Elevator apt, semi-fireproof with stores
Ralph Lauren Center for Cancer Care and Prevention
1911 MADISON AVENUE · BIN 1081462
💬 Discuss this project
1997Year Built
8Stories
D7Building Class
R7-2Zoning
194,030 sfGross Floor Area
156Units
LL97 CoveredRent Stabilized56 Open Violations ▸FISP: SAFEFDNY Report ↗
Elevator apt, semi-fireproof with stores · Owner of record: MAPLE PLAZA HOUSING DEVELOPMENT INC · 81,741 sf lot · 2.37 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
Roof2p · 2 filings · 11 docs
Floor 21p · 1 filing · 5 docs
Floor 1Under Construction5p · 2 filings · 14 docs
Cellar1p · 1 filing · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ACE GROUP NY607/08/2026
MAPLE PLAZA HOUSING DEVELOPMENT COR704/09/2026
NORTH GENERAL HOSPITAL1003/22/2026
MAPLE PLAZA203/22/2026
MAPLE PLAZA HDFC1803/21/2026
HALSTEAD MANAGEMENT COMPANY203/21/2026
PRESIDENT303/21/2026
MAPLE HOUSING DEVELOPMENT FUND203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARADIGM ARCHITECTURE108/09/2023
FL&M ENGINEERING DESIGN &INSPECTION102/10/2023
SILMAN110/30/2019
TIMOTHY E. KRAWETZ308/16/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GREEN STUDIO203/21/2026
MUNICIPAL BUILDING CONSULTANTS103/21/2026
GILLMAN CONSULTING803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ACE GROUP NY CORPGeneral Contractor407/08/2026
WATSON'S PLBG, HTG, & BDGPlumbing203/22/2026
POS ELECTRICAL CONTRS INCElectrical103/22/2026
RICHARD BOLLElectrical103/21/2026
LEVINE, GEORGEFire Protection103/21/2026
BOLL RICHARDElectrical103/21/2026
RAJPUT RESTORATION INCGeneral Contractor104/09/2026
PAR PLUMBING CO., INCPlumbing107/08/2026
PAR FIRE PROTECTION LLCFire Protection107/08/2026
GOTHAM WIRING LICENSEDElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EMPIRE DESIGN CORP5474108/09/2023
AKF ENGINEERS, LLP2751208/16/2019
Building Lifecycle
All (111)Filed (6)Permit Issued (5)Signed Off (1)Facade (FISP) (15)Violation (60)Objection (16)Special Inspection (8)
04/29/2026
Violation issued (HPD, open)
C
04/29/2026
Violation issued (HPD, open)
C
04/29/2026
Violation issued (HPD, open)
C
04/29/2026
Violation issued (HPD, open)
C
04/29/2026
Violation issued (HPD, open)
A
04/29/2026
Violation issued (HPD, open)
A
04/29/2026
Violation issued (HPD, open)
C
04/15/2026
Violation issued (HPD, open)
B
04/15/2026
Violation issued (HPD, open)
C
04/15/2026
Violation issued (HPD, open)
B
03/26/2025
Violation issued (FDNY_NOV, closed)
04/29/2024
Cycle 9 facade report signed — SAFE
04/11/2024
Cycle 9 facade report submitted
03/26/2024
Cycle 9 facade inspection completed
03/19/2024
Signed off — Alteration
Exterior restoration to include brick replacement, lintel replacement, concrete crack repair, cutting and pointing as per plans filed herewith. No change to use, egress or occupancy.
M00911758-I1
02/26/2024
Permit issued — Sidewalk Shed
M00825854-I1-SH
11/01/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/13/2023
Permit issued — General Construction
M00911758-I1-GC
08/11/2023
Objection raised — Scope
08/11/2023
Objection resolved — Addressed
08/09/2023
Filed — Alteration
Exterior restoration to include brick replacement, lintel replacement, concrete crack repair, cutting and pointing as per plans filed herewith. No change to use, egress or occupancy.
