer & installation of new walk-in freezer. Provide removal and re-installation of the ceiling in the cafeteria to facilitate the HVAC refrigerant piping routing.
S01431893-I1
07/22/2026
Special inspection requirement — Interior lighting power
07/22/2026
Special inspection requirement — Lighting controls
07/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/16/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
07/16/2026
Special inspection requirement — Maintenance information
07/16/2026
Special inspection requirement — Energy Code Compliance Inspections
07/16/2026
Special inspection requirement — HVAC-R and service water heating system controls
07/16/2026
Special inspection requirement — Post-installed Anchors
07/16/2026
Special inspection requirement — Mechanical Systems
07/16/2026
Special inspection requirement — Final
07/16/2026
Special inspection requirement — Shutoff dampers
07/16/2026
Special inspection requirement — HVAC-R and service water heating equipment
06/24/2026
Permit issued — Plumbing
S00972612-S1-PL
05/22/2026
Filed — Alteration
INSTALLATION OF A NEW SPLIT AIR CONDITIONING SYSTEM IN THE GYM
S01383437-I1
04/06/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/17/2026
Permit issued — Plumbing
S01256456-S1-PL
03/09/2026
Violation issued (ECB, open)
Construction
02/18/2026
Permit issued — Plumbing
S01256456-S1-PL
02/13/2026
Special inspection requirement — Energy Code Compliance Inspections
Asma Hashmi
02/13/2026
Special inspection requirement — Final
Asma Hashmi
02/13/2026
Special inspection requirement — Mechanical Systems
Asma Hashmi
02/13/2026
Special inspection requirement — Post-installed Anchors
Asma Hashmi
02/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Asma Hashmi
02/13/2026
Special inspection requirement — HVAC-R and service water heating system controls
Asma Hashmi
02/13/2026
Special inspection requirement — HVAC-R and service water heating equipment
Asma Hashmi
02/10/2026
Filed — Alteration
S00953362-P1
01/29/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/07/2026
Objection resolved — Addressed
01/05/2026
Permit issued — General Construction
S01256456-I1-GC
01/02/2026
Objection raised — Admin
12/29/2025
Filed — Alteration
Remove, replace, and install new roof drains.
S00972612-P4
11/13/2025
Filed — Alteration
Selective removals/disconnections: 5-WC, 2-Urinals, 2-Lavatories and Associated Valves; Installation of: 4-WC, 2-Chair Carries, 5-Flushometers, 1-Urinal, 2-Lavatories, 2-Wall Carriers, 2-Battery Faucets, 3-Drinkling Fountains in compliance with ADA requir
S01256456-P1
11/13/2025
Filed — Alteration
Selective removals/disconnections: 5-WC, 2-Urinals, 2-Lavatories and Associated Valves; Installation of: 4-WC, 2-Chair Carries, 5-Flushometers, 1-Urinal, 2-Lavatories, 2-Wall Carriers, 2-Battery Faucets, 3-Drinkling Fountains in compliance with ADA requir
S01256456-P2
10/27/2025
Violation issued (FDNY_ORDER, closed)
10/27/2025
Violation issued (FDNY_ORDER, closed)
10/27/2025
Violation issued (FDNY_ORDER, closed)
10/27/2025
Violation issued (FDNY_ORDER, closed)
10/20/2025
