← Back
Church, synagogue, chapel
0263-StThomasAquinas-School
1912 CROTONA PARKWAY · West Farms · BIN 2010618
💬 Discuss this project
1924Year Built
4Stories
M1Building Class
R7-1Zoning
42,600 sfGross Floor Area
1Units
LL97 Covered10 Open Violations ▸
Church, synagogue, chapel · 32,900 sf lot · 1.29 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof2p · 1 filing · 10 docs
Floor 412p · 1 filing · 20 docs
Floor 312p · 1 filing · 20 docs
Floor 2
Floor 113p · 2 filings · 20 docs
Sub-Basement8p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BOLD CHARTER SCHOOL1307/08/2026
THE CHURCH OF ST. THOMAS103/22/2026
SAINT THOMAS AQUINAS CHURCH103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TOWER CONSULTING ENGINEERS212/23/2025
OLA CONSULTING ENGINEERS, PC510/08/2024
EPSTEIN ARCHITECTURE207/17/2024
ROYAL ENGINEERING, P.C406/03/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EXPERT GROUPENTERPRISE INGeneral Contractor807/08/2026
AMERICAN STANDARD P&H CORORP.Plumbing607/08/2026
SIGNATURE CONSTRUCTION GROUPGeneral Contractor207/08/2026
ORLANDO TORRESElectrical103/21/2026
STEVEN MAUCERIElectrical103/21/2026
TORRES ORLANDOElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PROJECT TACTICAL SOLUTION5859710/08/2024
Building Lifecycle
All (99)Filed (13)Permit Issued (7)Signed Off (4)Violation (46)Inspection (4)Special Inspection (25)
12/23/2025
Filed — Alteration
X01320129-I1
12/23/2025
Filed — Alteration
X01326297-I1
12/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
11/17/2025
Special inspection requirement — Final
10/09/2024
Special inspection requirement — Mechanical Systems
Max Lee
10/09/2024
Special inspection requirement — Final
Max Lee
10/09/2024
Special inspection requirement — Maintenance information
Max Lee
10/08/2024
Filed — Alteration
Installation of new air conditioning units, toilet exhausts and associated duct work.
X01020137-P5
09/30/2024
Special inspection requirement — Maintenance information
Max Lee
09/30/2024
Special inspection requirement — Mechanical Systems
Max Lee
09/30/2024
Special inspection requirement — Final
Max Lee
09/03/2024
Signed off — Alteration
Installation of new air conditioning units, toilet exhausts and associated duct work.
X01020137-S2
09/03/2024
Signed off — Alteration
Installation of new air conditioning units, toilet exhausts and associated duct work.
X01020137-I1
08/08/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/03/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/18/2024
Special inspection requirement — Maintenance information
Max Lee
07/18/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Max Lee
07/18/2024
Special inspection requirement — Energy Code Compliance Inspections
Max Lee
07/18/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Max Lee
07/17/2024
Filed — Alteration
Installation of new air conditioning units, toilet exhausts and associated duct work.
X01020137-P1
07/17/2024
Filed — Alteration
Installation of new air conditioning units, toilet exhausts and associated duct work.
X01020137-P3
07/17/2024
Filed — Alteration
Installation of new air conditioning units, toilet exhausts and associated duct work.
X01020137-P2
07/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Max Lee
07/16/2024
Special inspection requirement — Maintenance information
Max Lee
07/16/2024
Special inspection requirement — Energy Code Compliance Inspections
Max Lee
07/16/2024
Special inspection requirement — Maintenance information
Max Lee
07/16/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Max Lee
07/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Max Lee
07/16/2024
Special inspection requirement — Final
Max Lee
07/16/2024
Special inspection requirement — Fire-Resistance Rated Construction
Max Lee
07/16/2024
Special inspection requirement — Mechanical Systems
Max Lee
07/16/2024
Special inspection requirement — Final
Max Lee
07/16/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Max Lee
07/16/2024
Special inspection requirement — HVAC-R and service water heating equipment
Max Lee
07/16/2024
Special inspection requirement — HVAC-R and service water heating system controls
Max Lee
07/09/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/26/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/12/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/22/2024
Permit issued — Plumbing
X01020137-S2-PL
05/21/2024
Permit issued — General Construction
X01020137-I1-GC
05/21/2024
Permit issued — Mechanical Systems
X01020137-S1-MS
05/07/2024
Filed — Alteration
Installation of new air conditioning units, toilet exhausts and associated duct work.
