← Back
Two stories - detached, small or mid-size
1911 HARRISON AVENUE
BRONX · BIN 2008563
💬 Discuss this project
1920Year Built
3Stories
A1Building Class
R7-1Zoning
2,975 sfGross Floor Area
1Units
26 Open Violations 25 unresolved · 1 paperwork only ▸FDNY Report ↗
Two stories - detached, small or mid-size · 3,640 sf lot · 0.82 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Roof4p · 1 filing · 20 docs
Bulkhead1p · 1 filing · 20 docs
Floor 82p · 1 filing · 20 docs
Floor 72p · 1 filing · 20 docs
Floor 62p · 1 filing · 20 docs
Floor 52p · 1 filing · 20 docs
Floor 42p · 1 filing · 20 docs
Floor 32p · 1 filing · 20 docs
Floor 22p · 1 filing · 20 docs
Floor 11p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/26/2025$1.2M—Private party → 1911 HARRISON LLC$403/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NODE ARCHITECTURE,ENGINEERING, CONS408/19/2026
HAZI ENGINEERING301/22/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KC EXPEDITING203/21/2026
NODE ARCHITECTURE,ENGINEERING,CON603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AMERICAN QUALITY CONSTRUCGeneral Contractor204/09/2026
BROOKDALE CONSTRGeneral Contractor109/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FENAGH, INC6942108/19/2026
Building Lifecycle
All (80)Filed (9)Signed Off (1)Violation (27)Objection (13)Special Inspection (30)
08/19/2026
Filed — New Building
ERECTION OF A NEW 8 STORY RESIDENTIAL BUILDING PERSUANT TO UAP REGULATIONS
X01281979-S7
08/19/2026
Filed — New Building
ERECTION OF A NEW 8 STORY RESIDENTIAL BUILDING PERSUANT TO UAP REGULATIONS
X01281979-S4
08/19/2026
Filed — New Building
ERECTION OF A NEW 8 STORY RESIDENTIAL BUILDING PERSUANT TO UAP REGULATIONS
X01281979-S6
08/19/2026
Special inspection requirement — Maintenance information
08/19/2026
Special inspection requirement — Fire-Resistance Rated Construction
08/19/2026
Special inspection requirement — Energy Code Compliance Inspections
08/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/19/2026
Special inspection requirement — HVAC-R and service water heating system controls
08/19/2026
Special inspection requirement — Energy Code Compliance Inspections
08/19/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
08/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/19/2026
Special inspection requirement — Maintenance information
08/19/2026
Special inspection requirement — HVAC-R and service water heating equipment
08/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/19/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
08/14/2026
Special inspection requirement — Shutoff dampers
08/14/2026
Special inspection requirement — HVAC-R and service water heating equipment
08/14/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
08/14/2026
Special inspection requirement — HVAC-R and service water heating system controls
05/28/2026
Objection resolved — Addressed
05/28/2026
Special inspection requirement — Deep Foundation Elements
05/28/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
05/28/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
05/26/2026
Objection resolved — Open
05/26/2026
Special inspection requirement — Construction Operations Influencing Adjacent Structures
05/26/2026
Special inspection requirement — Subgrade Inspections
04/16/2026
Signed off — Full Demolition
FILING TO FULLY DEMOLISH THE DETACHED BUILDING BY HAND
X01258984-I1
03/20/2026
Objection resolved — Resolved
02/24/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
SAMER ABOU-GHAIDA
02/19/2026
Objection raised — Other
02/19/2026
Objection raised — Other
02/07/2026
Objection raised — Other
02/04/2026
Objection raised — Admin
02/04/2026
Objection resolved — Addressed
01/22/2026
Filed — New Building
ERECTION OF A NEW 8 STORY RESIDENTIAL BUILDING PERSUANT TO UAP REGULATIONS
X01281979-S2
01/22/2026
Filed — New Building
ERECTION OF A NEW 8 STORY RESIDENTIAL BUILDING PERSUANT TO UAP REGULATIONS
X01281979-S1
01/22/2026
Filed — New Building
ERECTION OF A NEW 8 STORY RESIDENTIAL BUILDING PERSUANT TO UAP REGULATIONS
X01281979-S3
01/21/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
01/21/2026
Special inspection requirement — Subgrade Inspections
AILANTO DANIEL MINAWI
01/21/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
AILANTO DANIEL MINAWI
01/21/2026
Special inspection requirement — Concrete - Cast-In-Place
AILANTO DANIEL MINAWI
01/20/2026
Objection resolved — Addressed
01/20/2026
Special inspection requirement — Sprinkler Systems
01/20/2026
Special inspection requirement — Final
01/20/2026
Special inspection requirement — Mechanical Systems
01/20/2026
Special inspection requirement — Final
AILANTO DANIEL MINAWI
01/14/2026
Objection raised — Admin
01/05/2026
Objection resolved — Addressed
12/29/2025
Objection raised — Admin
12/12/2025
Objection raised — Other
12/10/2025
Filed — Full Demolition
FILING TO FULLY DEMOLISH THE DETACHED BUILDING BY HAND
X01258984-I1
12/10/2025
Filed — Full Demolition
FILING TO FULLY DEMOLISH THE DETACHED BUILDING BY HAND
X01258984-S1
11/12/2025
Filed — New Building
ERECTION OF A NEW 8 STORY RESIDENTIAL BUILDING PERSUANT TO UAP REGULATIONS
X01281979-I1
09/24/2025
Violation issued (HPD, open)
B
09/17/2025
Violation issued (HPD, open)
A
09/17/2025
Violation issued (HPD, open)
B
09/17/2025
Violation issued (HPD, open)
A
09/17/2025
Violation issued (HPD, open)
B
09/17/2025
Violation issued (HPD, open)
B
09/17/2025
Violation issued (HPD, closed)
A
Latest 60 of 80 events.