Violation issued (FDNY_ORDER, closed)
09/26/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/10/2025
Permit issued — General Construction
S01217082-S3-MS
Latest 60 of 173 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedVARSITY PLBG AND HTG INC06/24/2026
DOB NOWPlumbingPermit IssuedI.M.P. PLBG. & HTG. CORP03/17/2026
DOB NOWPlumbingPermit IssuedI.M.P. PLBG. & HTG. CORP02/18/2026
DOB NOWGeneral ConstructionPermit IssuedEMPIRE CONTROL ABATEMENT01/05/2026
DOB NOWGeneral ConstructionPermit IssuedAIRTONE CORP09/10/2025
DOB NOWPlumbingPermit IssuedI.M.P. PLBG. & HTG. CORP08/13/2025
DOB NOWMechanical SystemsPermit IssuedAIRTONE CORP07/21/2025
DOB NOWGeneral ConstructionPermit IssuedEMPIRE CONTROL ABATEMENT07/21/2025
DOB NOWSidewalk ShedPermit IssuedBQE INDUSTRIES, INC07/16/2025
DOB NOWSupported ScaffoldPermit IssuedBQE INDUSTRIES, INC07/15/2025
DOB NOWConstruction FencePermit IssuedBQE INDUSTRIES, INC07/15/2025
DOB NOWPlumbingPermit IssuedVARSITY PLBG AND HTG INC06/27/2025
DOB NOWSidewalk ShedPermit IssuedBQE INDUSTRIES, INC03/25/2024
DOB NOWConstruction FencePermit IssuedBQE INDUSTRIES, INC03/21/2024
DOB NOWSupported ScaffoldPermit IssuedBQE INDUSTRIES, INC03/21/2024
DOB NOWSidewalk ShedPermit IssuedBQE INDUSTRIES, INC03/23/2023
DOB NOWConstruction FencePermit IssuedBQE INDUSTRIES, INC03/23/2023
DOB NOWSupported ScaffoldPermit IssuedBQE INDUSTRIES, INC03/23/2023
DOB NOWSidewalk ShedPermit IssuedBQE INDUSTRIES, INC04/06/2022
DOB NOWSupported ScaffoldPermit IssuedBQE INDUSTRIES, INC03/25/2022
DOB NOWConstruction FencePermit IssuedBQE INDUSTRIES, INC03/25/2022
DOB NOWSupported ScaffoldPermit IssuedBQE INDUSTRIES, INC11/22/2021
DOB NOWSidewalk ShedPermit IssuedBQE INDUSTRIES, INC10/05/2021
DOB NOWConstruction FencePermit IssuedBQE INDUSTRIES, INC10/05/2021
BISOTISSUEDBQE INDUSTRIES, INC09/29/2025
BISOTISSUEDBQE INDUSTRIES, INC09/29/2025
BISOTISSUEDBQE INDUSTRIES, INC08/18/2025
BISOTISSUEDBQE INDUSTRIES, INC08/18/2025
BISPLISSUEDVARSITY PLBG AND HTG INC11/15/2024
BISOTISSUEDBQE INDUSTRIES, INC08/28/2024
BISOTISSUEDBQE INDUSTRIES, INC08/28/2024
BISOTISSUEDBQE INDUSTRIES, INC08/29/2023
BISOTISSUEDBQE INDUSTRIES, INC08/29/2023
BISPLISSUEDVARSITY PLBG AND HTG INC11/28/2022
BISOTISSUEDBQE INDUSTRIES, INC09/07/2022
BISOTISSUEDBQE INDUSTRIES, INC09/07/2022
BISOTISSUEDBQE INDUSTRIES, INC03/30/2022
BISOTISSUEDBQE INDUSTRIES, INC03/30/2022
BISOTISSUEDBQE INDUSTRIES, INC12/14/2021
BISOTISSUEDBQE INDUSTRIES, INC12/14/2021
+ 24 more permits on file
4 projects · most recent 08/31/2026
Air Conditioning Systems Ventilation Systems Heating and Air Conditioning Systems Others Refrigeration Systems
FiledStatusContractorScopeMake / Model / Capacity
08/31/2026——Heating and Air Conditioning Systems
Heat / Cool
Trane TUHYH1203AN40AN 120,000 BTU · Condensing Unit ×8
York YLAA0082HJ17XFB 78 tons · Chiller ×4
Taco CSAA021 431,000 BTU ×1
— CSAA021 431,000 BTU ×1
08/14/2026——Air Conditioning Systems
Cooling
Lg LG ZRNU363SRAA 35,000 BTU · Fan Coil Indoor ×12
LG MULTI V i ZRUM144BTE6 144,000 BTU · Vrf Outdoor ×2
LG MULTI V i ZRUM096BTE6 96,000 BTU · Vrf Outdoor ×2