M00911758-I1
08/01/2023
Special inspection requirement — Tenant Protection Plan Compliance
Md Rashid
07/31/2023
Special inspection requirement — Final
Anthony Addesso
04/22/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/24/2023
Special inspection requirement — Structural Steel - Welding
02/20/2023
Cycle 9 facade report submitted
02/20/2023
Cycle 9 facade report signed — UNSAFE
02/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/10/2023
Filed — Alteration
M00825854-I1
02/10/2023
Permit issued — Sidewalk Shed
M00825854-I1-SH
01/25/2023
Cycle 9 facade inspection completed
09/20/2022
Special inspection requirement — Structural Steel - Details
08/21/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/29/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/28/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/27/2020
Cycle 8 facade report submitted
01/26/2020
Cycle 8 facade report signed — SWARMP
01/21/2020
Cycle 8 facade inspection completed
12/27/2019
Violation issued (FDNY_NOV, closed)
11/19/2019
Objection raised — Admin
11/11/2019
Objection resolved — Addressed
11/11/2019
Objection resolved — Addressed
11/04/2019
Objection raised — Structural
11/04/2019
Objection raised — Inspections
11/04/2019
Objection raised — Admin
10/31/2019
Permit issued — Plumbing
M00202510-I1-PL
10/30/2019
Filed — Alteration
M00192301-I1
10/24/2019
Permit issued — Sprinklers
M00202467-I1-EW-SP
08/30/2019
Objection resolved — Addressed
08/29/2019
Objection resolved — Addressed
08/29/2019
Objection resolved — Addressed
08/29/2019
Objection resolved — Addressed
08/23/2019
Objection raised — Other
08/23/2019
Objection raised — Other
08/23/2019
Objection raised — Other
08/23/2019
Objection raised — Other
08/16/2019
Filed — Alteration
Remove and install new plumbing fixtures and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.
M00202510-I1
08/16/2019
Filed — Alteration
Relocate sprinkler heads and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.
M00202467-I1
08/14/2019
Filed — Alteration
M00202563-I1
Latest 60 of 111 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedACE GROUP NY CORP02/26/2024
DOB NOWGeneral ConstructionSigned-offRAJPUT RESTORATION INC09/13/2023
DOB NOWSidewalk ShedPermit IssuedACE GROUP NY CORP02/10/2023
DOB NOWPlumbingSigned-offPAR PLUMBING CO., INC10/31/2019
DOB NOWSprinklersPermit IssuedLAWRENCE J. LEVINE10/24/2019
BISOTISSUEDMICHAEL ANTHONY CONTRACTING06/03/2020
BISOTISSUEDMICHAEL ANTHONY CONTRACTING09/18/2019
BISSPISSUEDCURRENT FIRE PROTECTION INC04/16/2019
BISOTISSUEDPRATT CONSTRUCTION & REST05/17/2018
BISOTISSUEDPRATT CONSTRUCTION & REST05/10/2018
BISEQISSUEDINTERSYSTEM S&S CORP03/15/2018
BISEQISSUEDINTERSYSTEM S&S CORP03/15/2018
BISEQISSUEDINTERSYSTEM S&S CORP02/09/2018
BISOTISSUEDPRATT CONSTRUCTION & REST06/30/2017
BISEQISSUEDINTERSYSTEM S&S CORP04/11/2017
BISEQISSUEDINTERSYSTEM S&S CORP04/07/2017
BISEQISSUEDINTERSYSTEM S&S CORP02/23/2017
BISOTISSUEDPRATT CONSTRUCTION & REST05/24/2016
BISEQISSUEDINTERSYSTEM S&S CORP02/29/2016
BISEQISSUEDINTERSYSTEM S&S CORP02/26/2016
BISOTISSUEDPRATT CONSTRUCTION & REST02/25/2016
BISSPISSUEDCURRENT FIRE PROTECTION INC11/07/2007
BISPLISSUEDOLYMPIC PLBG & HTG SVC IN10/04/2007
BISOTISSUEDSKANSKA USA BUILDING, INC09/21/2007
BISEQISSUEDADVANCED INSTALLATIONS INC07/18/2007
BISOTISSUEDTWO-TONE CONTRACTING CORP.01/23/2007