Nothing on file for this building.
1 project · most recent 08/19/2026
Concrete
FiledStatusContractorScope
08/19/2026Permit IssuedBROOKDALE CONSTR LLCConcrete
1 project · most recent 12/10/2025
Fence
FiledStatusContractorScope
12/10/2025Signed-offAMERICAN QUALITY CONSTRUCFence
1 project · most recent 12/10/2025
Full Demolition Notification
FiledStatusContractorScope
12/10/2025Signed-offAMERICAN QUALITY CONSTRUCFull Demolition Notification
▾Special Inspection Requirements (DOB NOW) — 49
DateRequirementInspectorRole
08/19/2026Maintenance information—energy_progress
08/19/2026Fire-Resistance Rated Construction—progress
08/19/2026Energy Code Compliance Inspections—progress
08/19/2026Fire-Resistant Penetrations and Joints—special
08/19/2026HVAC-R and service water heating system controls—energy_progress
08/19/2026Energy Code Compliance Inspections—progress
08/19/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
08/19/2026Fire-Resistant Penetrations and Joints—special
08/19/2026Maintenance information—energy_progress
08/19/2026HVAC-R and service water heating equipment—energy_progress
08/19/2026Fire-Resistant Penetrations and Joints—special
08/19/2026HVAC-R and service water piping design and insulation—energy_progress
08/14/2026Shutoff dampers—energy_progress
08/14/2026HVAC-R and service water heating equipment—energy_progress
08/14/2026HVAC-R and service water piping design and insulation—energy_progress
08/14/2026HVAC-R and service water heating system controls—energy_progress
05/28/2026Deep Foundation Elements—special
05/28/2026Subsurface Conditions – Fill Placement & In-Place Density—special
05/28/2026Subsurface Investigations (Borings/Test Pits)—special
05/26/2026Construction Operations Influencing Adjacent Structures—special
05/26/2026Subgrade Inspections—special
02/24/2026Subsurface Investigations (Borings/Test Pits)SAMER ABOU-GHAIDAspecial
01/21/2026Excavations - Sheeting, Shoring, and Bracing—special
01/21/2026Subgrade InspectionsAILANTO DANIEL MINAWIspecial
01/21/2026Subsurface Conditions – Fill Placement & In-Place DensityAILANTO DANIEL MINAWIspecial
Latest 25 of 49.
▾Documents — 41 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/17/2026X01258984-S1Request digital key ↗
08/17/2026X01258984-I1Request digital key ↗
08/15/2026X01281979-S2Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/15/2026X01281979-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/15/2026X01281979-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/15/2026X01281979-I1Open ↗
▸Seals & Professional Certifications11
▸DOB NOWSpecial Inspector Seal & Signature4
09/24/2026X01281979-S2Open ↗
09/24/2026X01281979-S2Open ↗
09/24/2026X01281979-S2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/17/2026X01281979-S3Open ↗
08/17/2026X01281979-I1Open ↗
08/17/2026X01281979-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
09/24/2026X01281979-S2Open ↗
09/24/2026X01281979-S2Open ↗
▸DOB NOWCONTRACTOR SEAL & SIGNATURE1
08/13/2026X01258984-I1Open ↗
▸Trade Schedules & Equipment5
▸DOB NOWElectric Cut-Off1
08/13/2026X01258984-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026X01258984-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026X01258984-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026X01258984-I1Open ↗
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/15/2026X01281979-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist1
08/15/2026X01281979-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/15/2026X01281979-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026X01258984-I1Open ↗
08/13/2026X01258984-S1Open ↗
▸DOB NOWRodent Control1
08/13/2026X01258984-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWTR4 Test Report and Plot Diagram2
08/15/2026X01281979-S2Open ↗
08/14/2026X01281979-S1Open ↗
▸DOB NOWSOIL REPORT2
08/15/2026X01281979-S2Open ↗
08/14/2026X01281979-S1Open ↗
▸Other Documents7
▸DOB NOWProperty Ownership Certification2
08/15/2026X01281979-I1Open ↗
08/13/2026X01258984-I1Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026X01258984-I1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026X01258984-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/15/2026X01281979-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/15/2026X01281979-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026X01258984-I1Open ↗