LG ZRNU243SKSA 24,000 BTU · Vrf Indoor ×2
07/31/2026——Air Conditioning Systems, Ventilation Systems
Cooling
Mitsubishi Electric PKA-AL12NL 12,000 BTU · Split System ×1
PUZ-AK12NL 12,000 BTU · Split System ×1
Ventilation
Greenheck SQ-97-VG 150 CFM · Exhaust Fan ×1
08/29/2025Permit IssuedAIRTONE CORPOthers, Refrigeration Systems, Ventilation Systems
Ventilation
Anemostat 30-45 780 CFM · Exhaust Fan ×10
EPL 300 CFM ×6
FFBF-100 30 CFM ×2
Mitsubishi Electric TLGHF0600RVX02A 235 CFM · Erv ×2
TLGHF1200RVX02A 360 CFM · Erv ×2
TUHP0723AN40AN 72,000 BTU · Condensing Unit ×2
TUHYP0723AN40AN 72,000 BTU · Vrf Outdoor ×2
Greenheck G-0600-VG 75 CFM · Exhaust Fan ×2
Refrigeration
Mitsubishi Electric PEFY-P15NMHU-E2 130 CFM · Vrf Indoor ×2
PEFY-P48NMHU-E2 700 CFM · Vrf Indoor ×2
PEFY_O36NMHU-E2 185 CFM · Vrf Indoor ×2
Beckett BK221TUL 120 kW · Pump ×2
Other
Finelite HPR-SL-ANR-2X4-B-835-DCO-96LG-120-SC-FC 31 kW ×48
HP-2-P-ID-4FT-S-B-835-F-F 33 kW ×20
HPR-SL-ANR-2X4-S-835-DCO-96LG 23 kW ×16
HP-2-P-I-2FT-S-B-835-F-F 15 kW ×2
3 projects · most recent 08/31/2026
Water/Sanitary Gas Storm
FiledStatusContractorScope
08/31/2026Permit IssuedVARSITY PLBG AND HTG INCGas, Storm
11/13/2025Permit IssuedI.M.P. PLUMBING & HEATING CORP.Water/Sanitary
08/29/2025Permit IssuedI.M.P. PLBG. & HTG. CORPWater/Sanitary
15 projects · most recent 05/18/2026
General Wiring
FiledStatusContractorScope
05/18/2026CancelledSTANCO SYSTEM ELEC'L CONT—
03/26/2026CompleteI.S.M. ELECTRIC, INC.General Wiring
01/14/2026Permit IssuedNEW PHASE ELEC'L CONTR'SGeneral Wiring
07/15/2025Permit IssuedKLK ELECTRIC, INCGeneral Wiring
06/25/2025CompleteEVEREST ELECTRIC CORP—
05/08/2024Permit IssuedBZ ELECTRIC, INCGeneral Wiring
04/15/2024CompleteGEMINI ELECTRIC CO., INC.—
01/03/2023Permit IssuedA & S ELECTRIC INC.General Wiring
04/05/2022Permit IssuedGEMINI ELECTRIC CO., INC.General Wiring
10/15/2021Permit IssuedSTANCO SYSTEM ELEC'L CONT—
10/05/2021Permit IssuedSTANCO SYSTEM ELEC'L CONT—
05/28/2021Permit IssuedA & S ELECTRIC INC.General Wiring
01/29/2020Permit IssuedCHARAN ELEC'L ENTERP'S INGeneral Wiring
07/05/2019Permit IssuedA & S ELECTRIC INC.General Wiring
12/07/2018CompleteCHARAN ELEC'L ENTERP'S IN—
1 project · most recent 09/08/2021
Scaffold
FiledStatusContractorScope
09/08/2021Permit IssuedBQE INDUSTRIES, INCScaffold
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
08/14/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/06/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/29/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/26/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 101
DateRequirementInspectorRole
08/26/2026Fire-Resistant Penetrations and JointsNoel Tolentinospecial
08/07/2026Duct leakage testing, insulation and design—energy_progress
08/03/2026HVAC-R and service water piping design and insulationAsma Hashmienergy_progress
08/03/2026Maintenance informationAsma Hashmienergy_progress
08/03/2026HVAC-R and service water heating equipmentAsma Hashmienergy_progress
08/03/2026HVAC-R and service water heating system controlsAsma Hashmienergy_progress