BISOTISSUEDQUALITY BUILDING CONTRACTOR INC03/29/2004
BISEQISSUEDSTEEL INDUSTRIES03/29/2004
BISPLISSUEDPAR PLUMB CO INC.02/11/2004
BISBLISSUEDMETROPOLITAN HEAT & POWER CO07/29/2003
BIS—ISSUEDINTERBORO SIGN AND MAINTENANCE04/30/2003
BIS—ISSUEDINTERBORO SIGN AND MAINTENANCE04/30/2003
BISOTISSUEDINTERBORO SIGN AND MAINTENANCE04/30/2003
BIS—ISSUEDBARNEY SKANSKA10/08/2002
BISEQISSUEDSPARROW CONSTRUCTION CORP09/24/1999
BIS—ISSUEDSPARROW CONSTRUCTION CORP09/24/1999
BISOTISSUEDSPARROW CONST01/29/1999
BISPLISSUEDMEDCO PLUMBING INC11/13/1998
BISEQISSUEDSPARROW CONSTRUCTION CORP09/23/1998
BIS—ISSUEDSPARROW CONSTRUCTION CORP09/23/1998
+ 9 more permits on file
1 job · most recent 08/16/2019
FiledStatusContractorScope
08/16/2019Permit IssuedPAR FIRE PROTECTION LLC6 heads
1 job · most recent 08/16/2019
Water/Sanitary
FiledStatusContractorScope
08/16/2019Signed-offPAR PLUMBING CO., INCWater/Sanitary
8 jobs · most recent 10/20/2025
General Wiring
FiledStatusContractorScope
10/20/2025CompleteR & T ELECTRICAL CORP—
11/01/2021Permit IssuedROBERT CHIMENTI78 meters, 1 new_meters
04/30/2021CompletePOS ELECTRICAL CONTRS INC—
01/11/2021CompleteGOTHAM WIRING LICENSED—
11/21/2019Permit IssuedTOM FITZPATRICK ELECTRICAGeneral Wiring
10/02/2019Permit IssuedNJS ELEC'L SERVICES CORP.General Wiring
10/11/2018CompleteBAY ELECTRIC INC.General Wiring
12/15/2017Permit IssuedBAY ELECTRIC INC.General Wiring
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
08/01/2023Tenant Protection Plan ComplianceMd Rashidspecial
07/31/2023FinalAnthony Addessoprogress
02/24/2023Structural Steel - Welding—special
09/20/2022Structural Steel - Details—special
07/30/2019Sprinkler SystemsRobert Gibsonspecial
07/11/2019Concrete - Cast-In-Place—special
07/11/2019Structural Steel - High Strength Bolting—special
07/11/2019Final—progress
▾Documents — 178 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch2
08/31/2026M00825854-I1Request digital key ↗
08/29/2026M00911758-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/05/2026M00192301-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/05/2026M00202563-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/05/2026M00202510-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
08/14/2026M00202467-I1Request digital key ↗
▸Applications & Permits33
▸BISPLAN / WORK APPROVAL APPLICATION18
07/10/2019123813374Open ↗
04/09/2019123861419Open ↗
04/09/2019123522697Open ↗
Showing 3 of 18 on file for this type
▸BISWORK PERMIT APPLICATION15
09/18/2019123813374Open ↗
04/16/2019123861419Open ↗
05/22/2018121232415Open ↗
Showing 3 of 15 on file for this type
▸Seals & Professional Certifications42
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION10
09/18/2019123813374Open ↗
07/10/2019123813374Open ↗
04/09/2019123861419Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT9
04/09/2019123861419Open ↗
05/08/2018123601655Open ↗
06/28/2017121232415Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/05/2026M00202563-I1Open ↗
09/05/2026M00192301-I1Open ↗
08/31/2026M00825854-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
04/09/2019123861419Open ↗
05/08/2018123601655Open ↗
06/28/2017121232415Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
04/10/2017140628300Open ↗
04/06/2017140627089Open ↗
02/26/2016140463291Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
04/10/2017140628300Open ↗