X01020137-S2
05/07/2024
Filed — Alteration
Installation of new air conditioning units, toilet exhausts and associated duct work.
X01020137-S1
05/06/2024
Filed — Alteration
Installation of new air conditioning units, toilet exhausts and associated duct work.
X01020137-I1
05/03/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/22/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/01/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/02/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/02/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/17/2023
Signed off — Alteration
X00063175-I1
05/02/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/02/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/02/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/02/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2019
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
X00063172-I1
06/03/2019
Filed — Alteration
X00063175-P2
10/24/2018
Filed — Alteration
X00063175-P1
10/10/2018
Permit issued — Sidewalk Shed
X00063172-I1-SH
10/05/2018
Permit issued — Supported Scaffold
X00063175-I1-SF
Latest 60 of 99 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.05/22/2024
DOB NOWGeneral ConstructionSigned-offSIGNATURE CONSTRUCTION GR05/21/2024
DOB NOWMechanical SystemsPermit IssuedSIGNATURE CONSTRUCTION GR05/21/2024
DOB NOWSidewalk ShedSigned-offEXPERT GROUPENTERPRISE IN10/10/2018
DOB NOWSupported ScaffoldSigned-offEXPERT GROUPENTERPRISE IN10/05/2018
DOB NOWSidewalk ShedSigned-offEXPERT GROUPENTERPRISE IN07/19/2018
DOB NOWSupported ScaffoldSigned-offEXPERT GROUPENTERPRISE IN07/19/2018
BISOTISSUEDA & S WATERPROOFING & RES07/06/2018
BISPLISSUEDPIPE RITE CORP10/02/2017
BISOTISSUEDRND SERVICES LLC09/02/2016
BISPLISSUEDPIPE RITE CORP07/07/2016
BISMHISSUEDEMPIRE COMMERCIAL CORP07/05/2016
BISFPISSUEDLUND FIRE PRODUCTS CO INC12/11/2013
BISFBISSUEDRICHARD MORTMAN01/09/2006
BISFPISSUEDLUND FIRE PRODUCTS CO INC09/19/2005
BISOTISSUEDVLAD RESTORATION LTD10/06/2003
BISEQISSUEDCOLGATE SCAFFOLDING09/23/2003
BISEQISSUEDCOLGATE SCAFFOLDING09/23/2003
BISFBISSUEDNEAL M. RUDIKOFF06/05/1995
1 project · most recent 10/08/2024
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
10/08/2024Permit IssuedSIGNATURE CONSTRUCTION GRAir Conditioning Systems, Ventilation Systems
Cooling
Friedrich KCS12A30A 12,000 tons · Ptac ×96
Ventilation
Greenheck CP-A390-VG 150 CFM · Exhaust Fan ×4
CSP-A700-VG 220 CFM · Exhaust Fan ×4
1 project · most recent 10/08/2024
Water/Sanitary
FiledStatusContractorScope
10/08/2024Signed-offAMERICAN STANDARD P&H CORWater/Sanitary
2 projects · most recent 05/28/2024
General Wiring
FiledStatusContractorScope
05/28/2024CompleteMAUCERI ELECTRIC CORP.General Wiring
07/19/2018Permit IssuedMEO ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
08/08/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/09/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/26/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/12/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
12/10/2025Fire-Resistant Penetrations and Joints—special
11/17/2025Final—progress
10/09/2024Mechanical SystemsMax Leespecial
10/09/2024FinalMax Leeprogress
10/09/2024Maintenance informationMax Leeenergy_progress
09/30/2024Maintenance informationMax Leeenergy_progress
09/30/2024Mechanical SystemsMax Leespecial
09/30/2024FinalMax Leeprogress
07/18/2024Maintenance informationMax Leeenergy_progress
07/18/2024Fire-Resistant Penetrations and JointsMax Leespecial
07/18/2024Energy Code Compliance InspectionsMax Leeprogress
07/18/2024HVAC-R and service water piping design and insulationMax Leeenergy_progress
07/16/2024Fire-Resistant Penetrations and JointsMax Leespecial
07/16/2024Maintenance informationMax Leeenergy_progress
07/16/2024Energy Code Compliance InspectionsMax Leeprogress
07/16/2024Maintenance informationMax Leeenergy_progress
07/16/2024HVAC-R and service water piping design and insulationMax Leeenergy_progress
07/16/2024Fire-Resistant Penetrations and JointsMax Leespecial
07/16/2024FinalMax Leeprogress
07/16/2024Fire-Resistance Rated ConstructionMax Leeprogress
07/16/2024Mechanical SystemsMax Leespecial
07/16/2024FinalMax Leeprogress
07/16/2024HVAC-R and service water piping design and insulationMax Leeenergy_progress
07/16/2024HVAC-R and service water heating equipmentMax Leeenergy_progress