08/03/2026Mechanical SystemsAsma Hashmispecial
08/03/2026Post-installed AnchorsAsma Hashmispecial
08/03/2026Energy Code Compliance InspectionsAsma Hashmiprogress
08/03/2026FinalAsma Hashmiprogress
08/03/2026Fire-Resistant Penetrations and JointsAsma Hashmispecial
07/22/2026Interior lighting power—energy_progress
07/22/2026Lighting controls—energy_progress
07/16/2026HVAC-R and service water heating equipment—energy_progress
07/16/2026Fire-Resistant Penetrations and Joints—special
07/16/2026Post-installed Anchors—special
07/16/2026Mechanical Systems—special
07/16/2026Final—progress
07/16/2026Energy Code Compliance Inspections—progress
07/16/2026HVAC-R and service water piping design and insulation—energy_progress
07/16/2026Shutoff dampers—energy_progress
07/16/2026Maintenance information—energy_progress
07/16/2026HVAC-R and service water heating system controls—energy_progress
02/13/2026Fire-Resistant Penetrations and JointsAsma Hashmispecial
02/13/2026Mechanical SystemsAsma Hashmispecial
Latest 25 of 101.
▾Documents — 194 on file (BIS + DOB NOW)
▸Plans & Drawings26
▸DOB NOWPlans/Sketch26
08/25/2026S00579071-I1Request digital key ↗
08/25/2026S00579112-I1Request digital key ↗
08/21/2026S01044949-I1Request digital key ↗
Showing 3 of 26 on file for this type
▸Seals & Professional Certifications67
▸DOB NOWDPL-1: Design Professional Seal & Signature27
09/22/2026S00972612-P5Open ↗
08/25/2026S00579112-I1Open ↗
08/21/2026S01044949-S2Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWProgress Inspector Seal & Signature24
09/03/2026S00972612-I1Open ↗
09/03/2026S00972612-I1Open ↗
09/02/2026S01217082-I1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature16
09/23/2026S00972612-P5Open ↗
09/03/2026S00972612-I1Open ↗
09/02/2026S01217082-I1Open ↗
Showing 3 of 16 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWNYCSCA - Approved Site Safety Plans3
08/13/2026S00579112-I1Open ↗
08/13/2026S00579094-I1Open ↗
08/13/2026S00579071-I1Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/21/2026S00953362-I1Open ↗
08/17/2026S01256456-P2Open ↗
08/17/2026S01256456-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/13/2026S01217082-S2Open ↗
08/13/2026S01217082-I1Open ↗
08/13/2026S01217082-S3Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs64
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter27
09/22/2026S00972612-P5Open ↗
08/25/2026S00579112-I1Open ↗
08/21/2026S00953362-I1Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)25
09/22/2026S00972612-P5Open ↗
08/21/2026S00953362-I1Open ↗
08/17/2026S00972612-P1Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)8
08/13/2026S01256456-S1Open ↗
08/13/2026S00579094-I1Open ↗
08/13/2026S01217082-S2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDEP Variance (V5) letter4
08/13/2026S01217082-I1Open ↗
08/13/2026S01217082-S2Open ↗
08/13/2026S01217082-S3Open ↗
Showing 3 of 4 on file for this type
▸Other Documents24
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal24
08/21/2026S00953362-I1Open ↗
08/17/2026S00972612-S1Open ↗
08/17/2026S00972612-I1Open ↗
Showing 3 of 24 on file for this type