← Back
Two family frame
WEST 13 STREET
BROOKLYN · Gravesend (West) · BIN 3426228
💬 Discuss this project
2022Year Built
3Stories
B2Building Class
R5BZoning
2,675 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family frame · Owner of record: SITA CORP. · 2,000 sf lot · 1.34 FAR built · Flood zone X
Locations of Work
StructuralMechanicalPlumbingFire ProtectionCivil
Roof5p · 1 filing · 6 docs
Floor 324p · 5 filings · 20 docs
Floor 224p · 4 filings · 20 docs
Floor 122p · 4 filings · 20 docs
Cellar27p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JIN SUN CONSTRUCTION603/22/2026
JJK BUILDING CONSULTING103/22/2026
SITA703/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
1+1 DESIGN STUDIO LLC1004/26/2024
A&B WORLD CONSULTING401/30/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
YBL NY1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JJK BUILDING CONSULTINGGeneral Contractor707/08/2026
XH&RC PLBG AND HTG INCPlumbing307/08/2026
XH&RC PLBG AND HTG INCFire Protection207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
1+1 DESIGN STUDIO LLC1039904/26/2024
A&B WORLD CONSULTING, INC5704401/30/2024
Building Lifecycle
All (77)Filed (14)Permit Issued (8)Signed Off (5)Violation (7)Inspection (9)Objection (4)Special Inspection (30)
01/15/2025
Signed off — Alteration
File Earth Work, Foundation & Structure work in conjunction with NB BIS#340735556
B00597265-I1
01/13/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
01/02/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
08/27/2024
Signed off — Alteration
Install new sprinkler system and water service in conjunction with architectural job# 340735556.
B00344713-I1
07/31/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/17/2024
Permit issued — Plumbing
B00344713-I1-PL
07/05/2024
Signed off — Alteration
Plumbing in-conjunction with NB #340735556
B08000557-I1
05/08/2024
Signed off — Alteration
MS work filed in-conjunction with NB #340735556
B00358338-I1
05/02/2024
Objection resolved — Addressed
05/01/2024
Objection raised — Fire_Protection
04/26/2024
Filed — Alteration
MS work filed in-conjunction with NB #340735556
B00358338-P1
04/23/2024
Special inspection requirement — Chimneys and vents
Zi Mai
04/23/2024
Special inspection requirement — Fire-Resistance Rated Construction
Zi Mai
04/23/2024
Special inspection requirement — Shutoff dampers
Zi Mai
04/23/2024
Special inspection requirement — Maintenance information
Zi Mai
04/23/2024
Special inspection requirement — Permanent certificate
Zi Mai
04/23/2024
Special inspection requirement — Final
Zi Mai
04/23/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Zi Mai
04/23/2024
Special inspection requirement — Mechanical Systems
Zi Mai
04/23/2024
Special inspection requirement — Heating Systems
Zi Mai
04/23/2024
Special inspection requirement — Energy Code Compliance Inspections
Zi Mai
04/23/2024
Special inspection requirement — HVAC and service water heating system controls
Zi Mai
04/23/2024
Special inspection requirement — HVAC and service water heating equipment
Zi Mai
02/23/2024
Permit issued — Plumbing
B00344713-I1-EW-SP
02/23/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/15/2024
Permit issued — Mechanical Systems
B00358338-I1-MS
02/07/2024
Special inspection requirement — Maintenance information
Alexander Bomstein
02/07/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alexander Bomstein
02/07/2024
Special inspection requirement — Sprinkler Systems
Alexander Bomstein
01/30/2024
Filed — Alteration
Install new sprinkler system and water service in conjunction with architectural job# 340735556.
B00344713-P3
01/29/2024
Special inspection requirement — Maintenance information
Alexander Bomstein
01/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alexander Bomstein
01/29/2024
Special inspection requirement — Sprinkler Systems
Alexander Bomstein
12/04/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/15/2023
Objection resolved — Addressed
10/18/2023
Objection raised — Structural
10/15/2023
Filed — Alteration
Install new sprinkler system and water service in conjunction with architectural job# 340735556.