07/16/2024HVAC-R and service water heating system controlsMax Leeenergy_progress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Bold Charter SchoolEducationCellar, Floor 4
Project X01020137 Alteration · Permit Entire · 05/06/2024
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 165 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch13
08/26/2026X00063172-I1Request digital key ↗
08/26/2026X00063175-P1Request digital key ↗
08/26/2026X00063175-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold2
08/26/2026X00063175-I1Request digital key ↗
08/15/2026X00063175-P2Request digital key ↗
▸Applications & Permits24
▸BISPLAN / WORK APPROVAL APPLICATION15
08/26/2019240227152Open ↗
06/27/2018240227152Open ↗
09/18/2017220547068Open ↗
Showing 3 of 15 on file for this type
▸BISWORK PERMIT APPLICATION9
06/27/2018240227152Open ↗
09/06/2016220547068Open ↗
07/07/2016220518866Open ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications49
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/26/2026X00063172-I1Open ↗
08/26/2026X00063175-P2Open ↗
08/26/2026X00063175-P1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
09/27/2026X01020137-P5Open ↗
09/27/2026X01020137-P5Open ↗
09/01/2026X01020137-S2Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
08/27/2019240227152Open ↗
07/30/2018220518866Open ↗
09/22/2017220547068Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/27/2026X01020137-P5Open ↗
09/01/2026X01020137-S2Open ↗
08/27/2026X01020137-P6Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
06/27/2018240227152Open ↗
08/24/2016220547068Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
09/18/2017220547068Open ↗
08/24/2016220547068Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
06/27/2018240227152Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/27/2018240227152Open ↗
▸Trade Schedules & Equipment11
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT6
08/15/2018220518866Open ↗
06/27/2017220518866Open ↗
06/08/2017220518866Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
09/15/2017220518866Open ↗
08/11/2017220518866Open ↗
12/05/2016220518866Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING1
12/02/2013220346720Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
08/24/2016220547068Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/20/2026X01020137-S2Open ↗
08/20/2026X01020137-S1Open ↗
08/20/2026X01020137-I1Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)2
06/27/2018240227152Open ↗
06/13/2016220518866Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
08/24/2016220547068Open ↗
12/02/2013220346720Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/17/2026X01326297-I1Open ↗
08/13/2026X01320129-I1Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
08/28/2019240227152Open ↗
09/18/2018220518866Open ↗
07/30/2018220518866Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
08/27/2019240227152Open ↗
07/30/2018220518866Open ↗
09/22/2017220547068Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
06/27/2018240227152Open ↗
▸BISNYCECC ANALYSIS1
06/27/2018240227152Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
06/27/2018240227152Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
06/27/2018240227152Open ↗
▸Approvals, Objections & Sign-offs24
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter14
08/17/2026X01326297-I1Open ↗
08/13/2026X00063175-P2Open ↗
08/13/2026X01020137-S2Open ↗
Showing 3 of 14 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST7
08/27/2019240227152Open ↗
09/18/2018220518866Open ↗
09/05/2018220518866Open ↗
Showing 3 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
09/22/2017220547068Open ↗
03/11/2016220518866Open ↗
12/19/2013220346720Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT8
08/27/2019240227152Open ↗
07/30/2018220518866Open ↗
07/30/2018220518866Open ↗
Showing 3 of 8 on file for this type
▸Filing & Intake Forms11
▸BISBOROUGH INTAKE FORM5
08/27/2019240227152Open ↗
09/18/2018220518866Open ↗
09/05/2018220518866Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET3
08/24/2016220547068Open ↗
03/11/2016220518866Open ↗
12/02/2013220346720Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
06/27/2018240227152Open ↗
12/19/2013220346720Open ↗
▸BISADDITIONAL INFORMATION1
09/27/2017220518866Open ↗
▸Other Documents1
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
08/13/2026X00063172-I1Open ↗