04/06/2017140627089Open ↗
02/26/2016140463291Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/24/2026M00911758-I1Open ↗
08/23/2026M00202467-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
04/06/2015140307530Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/24/2026M00911758-I1Open ↗
▸Trade Schedules & Equipment3
▸BISFA - FDNY APPROVAL : FD-FAA1
04/02/2021123522697Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
04/09/2019123861419Open ↗
▸BISEQUIPMENT USE PERMITS1
03/13/2019140307530Open ↗
▸Safety & Tenant Protection11
▸BISTENANT PROTECTION PLAN AND NOTES7
04/10/2017140628300Open ↗
04/06/2017140627089Open ↗
02/26/2016140463291Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWTenant Protection Plan4
09/05/2026M00192301-I1Open ↗
08/13/2026M00202563-I1Open ↗
08/13/2026M00202510-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos16
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
07/10/2019123813374Open ↗
04/09/2019123861419Open ↗
04/09/2019123522697Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/05/2026M00202563-I1Open ↗
08/13/2026M00202467-I1Open ↗
08/13/2026M00202510-I1Open ↗
▸DOB NOWOER: Notice to Proceed3
08/13/2026M00202510-I1Open ↗
08/13/2026M00202467-I1Open ↗
08/13/2026M00911758-I1Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION2
06/25/2021123861419Open ↗
06/15/2021123522697Open ↗
▸DOB NOWOER: Notice of Satisfaction2
08/13/2026M00202510-I1Open ↗
08/13/2026M00911758-I1Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
08/09/2019123813374Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
09/18/2019123813374Open ↗
07/10/2019123813374Open ↗
12/06/2018123601655Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
12/06/2018123601655Open ↗
12/06/2018121232415Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
02/25/2016140463031Open ↗
▸Inspections & Test Reports10
▸BISTECHNICAL REPORT: RESPONSIBILITY9
06/25/2021123861419Open ↗
06/25/2021123861419Open ↗
04/10/2017140628300Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: PILE DRIVING1
01/03/2017140463031Open ↗
▸Approvals, Objections & Sign-offs8
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
10/24/2025123861419Open ↗
06/16/2021123522697Open ↗
03/13/2019140307530Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
04/09/2019123861419Open ↗
02/14/2018140463031Open ↗
▸BISSHED LETTER1
03/02/2017140463031Open ↗
▸Cost, Insurance & Ownership12
▸BISCOST AFFIDAVIT10
07/10/2019123813374Open ↗
04/09/2019123861419Open ↗
04/09/2019123522697Open ↗
Showing 3 of 10 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
06/29/2021123861419Open ↗
06/15/2021123522697Open ↗
▸Filing & Intake Forms24
▸BISBOROUGH INTAKE FORM8
02/13/2019140307530Open ↗
01/07/2019140307530Open ↗
12/24/2018140307530Open ↗
Showing 3 of 8 on file for this type
▸BISADDITIONAL INFORMATION6
07/24/2018140463031Open ↗
06/07/2017140627089Open ↗
01/17/2017140463031Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING COVER SHEET5
07/10/2019123813374Open ↗
04/09/2019123861419Open ↗
04/09/2019123522697Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
04/10/2017140628300Open ↗
04/06/2017140627089Open ↗
02/26/2016140463291Open ↗
Showing 3 of 5 on file for this type
▸Other Documents4
▸DOB NOWDHCR Document4
09/05/2026M00192301-I1Open ↗
08/13/2026M00202563-I1Open ↗
08/13/2026M00202467-I1Open ↗
Showing 3 of 4 on file for this type