B00344713-P2
07/20/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Zi Mai
07/20/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Zi Mai
07/20/2023
Special inspection requirement — Energy Code Compliance Inspections
Zi Mai
07/19/2023
Filed — Alteration
Plumbing in-conjunction with NB #340735556
B08000557-P1
06/27/2023
Signed off — Alteration
INSTALLATION OF 240 LINEAR FEET X 8 FEET HEIGHT CONSTRUCTION FENCE
B00421605-I1
03/24/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/24/2023
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
03/24/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
03/24/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/28/2022
Permit issued — Plumbing
B08000557-I1-PL
11/28/2022
Permit issued — Sprinklers
B00344713-I1-EW-SP
11/23/2022
Violation issued (ECB, closed)
Construction
11/23/2022
Violation issued (ECB, closed)
Construction
11/23/2022
Violation issued (ECB, closed)
Unknown
11/23/2022
Violation issued (ECB, closed)
Unknown
11/23/2022
Violation issued (ECB, closed)
Construction
11/17/2022
Special inspection requirement — Structural Steel - Welding
Zi Mai
11/17/2022
Special inspection requirement — Concrete - Cast-In-Place
Zi Mai
11/17/2022
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Zi Mai
11/17/2022
Special inspection requirement — Subgrade Inspections
Zi Mai
11/17/2022
Special inspection requirement — Structural Cold-Formed Steel
Zi Mai
11/17/2022
Special inspection requirement — Structural Steel - High Strength Bolting
Zi Mai
11/17/2022
Special inspection requirement — Footing and Foundation
Zi Mai
Latest 60 of 77 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offXH&RC PLBG AND HTG INC07/17/2024
DOB NOWPlumbingSigned-offXH&RC PLBG AND HTG INC02/23/2024
DOB NOWMechanical SystemsSigned-offJJK BUILDING CONSULTING02/15/2024
DOB NOWPlumbingSigned-offXH&RC PLBG AND HTG INC11/28/2022
DOB NOWSprinklersSigned-offXH&RC PLBG AND HTG INC11/28/2022
DOB NOWConstruction FenceSigned-offJJK BUILDING CONSULTING10/25/2022
DOB NOWEarth WorkSigned-offJJK BUILDING CONSULTING10/29/2021
DOB NOWConstruction FenceSigned-offJJK BUILDING CONSULTING10/25/2021
BIS—ISSUEDJIN SUN CONSTRUCTION INC05/15/2023
BIS—ISSUEDJIN SUN CONSTRUCTION INC06/14/2022
BIS—ISSUEDJJK BUILDING CONSULTING01/27/2022
1 project · most recent 11/07/2022
General Wiring
FiledStatusContractorScope
11/07/2022CompleteAL-LECTRIC ELECT'L CONTRGGeneral Wiring
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
01/13/2025Pass-Final General Construction Non-Directive 14PassView ↗
01/02/2025Fail-Final General Construction Non-Directive 14FailView ↗
07/31/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/23/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/04/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/24/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/24/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
03/24/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/24/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 68
DateRequirementInspectorRole
04/23/2024HVAC and service water heating system controls Zi Maienergy_progress
04/23/2024Permanent certificateZi Maienergy_progress
04/23/2024Shutoff dampersZi Maienergy_progress
04/23/2024Fire-Resistance Rated ConstructionZi Maiprogress
04/23/2024HVAC and service water heating equipment Zi Maienergy_progress
04/23/2024Maintenance informationZi Maienergy_progress
04/23/2024Chimneys and ventsZi Maispecial
04/23/2024Fire-Resistant Penetrations and JointsZi Maispecial
04/23/2024Heating SystemsZi Maispecial
04/23/2024Mechanical SystemsZi Maispecial
04/23/2024Energy Code Compliance InspectionsZi Maiprogress
04/23/2024FinalZi Maiprogress
02/07/2024Sprinkler SystemsAlexander Bomsteinspecial
02/07/2024Fire-Resistant Penetrations and JointsAlexander Bomsteinspecial
02/07/2024Maintenance informationAlexander Bomsteinenergy_progress
01/29/2024Fire-Resistant Penetrations and JointsAlexander Bomsteinspecial
01/29/2024Sprinkler SystemsAlexander Bomsteinspecial
01/29/2024Maintenance informationAlexander Bomsteinenergy_progress
07/20/2023Energy Code Compliance InspectionsZi Maiprogress
07/20/2023Fire-Resistant Penetrations and JointsZi Maispecial
07/20/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationZi Maispecial
11/17/2022Footing and FoundationZi Maiprogress
11/17/2022MasonryZi Maispecial
11/17/2022Structural Steel - DetailsZi Maispecial
11/17/2022Subgrade InspectionsZi Maispecial
Latest 25 of 68.
▾Documents — 185 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch6
08/28/2026B08000557-I1Request digital key ↗
08/28/2026B08000557-P1Request digital key ↗
08/28/2026B00597265-A2Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Plumbing5
09/02/2026B00344713-I1Request digital key ↗
09/02/2026B00344713-P3Request digital key ↗
09/02/2026B00344713-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler4
09/02/2026B00344713-P3Request digital key ↗
09/02/2026B00344713-P1Request digital key ↗
09/02/2026B00344713-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/01/2026B00358338-I1Request digital key ↗
08/14/2026B00358338-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/01/2026B00421605-I1Request digital key ↗
▸Applications & Permits17
▸BISPLAN / WORK APPROVAL APPLICATION10
10/07/2024340735556Open ↗
04/10/2024321937099Open ↗
08/22/2023340735556Open ↗
Showing 3 of 10 on file for this type
▸BISWORK PERMIT APPLICATION5
06/14/2022340735556Open ↗
01/28/2022340735556Open ↗
01/28/2022340735556Open ↗
Showing 3 of 5 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
09/29/2023340735690Open ↗
06/26/2020340735690Open ↗
▸Zoning, Tax Lot & Property Records8
▸BISZONING DIAGRAM3
09/29/2023340735556Open ↗
12/08/2021340735556Open ↗
04/20/2021340735556Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
03/19/2021340735556Open ↗
▸BISVERIFY TAX LOT1
10/02/2024340735556Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
12/16/2020340735556Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
10/01/2024340735556Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
03/19/2021340735556Open ↗
▸Seals & Professional Certifications49
▸DOB NOWSpecial Inspector Seal & Signature15
09/01/2026B00597265-I1Open ↗
08/29/2026B00344713-I1Open ↗
08/29/2026B00344713-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
09/01/2026B00597265-I1Open ↗
08/29/2026B00344713-I1Open ↗
08/29/2026B00597265-A2Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
09/01/2026B00421605-I1Open ↗
08/28/2026B08000557-I1Open ↗
08/28/2026B08000557-P1Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
09/22/2020340735556Open ↗
06/26/2020340735690Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
01/05/2022340735556Open ↗
03/26/2019321937099Open ↗
▸BISAPPLICANT OWNER SIGNATURE2
09/22/2020340735556Open ↗
06/26/2020340735690Open ↗
▸Trade Schedules & Equipment6
▸BISDEP SANITARY SEWER CERTIFICATION (HCP/SCP)2
08/28/2024340735556Open ↗
04/29/2021340735556Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
08/22/2024340735556Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
08/22/2024340735556Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
03/26/2019321937099Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
01/16/2025340735556Open ↗
▸Safety & Tenant Protection8
▸BISSTREET TREE CHECKLIST3
09/22/2020340735556Open ↗
06/26/2020340735690Open ↗
03/26/2019321937099Open ↗
▸BISSTREET TREE SIGNOFF2
10/01/2024340735556Open ↗
02/29/2024340735690Open ↗
▸BISTenant Protection Plan and Notes2
09/22/2020340735556Open ↗
03/26/2019321937099Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
10/14/2021340735556Open ↗
▸Energy Compliance14
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
03/03/2021340735556Open ↗
09/22/2020340735556Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026B00358338-I1Open ↗
08/13/2026B00344713-I1Open ↗
▸BISINTERIOR LIGHTING POWER1
08/22/2024340735556Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
08/22/2024340735556Open ↗
▸BISFENESTRATION AREAS1
08/22/2024340735556Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
08/22/2024340735556Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
10/01/2024340735556Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
08/22/2024340735556Open ↗
▸BISLIGHTING IN DWELLING UNITS1
08/22/2024340735556Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
08/22/2024340735556Open ↗
▸BISLIGHTING CONTROLS1
08/22/2024340735556Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
03/26/2019321937099Open ↗
▸Inspections & Test Reports21
▸BISTECHNICAL REPORT: RESPONSIBILITY5
01/16/2025340735556Open ↗
12/28/2021340735556Open ↗
09/22/2020340735556Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
10/07/2024340735556Open ↗
08/29/2024340735556Open ↗
08/27/2024340735556Open ↗
▸BISSTRUCTURAL STEEL - WELDING2
08/22/2024340735556Open ↗
08/22/2024340735556Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
08/22/2024340735556Open ↗
08/22/2024340735556Open ↗
▸BISBPP: FIELD INSPECTION1
02/29/2024340735690Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
12/28/2021340735556Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
08/22/2024340735556Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
08/22/2024340735556Open ↗
▸BISMASONRY1
08/22/2024340735556Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
08/22/2024340735556Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
08/22/2024340735556Open ↗
▸BISSOIL REPORT1
09/22/2020340735556Open ↗
▸BISSOIL PERC. TEST-PVT ON-SITE STORM WATER DRAINAGE DISPOSAL SYS & DET. FACL.1
08/22/2024340735556Open ↗
▸Approvals, Objections & Sign-offs3
▸BISSCHEDULE A - OCCUPANCY / USE3
03/03/2021340735556Open ↗
03/26/2019321937099Open ↗
09/22/2020340735556Open ↗
▸Cost, Insurance & Ownership2
▸BISBPP-11 - Affidavit as to Roadway Pavement And/Or Sidewalk and Curb Construction1
03/01/2024340735690Open ↗
▸BISBPP: ENGINEERS AFFIDAVIT1
02/29/2024340735690Open ↗
▸Filing & Intake Forms8
▸BISADDITIONAL INFORMATION5
08/29/2024340735556Open ↗
09/26/2023340735556Open ↗
12/28/2021340735556Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
09/22/2020340735556Open ↗
06/26/2020340735690Open ↗
▸BISEFILING COVER SHEET1
03/26/2019321937099Open ↗
▸Other Documents10
▸BISBPP - SUPPORTING DOCUMENTATION2
09/29/2023340735556Open ↗
06/26/2020340735690Open ↗
▸BISBPP-PARKS: PLANT NEW TREE1
03/01/2024340735690Open ↗
▸BISLOWEST FLOOR ELEVATION1
01/16/2025340735556Open ↗
▸BISBPP: FINAL AS-BUILT PHOTOGRAPHS1
02/29/2024340735690Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
05/12/2021340735690Open ↗
▸BISSTRUCTURAL COLD-FORMED STEEL1
08/22/2024340735556Open ↗
▸BISBPP: FILING REQUIRED1
09/22/2020340735556Open ↗
▸BISBPP: AS-BUILT SIDEWALK SURVEY1
02/29/2024340735690Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00597265-I1Open ↗